G704-2000 - Form Draft - 2013-08-12 AIA® Document G704TM – 2000 Certificate of Substantial Completion AIA Document G704™ – 2000. Copyright © 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 15:38:14 on 08/09/2013 under Order No.3252469288_1 which expires on 12/31/2013, and is not for resale. User Notes: (1749312120) 1 PROJECT: PROJECT NUMBER: 154059/ CONTRACT FOR: General Construction CONTRACT DATE: November 1, 2012 OWNER: ARCHITECT: CONTRACTOR: FIELD: OTHER: (Name and address) Smith College: Cutter-Ziskind House - Phase 1B Interior Renovations 79 Elm Street Northampton, MA 01063 TO OWNER: TO CONTRACTOR: (Name and address) (Name and address) The Trustees of Smith College 126 West Street Northampton, MA 01063 Consigli Construction Co. 72 Summer Street Milford, Conneticut 01757 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Phase 1B - Interior Renovations DESCRIPTION HERE The Work performed under this Contract has been reviewed and found, to the Architect’s best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty Date of Commencement ARCHITECT BY DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of Substantial Completion. CONTRACTOR BY DATE The Owner accepts the Work or designated portion as substantially complete and will assume full possession at (time) on (date). OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner’s and Contractor’s legal and insurance counsel should determine and review insurance requirements and coverage.)