Loading...
219 Application Disposal System 2018 4. (ava-;) . INV Commonwealth ofei ? Massachusetts ) / ��/g w City/Town of x(/07 einq N Number 7 Application for DisposalCD N JA System Construction Permit Fees 1J f ,c,25:3()a Form 1A ipCue DEP has provided this form for use by local Boards of Health if they choose to do so. Before using the form, check with your local Board of Health to make sure that they will accept itsi , A. Facility Information Important:When lication is hereby made for a permit to: 0 Construct a new on-site sewage disposal system filling out forms on ❑ Repair or replace an existing on-site sewage disposal system the computer,use Repair or replace an existing system component movev the your key r / \ cursor- t do not use the Location of Facility: return key. +� tar 302i l J /Li /1',f�rtiAddreae o{ I EA (1053 Lstars 71n f'.ndm City/Town :1 2. Owner Information i� ir . ) GnI �t / ' Hsi, r' ,�� eFl Name . ;u Address different f•m above) OlOtae O/ Ai Ai , ' City/Town State xin norm Telephone Number li q • 3. Installer Info alion ' Name /7/ le� �wA� Na a of Company 17 Ad r5 ems L/ / / ! State ]m rnda City/Town ,,^s' Telephone Number tile t ttl 4. Designerinformation / // O/�� / nM U/ii ---15 '74 /4etn I� li. Name Name of Company 1Application for Disposal System Construction Permit t5forml atloc 06/03 Page 1 of 3 *. 9) Commonwealth of ~ ����. ,� n» Massachusett • soh,✓ �D/8 9 City/Town of D/ /� Y/ Number Application for Dispo al / , �, System Construction Permit $ • Form 1A Fee ra72 laio er5P/chr /4- A )4 Nature of Ree p Alterations or Alterations Of applicable): k t. • • • • Date last inspected: Date B. Agreement The undersigned agrees to ensure the construction and maintenance of the aforedescribed on-site sewage disposal stem in accordance with the provisions of Title 5 of the Environmental Code and (;"t S 1% ) zoi3 74 Signal e d Warn Appli ton Approved B : , 1 6//gAl Name_ nate • Application Disapproved for the following reasons: �t �„ 0('�(t't-D r. /wwI IuJJJJ❑❑❑Ulllllllll) �IIVVJIIfII�fLs, l�f�JfJ/D/ ('� ,7D/8— GOJi 14ao1,,Amir VI< SOARDOFHEALTH caneinma: 212 MAIN STREET :::777 I).SvstemDesigner must inspect and verify htesddng NORTHAMPTON, MA 01060 4 • That the sewage disposal system was installed In accordance with the approved plans and Title 5. 1 2).If this is a systan with the S.A.S.constructed in };r Title Sfill the Systemionofhewa tedaeaprioer must conductacemen FILE COPY inspection of the wanted eraprraato the placement 4$ of the fill. 3).No changes en be made during contraction by IS Installer without prior approval by both the System Designer and the Board ofHudthAgent. tdionnia.6406815fililloadl Application for Disposal System Construction Permit • j Page 3 of 3 i v