Loading...
32A-166 BORSON D-1FIRST FLOOR DEMOLITION PLANSCALE: 1/4" = 1'-0"1DNDN 1RUP 14R DN KITCHENLIVING ROOMDINING ROOMDNGARAGEDN 1RREFR.DWCLOSETCLOSETFRONT PORCHRANGEREMOVE CLOSET WALLSAND DOOR. PATCH CEILING,WALLS, AND FLOOR AS REQUIRED.REMOVE ALL KITCHEN CABINETS AND APPLIANCES.REMOVE WALL. PATCH CEILING AND FLOOR AS REQUIRED TOMATCH EXISTING SURFACES.REMOVE DOORS, TRIM, AND PARTITIONS.PATCH REMAINING WALLS AND FLOORAS REQUIRED.BASEMENT DEMOLITION/EXCAVATION PLAN2MECHANICAL ,STORAGE ROOMUP 1/4" = 1'-0"EXISTINGCLOSETEXISTINGCLOSETFURN.DHWLOWERHALLEXCAVATE FORBILCO 'SCAPEWELL'4862-42BOXED-INDUCT OVERHEAD5'-2"3'-0"3'-0"5'-4"REMOVE PORTION OF WALLTO CUT CONCRETEFOUNDATION FOR INSTAL-LATION OF EGRESS WINDOWREMOVE CLOSET FLOORPLATFORM.1/2 BATHNO WORKDN 2RENLARGEOPENINGFOR 3'-0"DOORCONCRETEmlCONSTRUCTASSOCIATES, INC.36 SERVICE CENTERNORTHAMPTON, MA 01060tel: 584-1224 fax: 584-7504FIRST FLOORAND BASEMENT DEMOLITION PLANSD-11/4" = 1'-0"EXISTING CONDITIONS AT:RACHELBORSONRESIDENCE 14 BIXBY COURTNORTHAMPTON, MA 01060BABA123CCDrawn ByDate Issue 1231-27-12REVISED2-13-12REVISED3-12-12CONTRACT SET