Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
B15-0264-Bolard-Bear Hill-Unit 19 Material List
Bear Hill Estates - Unit 19 Layout Material List Report 19 Mark Warner Drive Northampton, MADrawn By: Job Number B15-0264 Job Location Job Name Job: b15-0264-bolard-bear hill-unit 19 Green Points DS Level: 1st Floor Product Top NailsFace Nails Member NailsQty Framing Connector Summary PlotID Manuf Skew Slope Bk Blks Web StiffFiller H1 Simpson --No-30- 10d common 10- 10d commonHUS1.81/10 No2No H2 Simpson --No-10- 10d x 1-1/2 -IUS2.37/11.88 No6No Plot ID Length Product Plies Net Qty Floor 10111 7/8" TJI® 230 with Flak Jacket™ protection40'0"0FJI40' 3111 7/8" TJI® 230 with Flak Jacket™ protection38'0"0FJI38' 5111 7/8" TJI® 230 with Flak Jacket™ protection30'0"0FJI30' 1111 7/8" TJI® 230 with Flak Jacket™ protection27'0"13FJIBk1 18111 7/8" TJI® 230 with Flak Jacket™ protection18'0"0FJI18' 7111 7/8" TJI® 230 with Flak Jacket™ protection4'0"0FJI4' 1111 1/4" x 11 7/8" 1.3E TimberStrand® LSL16'0"0TSCa1 49123/32"x48"x96" Weyerhaeuser Edge Gold Panel (0/24) T&G SF 0 Plot ID Length Product Plies Net Qty Beam/Post 111 3/4" x 11 7/8" 2.0E Microllam® LVL38'0"0M1 331 3/4" x 11 7/8" 2.0E Microllam® LVL30'0"0M2-3 111 3/4" x 11 7/8" 2.0E Microllam® LVL20'0"0M3 441 3/4" x 11 7/8" 2.0E Microllam® LVL16'0"0M4-4 211 3/4" x 11 7/8" 2.0E Microllam® LVL4'0"0M5 Page 1 of 24/24/2015 8:09:15 AM (†) User modified item. (‡) User added item. Level: 2nd Floor Product Top NailsFace Nails Member NailsQty Framing Connector Summary PlotID Manuf Skew Slope Bk Blks Web StiffFiller H1 Simpson --No-56- 16d common 20- 16d double shearHGUS412 No1No Plot ID Length Product Plies Net Qty Beam/Post 331 3/4" x 11 7/8" 2.0E Microllam® LVL44'0"0M1-3 221 3/4" x 11 7/8" 2.0E Microllam® LVL14'0"0M2-2 221 3/4" x 11 7/8" 2.0E Microllam® LVL6'0"0M3-2 Job: b15-0264-bolard-bear hill-unit 19 Layout Material List Report Page 2 of 24/24/2015 8:09:15 AM (†) User modified item. (‡) User added item.