Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Wade basement Existing
EXISTING BASEMENT FLOOR PLAN 1/4" = 1'-0"1UPPLUMBING ROUGH-INTOILET PLUMBING ROUGH-IN2" CENTRAL VACWATER METERDHWHVACI-JOISTSABOVE I-JOISTSABOVE I-JOISTSABOVE I-JOISTSABOVE I-JOISTSABOVE 81" TO BOTTOMOF BEAM 81" TO BOTTOMOF BEAM 81-1/2" TO BOTTOMOF BEAM ELECTRIC BREAKER ANDTELEPHONE PANELSDUCT ABOVEDUCT ABOVEDUCT ABOVEDUCT ABOVEDUCT ABOVE81-1/2" TO BOTTOMOF BEAM DECK ABOVE DRAIN LINERADON SLAB VENTWATER LINES ABOVEVACUUM LINE ABOVEVACUUM LINE ABOVEDRAIN/VENT STACKPOWER VENTEDWATER LINES ABOVEGARAGE: UNEXCAVATED ENTRY: UNEXCAVATED BASEMENT +/-91" TO BOTTOMOF FLOOR JOISTS WOOD STUDWALL CONCRETE FOUND-ATION WALL 5-11-15FOR REVIEWmlCONSTRUCTASSOCIATES, INC.36 SERVICE CENTERNORTHAMPTON, MA 01060tel: 584-1224 fax: 584-7504EXISTING BASEMENT PLANEX-11/4" = 1'-0"BABA123CCDrawn ByDate Issue 123RENOVATIONS FOR:GEORGE ANDRUTH WADERESIDENCE #38 BEAR HILL20 BRIDGE ROADNORTHAMPTON, MA 01060