Loading...
Structural CalcsCOMPANY Whetstone Engineering Feb. 21, 2013 16:07 PROJECT 100 Emersron Way Steve Ferrari Beam2-2.wwb Design Check Calculation Sheet Sizer 2004a LOADS ( lbs, psf, or plf ): Load Type Distribution Magnitude Location [ft] Pat- Start End Start End tern d1 Dead Full Area 15.00 (6.67)* No d2 Dead Full Area 15.00 (6.67)* No d3 Dead Full Area 12.00(15.50)* No d4 Dead Full Area 12.00 (1.50)* No l1 Live Full Area 40.00 (6.67)* No l2 Live Full Area 40.00 (6.67)* No s1 Snow Full Area 28.00(15.50)* No s2 Snow Full Area 28.00 (1.50)* No *Tributary Width (ft) MAXIMUM REACTIONS (lbs) and BEARING LENGTHS (in) : 15'0' Dead 3030 3030 Live 5677 5677 Total 8707 8707 Bearing: LC number 3 3 Length 3.32 3.32 LVL n-ply, 2.0E, 2800Fb, 1-3/4x16", 2-Plys Lateral support: top= full, bottom= at supports; Load combinations: ICC-IBC; Analysis vs. Allowable Stress (psi) and Deflection (in)using NDS 2001 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 192 Fv' = 328 fv/Fv' = 0.59 Bending(+) fb = 2624 Fb' = 3220 fb/Fb' = 0.81 Live Defl'n 0.36 = L/498 0.38 = L/480 0.96 Total Defl'n 0.65 = L/277 0.75 = L/240 0.87 ADDITIONAL DATA: FACTORS: F CD CM Ct CL CV Cfu Cr Cfrt Ci Cn LC# Fb'+ 2800 1.15 - 1.00 1.000 1.00 - 1.00 1.00 - - 3 Fv' 285 1.15 - 1.00 - - - - 1.00 - 1.00 3 Fcp' 750 - - 1.00 - - - - 1.00 - - - E' 2.0 million - 1.00 - - - - 1.00 - - 3 Bending(+): LC# 3 = D+.75(L+S), M = 32653 lbs-ft Shear : LC# 3 = D+.75(L+S), V = 8707, V design = 7159 lbs Deflection: LC# 3 = D+.75(L+S) EI= 1195e06 lb-in2/ply Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. (D=dead L=live S=snow W=wind I=impact C=construction CLd=concentrated) (All LC's are listed in the Analysis output) DESIGN NOTES: 1. Please verify that the default deflection limits are appropriate for your application. 2. SCL-BEAMS (Structural Composite Lumber): the attached SCL selection is for preliminary design only. For final member design contact your local SCL manufacturer. 3. Size factors vary from one manufacturer to another for SCL materials. They can be changed in the database editor. 4. BUILT-UP SCL-BEAMS: contact manufacturer for connection details when loads are not applied equally to all plys.