219 Application Disposal System 2018 4.
(ava-;)
. INV
Commonwealth ofei
? Massachusetts ) / ��/g
w City/Town of x(/07 einq N Number
7 Application for DisposalCD N
JA System Construction Permit Fees 1J f ,c,25:3()a Form 1A ipCue
DEP has provided this form for use by local Boards of Health if they choose to do so. Before using
the form, check with your local Board of Health to make sure that they will accept itsi ,
A. Facility Information
Important:When lication is hereby made for a permit to: 0 Construct a new on-site sewage disposal system
filling out forms on ❑ Repair or replace an existing on-site sewage disposal system
the computer,use Repair or replace an existing system component
movev the your key r / \
cursor-
t do not use the Location of Facility:
return key. +� tar
302i l J /Li /1',f�rtiAddreae o{ I EA (1053
Lstars 71n f'.ndm
City/Town
:1
2. Owner Information
i�
ir .
) GnI �t /
' Hsi, r' ,�� eFl
Name
.
;u Address different f•m above) OlOtae
O/
Ai Ai
, '
City/Town State xin norm
Telephone Number
li q
•
3. Installer Info alion
' Name
/7/ le� �wA� Na a of Company
17 Ad r5 ems L/ / /
! State ]m rnda
City/Town
,,^s' Telephone Number tile
t ttl 4. Designerinformation / // O/��
/ nM U/ii ---15 '74 /4etn I�
li. Name Name of Company
1Application for Disposal System Construction Permit
t5forml atloc 06/03 Page 1 of 3
*. 9)
Commonwealth of
~ ����. ,� n» Massachusett
• soh,✓ �D/8 9
City/Town of D/ /� Y/ Number
Application for Dispo al / , �,
System Construction Permit $
• Form 1A Fee
ra72 laio er5P/chr /4- A )4
Nature of Ree p Alterations or Alterations Of applicable):
k
t.
•
•
•
• Date last inspected:
Date
B. Agreement
The undersigned agrees to ensure the construction and maintenance of the aforedescribed on-site
sewage disposal stem in accordance with the provisions of Title 5 of the Environmental Code and
(;"t S 1% ) zoi3
74 Signal e d Warn
Appli ton Approved B : ,
1 6//gAl
Name_ nate
•
Application Disapproved for the following reasons: �t �„ 0('�(t't-D
r. /wwI IuJJJJ❑❑❑Ulllllllll) �IIVVJIIfII�fLs,
l�f�JfJ/D/ ('� ,7D/8—
GOJi
14ao1,,Amir VI< SOARDOFHEALTH
caneinma: 212 MAIN STREET
:::777 I).SvstemDesigner must inspect and verify htesddng NORTHAMPTON, MA 01060
4 • That the sewage disposal system was installed
In accordance with the approved plans and Title 5.
1 2).If this is a systan with the S.A.S.constructed in
};r Title Sfill the Systemionofhewa tedaeaprioer must conductacemen FILE COPY
inspection of the wanted eraprraato the placement
4$ of the fill.
3).No changes en be made during contraction by IS
Installer without prior approval by both the System
Designer and the Board ofHudthAgent.
tdionnia.6406815fililloadl Application for Disposal System Construction Permit •
j Page 3 of 3
i
v