Loading...
32A-083 46-50 Graves St Northampton MA construction-control-document-initialVersion 06_11_2013 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Structural Framing repair Date:6-6-2017 Property Address: 46-50 Graves Street, Northampton MA Project: Check (x) one or both as applicable: XXX New construction XX Existing Construction Project description: Provide new and repaired wood framing to portions of the roof and 3rd floor areas. I Thomas Mierzwa, P.E. MA Registration Number: 47968 Expiration date: 6-30-2018 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning1: Architectural XX Structural Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’. Enter in the space to the right a “wet” or electronic signature and seal: Phone number: 413-775-3429 Email: thomasamierzwa@gmail.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an ‘x’ project design plans, computations and specifications that you prepared or directly supervised. If ‘other’ is chosen, provide a description. 6-6-2017