Loading...
39A-067 MTS-Multi-Pole-Addendum-Rev-2.4 To the 8” Series Top of Pole Mount www.mtsolar.us 844-MT-SOLAR (687-6527) Multi-Pole Addendum 2 MPM Installation Guide Addendum 204: Follow steps 116—119 in the 8” Series Installation Guide to install rails and solar modules. Plan the layout of your rails according to your solar module configura- tion. Leave out the necessary modules to allow for the 8” pipe. 201 203 B 202 203 A 204 201: Install 8” Pipes with appropriate spacing, along an E/W line. 202: Follow steps 101—113 in the 8” Series Installation Guide to install steel framework on each pole. 203: Using 1/2” x 1 1/4” bolts and 1/2” nuts and split washers, splice I-beams together with additional I-beam sections and (if applicable) splice wings on the ends of the Beam sections. 3 205 206 205: Raise and or tilt the array to facilitate module installation and/or module wiring and wire management as needed. 206: Raise the array to the top of the poles and follow steps 122—125 in the 8” Series Installation Guide to complete the installation.