Loading...
ADDENDUM No 2 - ArchProj. No. 11011 Residence Conversions 12/09/2011 Smith College, Northampton, MA ADDENDUM NO. 2 1 December 9, 2011 ADDENDUM No. 2: This addendum modifies the drawings and specifications dated October 7, 2011. General Contractors are responsible for distribution of the addendum to the sub- contractors. Please acknowledge receipt of this addendum in the appropriate location on the bid form. This addendum consists of 2 pages and amends the drawings and specifications as follows: INSTRUCTIONS TO BIDDERS: Change the time of the bids to be Tuesday, December 20, 2011 @ 2pm. Special Certification Requirements for General Contractor. State Regulations require work removed as part of a deleading project be replaced by workers with equivalent qualifications. For this reason, the General Contractor will be required to have a supervisor and two carpenters be certified for deleading work and the Contractor shall have the required deleader’s license. This requirement requires each individual to receive 40 hours of training and license fees for the Contractor. The Owner’s intent is to identify in tabular form the scope of exterior removal, scraping and priming work; interior removal of architectural components to be performed by the deleading contractor; the costs associated with training and licensing requirements for the General Contractor and to more clearly define the separation of work requirements for the project. This summary will be issued by Addendum on Thursday, December 15, 2011. The benefit of this requirement is to allow the Contractor access to the buildings to perform the work consistent with the regulatory requirements for the performance of this category of work prior to certification of the units. Proj. No. 11011 Residence Conversions 12/09/2011 Smith College, Northampton, MA ADDENDUM NO. 2 2 The sequence would be as follows: 1) The deleading contractor performs the exterior and interior work identified as part of the removal. 2) Visual inspection by Owner’s consultant. 3) GC performs all interior work except for finishes, Deleading Contractors scrapes and primes exterior work, GC completes exterior work. 4) Visual Inspection by Owner’s consultant. 5) Finishes completed. 6) Final cleaning by Deleading Contractor. 7) Certification of the units. In general, the scope as currently delineated is consistent with the anticipated separation of the work. Exterior siding removal, sash removal for window replacement and exterior modifications will be part of the General Contractor’s responsibilities. Exterior scraping and priming of painted surfaces, removal of handrails (where indicated) and creating intact surfaces for final painting will be part of the Deleading Contractor’s scope. Interior component removal will be by the Deleading Contractor. Interior replacement of components and new work will be by the General Contractor’s responsibility. Training and Certification The training and certification requirements will take place after the award of the contract and this requirement is not a pre-qualification for the Bidder. Contract Award The Owner will make an award of the contract after it receives proposals from Deleading Contractors for the removal work in the first week of January. End of Addendum No. 2