Loading...
32C-052 Secondary_C_C_Document_TDA_ARCHCity of Northampton Massachusetts DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street ● Municipal Building Northampton, MA 01060 INSPECTOR Louis Hasbrouck Fax: 413-587-1272 Chuck Miller Building Commissioner Phone: 413-587-1240 Assistant Commissioner SECONDARY CONSTRUCTION CONTROL DOCUMENT (For professional Engineers/Architects responsible for a portion of a controlled project) Project Title:______________________________________________ Date:__________________________ Project Location:___________________________________________ Map:_____ Parcel:_____ Zone:_____ Scope of Project:__________________________________________________________________________ In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6: I, _______________________________________________________ Mass. Registration # ______________, being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Fire Protection [ ] Architectural [ ] Structural [ ] Mechanical [ ] Electrical [ ] Other (specify) ___________________________________________________________________ for the above named project and that to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable Laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory Completion of the above mentioned work. Signature and Seal of Registered Professional _____________________________________ _____Day of _______________20____ (seal)