Loading...
Engineer Letter 2-21-13February 21, 2013 Steve Ferrari FCM Smart Build 103 Ryan Road Florence MA 01062 RE:100 Emerson Way, Northampton, Structural Framing,Project # 12086 Dear Mr.Ferrari: Enclosed are the structural calculations for structural composite wood members to be used in the single family residence at 100 Emerson Way as depicted in framing plans F-1. F-2 F-3 & F-4 dated 2/04/13 as drawn by Steve Ferrari.They are labeled as Beam 1-1A, Beam 1-1B, Beam1-2, Beam 2-1, Beam 2-2, Flush Beam 2-3,Rim Joist & Hip. Note that the calculation for the Rim Joist is the worst condition, namely over the large window in the first floor front wall, as this member will be used for all rim conditions.Also enclosed is the design for the hip peak connection. Please call me if you have any questions regarding this project. Sincerely, Robert Leet, P.E.