Loading...
10. Sewer & Water AvailabilitiesMUNICIPAL SEWER AVAILABILITY APPLICATTON Northampton Streets Department l_25 Locust Street Northampton, MA 01060 41"3-587-tstO A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this applicaiion. Location: Date of lnquiry: lnquirer with contact info: Reason for Request: Size of Sewer Main: Depth of Sewer Main: Length of Sewer Main: 221 Emerson Way, Lot 32 as/2e11.6 Steve Ferrari 413-588-8975 New Construction Municipai Sewer Main in Front of Location: yes No Age:Material: Size of Service Connection: Type of Service Connection: Tie-in to Sanitary Main: Comments: Tie-in to Sanitary Stub: Private Sewer aval lability City Requires 5" cleanout installed at City Property Line Note: lf this availability is for new construction, this form must be hand delivered to Building lnspector. A corresponding "sewer enterance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such intstallation shall be made with the Northampton Streets Department with a minimum of 5 working days notificaiton. All work shall conform to Northampton Streets Department specifications. t,q**l',.-" ,{t.A* Sewer Dept. Foreman aiDate: ii'r/," - MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St. Northampton, MA 01060 587 -1091 A Department of Public Works Trench Permit shall be required prior to any construction or connection activity associated with this application. Location:221 Emerson Way, Lot32 Inquiry Made By:SteveFerrari 413-588-8975 Date of Inquiry: 9t29fi6 Fire Line Irrigation Domestic X Number of Units:I Type of Unit(s): Single Family X Apart. Comm. Multi-family Type of Ownership: Private X Condo Rental (Annlicnnf fo fill nrrf fhe ehnve) No' / Size of Water Main: fi Material: Approximate Static Street Pressure: Municipal Water Main in F'ront of l.ocation? Size of Service Connection Suggested Meter Size: t"C,: \is 'meter Yes: Existing service to site? DT Flow Test Conducted: Yes: If done attach results -/Yes: No // 1 z, I(-Age: .A -,,' -- 5hfi timesatetevationsabove320teet. V\lqiCt lrlrt),t t 5 iltti- OuyUl {ry, 'f irc ( r'h r Arrangements of such installation shall be made with the Northampton Water Deparfinent with a minimum of ,5 working days notification. o All work shall conform to Northampton Water Department specifications. .ffifffi-(;Z:--t}-tl - {{ OV,A L" Comments: The Water Department cannot guarantee adequate water pressure during peak demand Water Superintendent Date water Entry $ I$- Meter $ l8O Radio $ I 35 cc: Cit_v ol'Norlharnpton Building Dept. / Commissioner Note: lf this availabilitv is for a new construction, it must tle hand delivered to the Buildins Inspector. ' /ltorl'itt*,,rf i*-t . ief u,,rc i,v,tl nct bt f'r:rn*/ ,srt t,n/;l Pr,qP 5h/,s,-, i5 )t l,ne , o A corresponding water entrance fee shall be paid prior to making any connection to the municipal water J,. ' ,,. l'L t-'/ :-,