#40 roof system RT PP - FS 7-3-12T02GRT03GRT01GET01AT02GET03GET03A01GEA01AV07V08V09V10V01V02V03V04V05V06T01(5)T02(5)A01(10)1' 8 1/16"9 1/4"11 7/8"9"1' 0" 1' 0"3' 7 1/2" 4' 4 1/2"1' 0"3' 0" 1' 0"1' 0"3' 7 1/2" 10' 10"16' 1" 9' 5 1/2" 12' 0" 1' 0"1' 0" 20' 0"1' 0" 12' 0"1' 0" 12' 0"1' 0" 1' 0"21' 0" 18' 0" 6' 0" 3' 0" 1' 0"1' 0" 3' 0" 7' 6" 3' 0" 9' 6"1' 0" 22' 0"1' 0" 6' 0" 17' 0" 9' 0" 1' 0"11' 0" 1' 0"1' 11 1/4"2' 0"2' 0"2' 0"2' 0"2' 0"2' 0"2' 0"2' 0"2' 0"1' 7 3/4"1' 11 1/4"2' 0" 2' 0" 2' 0" 2' 0" 1' 11 1/4"2' 0 3/4"2' 0" 1' 11 1/4"2' 0" 2' 0" 2' 0" 2' 0" 1' 8 1/4"2' 3 3/4"2' 0" 2' 0" 2' 0" 1' 11 1/4"1' 8 1/4"2' 3 3/4"2' 0" 2' 0" 2' 0" THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to beincorporated into the building design at the specificationof the building designer. See individual design sheets for eachtruss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracingof the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams,walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing ofwood trusses" available from the Truss Plate Institute, 583D'Onifrio Drive; Madison, WI 53179. It is the responsiblility of theGeneral Contractor/Superintendent to verify that the provided truss layout shall match the final intended construction plans,loading conditions, and use. If they do not, it is the responsiblility of the General Contractor/Superintendent to provideprints/plans containing the latest specifications and designs. Universal Forest Products will not be responsible forprint/planchanges by others after final approval ofshop drawings, norwill they be responsible for errors or modifications made on-siteduring construction. DO NOT CUT, NOTCH, DRILL, OR OTHERWISE"REPAIR" MANUFACTURED TRUSSES IN ANY WAYWITHOUT PRIOR WRITTEN AUTHORIZATION BY A LICENSED PROFESSIONAL DESIGNATED BY UFP. UFP WILL NOTBE HELD RESPONSIBLE FOR ANY MODIFICATIONS OR "CHARGE BACKS"DONE WITHOUT PRIOR WRITTENAUTHORIZATION FROM UFPBear Hill EstatesLot 39C-R Roof Truss Plan07//03/2012For Approval12062741All Truss-to-truss connections tobe made with HUS26 hangers (19)Heel Height Detail