Loading...
160217_ Mahoney Architectural12" / 12"new roofing to match existing 4 1/2" / 12"E Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Perspectives & Exterior Elevation Bonus Room Addition Cindy & Patrick Mahoney 12/01/15 12/10/15 12/22/15 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA T.1 1/4" = 1'-0"1 Front Elevation Drawing List New Sheet # Sheet Name T.1 Perspectives & Exterior Elevation A1.1 Second Floor Plan & Schedules A2.1 Exterior Elevations A3.1 Sections A4.1 Framing Plans E.1 Electrical Plans 3 Phase 1 Perspective 12Phase 1 Perspective 2 WD slpedceilingnew skylight w/shade 5' - 0"7' - 0"7' - 0"5' - 0" A A3.1 B A3.1 C A3.1 demo wall slpedceilingslpedceilingslpedceilingline of flat ceiling @ 8'-0" line of flat ceiling @ 8'-0"line of flat ceiling @ 8'-0" 5'-0" kneewall 5'-0" kneewall 5'-0" kneewall patch/match flooring Bonus Room -new carpet flooring skylights 5'-0" kneewall 30" new door E E FF L 1a truss gable wall with siding to remain add 2x6 wall on interior double 2x4 wall construction 1' - 10" 2a (4) @ 20" D (4) @ 20" D 24' - 0"12' - 0"12' - 0"line of wall below ADD OPTION OPTION: create a seperate zone for heat and a/c in the second floor bonus room wire shelves (5) @ 20" deep built-up post 2x6 walls to continue to eave to allow for blowing/netting of cellulose 2x6 walls to continue to eave to allow for blowing/netting of cellulose Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Second Floor Plan & Schedules Bonus Room Addition Cindy & Patrick Mahoney 12/01/15 12/10/15 12/22/15 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA A1.1 1/4" = 1'-0"1 Second Floor Plan Window Schedul e Phase 1 Mark Quantity Rough Widt h Rough Hei ght Manufact urer Model Fi ni sh Munti ns Gl azi ng Head Hei ght Comments E 2 5' - 7 1/2"4' - 5"Paradi gm DH3453-2 whit e 3 over 1 i nsul ated gl ass Low E tri pl e gl azed 6' - 10 1/2"Pair of Doubl e Hung Windows F 2 2' - 4 3/4"3' - 2 3/4"Velux Skylight ︵verify si ze︶L 1 Skyli ght wit h shade ︵verify size︶Door Schedul e Phase 1 Door Nu mber Widt h Hei ght Manuf act urer Door Mat eri al Fra me Type Hardware Model Co mment s 1a 2' - 6"6' - 8"Jel d Wen soli d core wood pri vacy craftsman 3 ︵match existing︶hinged door 2a 3' - 0"6' - 8"Jel d Wen soli d core wood passage craftsman 3 ︵match existing︶pair of hinged doors 12" / 12"FF 12" / 12"12" 12" 4 1/2" 12" E L NOTE: existing trim/siding to remain on gable end. patch and match to install double "E" window painted Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comAs indicated Exterior Elevations Bonus Room Addition Cindy & Patrick Mahoney 12/01/15 12/10/15 12/22/15 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA A2.1 3/16" = 1'-0"2 Rear Elevation 1/4" = 1'-0"1 Phase 1 Elevation Side 1st floor 0' - 0" t.o. garage slab -1' - 10" t.o. plate 1st 8' - 5 1/4" 2nd floor 9' - 6" 5' kneewall 14' - 6" t.o. plate 2nd 17' - 6"8' - 0"2' - 0"2' - 0"16"16"16"4 1/4"5/8" rated drywall ceiling and walls 5/8" rated drywall ceiling and walls Roof Insulation Total R46 -4" spray foam -5 1/4" dense pack cellulose Floor Insulation Total (R56) -16" dense pack cellulose Bonus Room -new carpet flooring ceiling joists 2x8's @ 16" o.c. new ridge (see structural drawings) block rafter ends 1st floor 0' - 0" t.o. garage slab -1' - 10" t.o. plate 1st 8' - 5 1/4" 2nd floor 9' - 6" 5' kneewall 14' - 6" t.o. plate 2nd 17' - 6"1' - 10"9' - 11 1/4"5 1/2"23' - 1"5 1/2" 5/8" rated drywall ceiling and walls 5/8" rated drywall ceiling and walls 13' - 7" Roof Insulation Total R46 -4" spray foam -5 1/4" dense pack cellulose -spray foam insulation at band joist -spray foam insulation at band joist Bonus Room -new carpet flooring Floor Insulation Total (R56) -16" dense pack cellulose ceiling joists 2x8's @ 16" o.c. new ridge (see structural drawings) 2nd floor 9' - 6" t.o. plate 2nd 17' - 6"6' - 10 1/2"add new skylight (2) 2x12's top and bottom at skylight trim out and paint access panel patch floor and casing at demo of wall demo wall patch wall and ceiling drywall at demo of wall Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Sections Bonus Room Addition Cindy & Patrick Mahoney 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA A3.1 1/4" = 1'-0"A Cross Section Garage A 1/4" = 1'-0"B Cross Section Garage B 1/4" = 1'-0"C Cross Section at Optional Bedroom Skylight *REFER TO STRUCTURAL DRAWINGS WD 2x10 roof rafters @ 24" o.c.2x10 roof rafters @ 24" o.c.demo front half of roof trusses double 2x10 roof rafters @ dormer double 2x12's top and bottom of new skylight demo rafter at new skylight sister 2x10 next to top cord of existing truss (demo all but top cord of truss after 2x10's are installed) sister 2x10 next to top cord of existing truss (demo all but top cord of truss after 2x10's are installed) gable end truss and 2x6 ladder framing at soffit to remain. demo top truss cord at new skylights double 2x10's top and bottom of new skylight soffit and fascia to remain soffit and fascia to remain new ridge (see structural drawings) (2) 9 1/4" LVL header built-up post 2x6 walls to continue to eave to allow for blowing/netting of cellulose 2x6 walls to continue to eave to allow for blowing/netting of cellulose outside cheek wall sits on top of double 2x10's 2x6 ladder frame at roof overhang2x10 roof rafters @ 16" o.c.(2)2x10 header9 1/2"16"16"16"16"16"16"16"16"16"14" 2x6 ladder frame at roof overhang 2x8 ceiling joists@ 16" o.c.built-up post Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Framing Plans Bonus Room Addition Cindy & Patrick Mahoney 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA A4.1 1/4" = 1'-0"1 Roof Framing Plan 1/4" = 1'-0"2 Dormer Roof Framing Plan *REFER TO STRUCTURAL DRAWINGS sd S ceiling fan/light cable data T T relocate thermostat to hallway relocate electrical at demo of wall T heat garageU U UU garage relocate ceiling mounted lights, garage door openers, heat detector and outlets required to install the new floor structure Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Electrical Plans Bonus Room Addition Cindy & Patrick Mahoney 01/19/16 02/02/16 02/04/16 02/17/16 Review Review Review Review Review Review Review 77 Emerson Way Florence, MA E.1 1/4" = 1'-0"1 Second Floor Plan 1/4" = 1'-0"2 First Floor Electrical Plan