CSB112ft3inBeamCalcCS Structureâ„¢ 2016.11 [Build 16]
kmBeamEngine 2016.9.0.3
Materials Database 1557
FerrariBishopGorman - Level 8 4- 5-17
8:44am
1 of 1
All product names are trademarks of their respective owners
Copyright (C) 2016 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The
design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications.
Doug Hodgins
rk Miles Inc.
21 West St.
West Hatfield Ma.
Member Data
Description: CalcB1 Member Type: Beam Application: Floor
Comments:Top Lateral Bracing: Continuous
Bottom Lateral Bracing: Continuous
Standard Load: Moisture Condition: Dry Building Code: IBC/IRC
Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total
Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 16.2 PLF
Filename: C:\KMW\JOBS\
Other Loads
Type
(Description) Side Begin End
Trib.
Width
Other
Start End
Dead
Start End Category
Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 489 0 Snow
Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 512 364 Live
1 2
12 3 0
12 3 0
Bearings and Reactions
Input Min Gravity Gravity
Location Type Material Length Required Reaction Uplift
1 0' 0.000" Wall SPF Plate (425psi) N/A 4.614" 6863# --
2 12' 3.000" Wall SPF Plate (425psi) N/A 4.614" 6863# --
Maximum Load Case Reactions
Used for applying point loads (or line loads) to carrying members
Live Snow Dead
1 3107# 2967# 2308#
2 3107# 2967# 2308#
Design spans
12' 1.750"
Product: 1-3/4x16 VERSA-LAM 2.0 3100 SP 2 ply PASSES DESIGN CHECKS
Minimum 4.61" bearing required at bearing # 1
Minimum 4.61" bearing required at bearing # 2
Design assumes continuous lateral bracing along the top chord.
Design assumes continuous lateral bracing along the bottom chord.
Allowable Stress Design
Actual Allowable Capacity Location Loading
Positive Moment 20839.'# 42969.'# 48% 6.13' Total Load D+0.75(L+S)
Shear 5356.# 12236.# 43% 10.98' Total Load D+0.75(L+S)
TL Deflection 0.2316" 0.6073" L/629 6.13' Total Load D+0.75(L+S)
LL Deflection 0.1537" 0.4049" L/948 6.13' Total Load 0.75(L+S)
Control: Positive Moment
DOLs: Live=100% Snow=115% Roof=125% Wind=160%
Manufacturer's installation guide MUST be consulted for multi-ply connection details and alternatives