Loading...
CS B1 12 ft 3 in Beam CalcCS Structureâ„¢ 2016.11 [Build 16] kmBeamEngine 2016.9.0.3 Materials Database 1557 FerrariBishopGorman - Level 8 4- 5-17 8:44am 1 of 1 All product names are trademarks of their respective owners Copyright (C) 2016 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Member Data Description: CalcB1 Member Type: Beam Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 16.2 PLF Filename: C:\KMW\JOBS\ Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 489 0 Snow Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 512 364 Live 1 2 12 3 0 12 3 0 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall SPF Plate (425psi) N/A 4.614" 6863# -- 2 12' 3.000" Wall SPF Plate (425psi) N/A 4.614" 6863# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 3107# 2967# 2308# 2 3107# 2967# 2308# Design spans 12' 1.750" Product: 1-3/4x16 VERSA-LAM 2.0 3100 SP 2 ply PASSES DESIGN CHECKS Minimum 4.61" bearing required at bearing # 1 Minimum 4.61" bearing required at bearing # 2 Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 20839.'# 42969.'# 48% 6.13' Total Load D+0.75(L+S) Shear 5356.# 12236.# 43% 10.98' Total Load D+0.75(L+S) TL Deflection 0.2316" 0.6073" L/629 6.13' Total Load D+0.75(L+S) LL Deflection 0.1537" 0.4049" L/948 6.13' Total Load 0.75(L+S) Control: Positive Moment DOLs: Live=100% Snow=115% Roof=125% Wind=160% Manufacturer's installation guide MUST be consulted for multi-ply connection details and alternatives