Loading...
ADDENDUM No 4 - ArchProj. No. 11011 Residence Conversions 12/16/2011 Smith College, Northampton, MA ADDENDUM NO. 3 1 December 27, 2011 ADDENDUM No. 4: This addendum modifies the drawings and specifications dated October 7, 2011. General Contractors are responsible for distribution of the addendum to the sub- contractors. Please acknowledge receipt of this addendum in the appropriate location on the bid form. This addendum consists of 4 pages and 7 attachments and amends the drawings and specifications as follows: GENERAL: The time of the bid is Wednesday, January 4, 2012 at 2pm. Attached is a revised bid form. DRAWINGS: 58 KENSINGTON 58.4.1) Drawing D1.1: Add the following note: ‘ Where partitions are indicated to be totally removed or in part for new openings, plaster demolition will be by others under separate contract.’ 58.4.2) Drawing D1.1: Add the following note: ‘Existing plaster ceilings on the first and second floors will be removed by others under separate contract.’ 58.4.3) Drawing D1.1: Add the following note: ‘Cutting and Patching required for MEP trades in existing partitions is part of the work under this contract.’ 58.4.4) Drawing A2.1: Add the following note: ‘See Alternates for replacement of existing siding with Hardi-plank smooth faced siding over Tyvek House Wrap.’ Proj. No. 11011 Residence Conversions 12/16/2011 Smith College, Northampton, MA ADDENDUM NO. 3 2 58.4.5) Drawing A2.1: North Elevation: Add the following note: ‘Replace existing exterior door trim at all porch entrances. Replace wood cap and wood shingle siding at second and third floor porches and add Hardipanel over wood facing on interior surfaces to completely encapsulate existing painted wood.’ 58.4.6) Drawing A2.2: Building Section: Change the notes that read “ Add 1 layer Type-X over exg plaster” to read ‘5/8” Type-X on 1x3 Wd Strapping.’ 57 DRYADS GREEN 57.4.1) Drawing D1.1: Add the following note: ‘Where partitions are indicated to be totally removed or in part for new openings, plaster demolition will be by others under separate contract’. 57.4.2) Drawing D1.1: Add the following note: ‘Existing plaster ceilings on the first and second floors will be removed by others under separate contract’. 57.4.3) Drawing D1.1: Add the following note: ‘Cutting and Patching required for MEP trades in existing partitions is part of the work under this contract’. 57.4.4) Drawing A2.1: Add the following note: ‘Replace existing handrail at front porch’. 57.4.5) Drawing A3.1: Building Section: Change the notes that read “ Add 1 layer Type-X over exg plaster” to read ‘5/8” Type-X on 1x3 Wd Strapping’ 72 DRYADS GREEN 72.4.1) Drawing D1.1: Add the following note: ‘Where partitions are indicated to be totally removed or in part for new openings, plaster demolition will be by others under separate contract.’ 72.4.2) Drawing D1.1: Add the following note: ‘Existing plaster ceilings on the first and second floors (not including slopes) will be removed by others under separate contract.’ Proj. No. 11011 Residence Conversions 12/16/2011 Smith College, Northampton, MA ADDENDUM NO. 3 3 72.4.3) Drawing D1.1: Add the following note: ‘Cutting and Patching required for MEP trades in existing partitions is part of the work under this contract.’ 72.4.4) Drawing A2.1: Add the following note: ‘Remove and replace existing corner boards from water table up to underside of eave, porch ceiling or transition to shingles.’ 72.4.5) Drawing A2.1 – East Elevation: Add the following note: ‘Replace existing trim, skirts, lattice and wood siding infill panel on side porch.’ 72.4.6) Drawing A3.1: Add the following note to the building sections to the existing second floor ceiling/third floor assembly: ‘1/2” Gyp Bd over 1x3 Strapping.’ 72.4.7) Drawing A3.1: Add the words ‘over 1x3 Strapping’ to the notes that read ‘Add 5/8” Type-X.’ SPECIFICATIONS: Spec 4.1: SECTION 012300 – Alternates; page 2: Add the following paragraph 3.1.D: D. Alternate No. 4 (58 Kensington only): State the amount to replace the existing wood clapboards with hardiplank composite siding over tyvek. Attachments: Revised Bid Form End of Addendum No. 3