Loading...
23D-064 (10) 40 NUTTING AVE BP-2019-0230 GIS#: COMMONWEALTH OF MASSACHUSETTS Map-.Block:23D-064 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-0230 Proiect# JS-2019-000364 Est.Cost: $40903.00 Fee: $75.00 PERMISSIONIS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sq. ft.): 12980.86 Owner: KAJKA JARED A Zoning: URB(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT. 40 NUTTING AVE Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 GREENFIELDMA01301 ISSUED ON:8/22/2018 0:00:00 TO PERFORM THE FOLLOWING WORK.ROOF MOUNTED SOLAR, 30 PANELS 9.6KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 8/22/2018 0:00:00 $75.00 212 Main Street,Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner War RECEIVED Ci of Northampton St"afpo"mt ` B Idino Department CurigGlltlDtMv{agrPadgp„ ° r AUG 2 0 2016 ortampton, MA 01060 Two 12 Main Street smt�r{ e Rdom 100 WifNejlh alf 6 t�' 11q(EMa4RWSgr., MKOFIllix ct 13-5 7-1240 Fax413-587-1272 p�rca. NdRhWAMON, a , , APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE/OR TWO FAMILY �DWELLING A SECTION 1 -SITE INFORMATION v 12-1 '7j ''I Q 1.1 Properly Address: This section to be completed by of 1w 40 Nutting Avenue, Northampton MA 01062 Map Lot unit Zone Overlay Dlstrkt Elm St Dlsmel CB D181,10 SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Jared Kajka 40 Nutting Avenue,Northampton MA 01062 Name(Print) Current Mailing Address: (413)883-4328 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) Current Melling Address: 413-772-8788 Signature J- Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by emit applicant 1. Building $8,373 (a)Building Permit Fee 2. Electrical 32,530 (b)Estimated Total Cost of Construction from 8 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) S.U U 5. Fire Protection 6. Total=(1 +2+3+4+5) $40,903 1 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Sign Building Com i inner/Inspector of Buildings Dale %QUA Q RSO PVSgaarF tle' pvsquared.coop Phone.-413- 881F=.413-772-8668 311 Wells Sl GreenfieldLMA 01301 �•• , , ` MA Elec.'Lic.A1376419A M04&764 . m�0.giD.icrn 'll•>Mfnlxl Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical,and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education.We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by thejanuary 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements,and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers,such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning ibis column w be filim in by Bmildmg Dcparfment Lot Size i.__ _ _. I '. Frontage Setbacks Front Side L1 R: LI R:1 Rear Building Height Bldg. Square Footage -._, i_ _._. Open Space Footage (Lot area minus bids&Paved l #of Puking Spaces i. . _. A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IFYES: enter Books _ Pagel and/or DocumentNei B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Penn it from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK Icheck allapplicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Rooting ❑ Or Doom Accessory Bldg. ❑ Demolition ❑ New Signs [t71 Decks [O Siding[p] Other[[ZQ Brief Description of Proposed Worklmviurm If IIr mwtm ry„W..oiwl.nWM e1—h—fII,�f Alteration of existing bedroom_Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet ea. If Now house and or addition to exisdna housing,comgleto the following: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? In Type of construction i. Is construction within 100 ft. of wetlands?_Yes No. Is construction within 100 yr. floodplain_Yes No I. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No I. Septic Tank_ City Sewer - Private well_ City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, Jared Kaj ka as Owner of the subject property hereby authorize Philippe Rigollaud to act on my behalf, in all matters relative to work authorized by this building permit application. See attachment (A) 8. 15 .2018 Signature of Owner Date 1 Philippe Rigollaud ,as 6waer/Authonzed Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. PHILIPPE RIGOLLAUD Print Name 8 .15.2018 Signature of t Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable 0 Name of Limon Hoiden:Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address � Expiration Date 413-772-8788 Signature Telephone 9.Rwistmed Homs Improyemard Contractor: Not Applicable 0 Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B. Greenfield, MA, 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C.162,§261 Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes....... 0+ No--- 0 11. - Home Owner Exem0ion The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,Provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached stmctures accessory to such use and/or farm structures.A merson who constructs more than one home in a two-year Period shall not be considered a homeowner. Such"homeowner'shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for W such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be table for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVohala Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photoftoaics Cooperatfw,or Its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltala Cooperative for marketing purposes.A check for the First Payment Is enclosed and I am returning this Agreement within 21 days of the Proposal date. RECD JUN 2 5 2018 ,'Aret-J kat iso 6-its-7s Printed Name Date rf�Nt�' Signature Title P wmBamaw PW12WA1 The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Wil.kery'Compsensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Aooliunt Information Please Print Legibly Name (Business/Organisation/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Ch«k the appropriate box: Type of project(required): I.[J I an a employer with 48 maid «a(fwland/or pen-time).' 7. ❑New construction 2.�Iamasole propdebr or pennership and M1ave no employ«s working formcin 8. Remodeling any capacity.[No workers'com,immusnce reported] 7 11 an a homeowner doingall work No workerscom red. q� ❑DemOlillon 3 e y [ p.insummcrcqui ]' 4.E]I am ahomeownerendwill be hiring con ytractorsm conductall work onm y. twill 10 Building addition ensure that d]contractors enter have worker%compns eation insurance or aree sole sole ILElectrical repairs or additions pmprlctors with m employees. 12. Plumbing repairs or additions 5.r7 I am a general contractor and l have hired the sub-commetors listed on the attached sh«t 13.E]Roof repairs Thesesub-contractors have employees end have workers'com,wsura a 6.[]We arc a corporation and its operas s,[ exercised their right of exemption per MGL c. 14.❑v Other Solar PV 152,§I(4),and we have no employees, workers'comR insurance required] 'Any applicant that checks box#1 must also fill act the section below showing their workers'compensation policy information. t Homeowners who subma this affidavit indicating they are doing all work and men hire outside conhacmrs most submit a new affidavit indicating such. tContracturs that check this box at attached an unnamed l ahem showing the name of subcontractors and state whether or not those amities have employees. If the subcontractors have employees,they must provide their workers'comp.policy number. Imo an employer that is providing workers'compensadon insurance for my employees Below is Poe policy and job site Information. Insurance Company Name:HDI Global Insurance Co/Energi Policy#or Self-ins.Lic.#:EWGCR0002412118 Expiration Date:01/01/2019 Job Site Address: 40 Nutting City/State/Zip:Florence MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well ac civil penalties in the form of a STOP WORK ORDER and a fine of up w$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains andpenaides ofperjuty that the information provided above is true and correct Suriname, Date: 8/15/2018 Phone#: 413-772-8788 Official use only. Do not write in this area,to be completed by city or town of wiat City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards C o n s t ructiton '$o pe ry i s o r CS-111266 Eapires: D3,11412021 DANIEL GOMEZ40NZAUIZ 43 HATFIELD STREET NORTHAMPTON MA 111111111,1110 Commissioner Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration lype Cnrrlor RlrVY . RIUNEERVALLSIMGTOVGLTAIG$CUUP Reg511ation140077 Enprrallon 09x1512019 01 t WELLS ST SUITE R GREENFIFf O.MA 01301 Update Address and Return Card Dirt MCon er s a CO Ne70R NOME IMPROVEMENT TYP ...... PACTOR a Registration he ewpi0d for individual Illoud use only etuf TYPE'.(rvtxunl rvr before 1Cone.nuirn date and Ine nY P0077 l"153Lon 10 Po of Consumer A 170 antl Buslnpt P¢gulaLon 14QT1) rq 15 PnrF 10 Parts Plaza 2 Suite 5110 -� I-1111.L4B vr,it"Pi,...0"" OVi' 0oslon.MA 02115 iGUt.AUO r r � r n 1 u Jerseoreteq Nol vaIIC wlt o signature .ACtoRa CERTIFICATE OF LIABILITY INSURANCE 01103:2018 THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOTAFFIRMATVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOTCONSTITIITEACONTRACT BETWEEN THE ISSUING INSURERISI,AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT. If the MMCaM holder Is an ADDITIONAL INSURED,Me policyl(esl must have ADDITIONAL INSURED provisions or Be enclorsed. N SUBROGATION IS WAIVED,S01ect to the terms end conditions of the policy,alleln policies may require an endoraament. A statement on Mie certificate does not confer fyhte to Me artihcate holder in lieu of such endonsemantlp. PRODUCER Linda Pal NONE: Web0er8Grinnell z ONE (413)586-0111 413586A48t p xo 1 1 BNOM On,SV¢¢I p0RE55: IpOwers/gu<bberantlgrinnell[an INSURENSIAFFOWp COVERAGE NAKN NOMarnpton MA 0106D INSURERA: HDI Global Ins.CatEnergi INSURED INSURER B: MarkevEnergi Pioneer vXI"PhotOV011aics Ccowawa,Inc. INSURER C: leer'Ins.Co Of H3000verlEOergi ARn Earn PlnNlalrl INSURER D'. 311 Wells Street.Suite B UUURFR E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp 1.2019 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDNGANY REQUIREMENT,TERM OR CONDITION OFANYCOMRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. E%CLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID C W MS. LTR TYPE OF INSURANCE INI. .1 POLICY NUMBERn-11Ell I—IT. IYYI UNITS F.ERCIALGEN�IMMM EACH OCCURRENCE $ 1'000000 WMS MME ®OCCUR FAEa.ES X.1inU ,I b 100.000 MEOIXPrMrPMpronl S ENCIOLed A EGGCRODM412118 01/0112018 01101/2019 FE1$CNALLADVPIJUN1 $ 1000.000 OENLAGGREwTE LIMITAPPDES PER DENER.uAoaRECATE S 2000,000 _U_❑PECDT ❑Loc NODUCTs-COMProPAGG s 2,D03o0U OTHER f AUTOMOBILE LIABLm - Ea aaHeN IN L uMl s 1.000000 BODILY INJURY Pelpere0l S APANIAUTO ODYNED F-1 AVTOBONLY SAICIIOSl6BD EAGCRC00241218 01/010018 011012019 BODILY INJURY(Fn aOdUS) S XIREO Nd EARED FE RIYOMIAOE S RUTOSONLY gUTO50NLY Fina aielM1 19 UACNUDSUUNJ mOJOUEI Bl f 20000 UMBRELLALNB OCCUR FACNCCCURRENCE S 3000,000 B EXCESS IAS C✓NM$.MME 18EFXNE60457 01/0112018 01ID112019 ApOREOATE s 3000,000 DEO I I RETENTION S f WO RSCWMNS N >4 FEE EERN ANOEMPLOYERFURSAUIY IN A OFFICERMEMSER EXCEDED>ECUTnE ❑ NIA EWGCR0002412118 0110112018 01101/2019 EL EACH ACCIDENT E 1000,000 (Wneumuf NNl EL DISEASE-EA EMPLOYEE f 1'UW 00 fres it.,.under 1.000.000 DESCRIPTION OF OPERATIONS ti EL DISEASE-FCJCYUMIT f C.Durs ial PropenY Business Pers Property $1]50000 C CPR18E17801 01I01R018 01101/2019 Installation $350000 DESCRIPTION OP OPEMTNSN S I LOCATIONS I VEHICLES ACOND 101,AEEltimtl Renurs S[Neeur mer IN ele[ME X mm arl N Useurt) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evlb¢nce of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHONUED REPRESENTATIRE Iui , V ®1988-3016 ACORD CORPORATION. All rights reserved. ACORD 26130161031 The ACORD name and hall em registered marks of ACORD Kajka-Florence j Bea P� a V�c5 � PROJECT INFORMATION: QUA S A • Owner: Jared Kajka l ^�O • Address: 40 Nutting Avenue / F Florence,MA 01062 ��I// �•f • Phone: (413)883-4328 w square,Sokr • 311.1h Sbee(Su.'e. Email: kajkal9@eomeast.net Dreenr ,MA0138I • System Size: 10.8 kW dpi, einzai e • Modules: SunPower X22-360-D-AC Joe Kajka • Rail: SunPower Invisimount -- • Bases: Ecofasten Quikfoot snE: a,Nubl�Avenue • Snow Load: 40 lbs %reM..MA 01861 • Wind Speed: 117 mph O REWS10M ROOF STRUCTURE: 23°Trusses @ 24"O.C. ROOF MATERIAL: Asphalt Shingles PROJECT NOTES: 1. Framing location to be verified on site. 2. Slide rail assembly as needed to avoid inwith splices or bases. r151[e Plate 3. Unlessnless otherwise erwise noted bases are staggered Ne srak and spaced at 48"O.C. 4. Additional or alternative bases may be used to meet actual roof conditions. *1nt: Site Plan BILL OF MATERIALS CR PART MAKE MODEL roxr: 12100 90 Base Ecofasten Quikfoot ev: JD DAR: MM018 30 Rail SunPower Invisimount SCALE: ash- 20 Rail Splice SunPower Invisimount sae: 8.5.a 11 50 Midclamp SunPower Invisimount 20 Endclamp SunPower Invisinnount A-01 30 Module lSunPower X22-360-D-AC ISMe[1 or wsww.dsd,r 311w.ln sne ADi e Mnmm ar..nnaa + " d.: Roof 504IPew.w+r.e.a.a 41 aM4� -t Array 496}i^ PB: Kajka Sm: WMnlIn6 Arenue Fore�e.IM 01063 REVISIONS: N �O Q J Array Flush wkh Vent 180" -� mug Array Layout ridge and centered. Use deckingor L-Feet above rail at blocking attachments bottom of array only. ww: 131M at edges as needed. Below rail otherwise. V jO OM 7mame SfAIE: 3/16•"Vb Clamp Torque: 851n-lbs size Bs•.n• L-Foot Torque: 375 in-lbs Max Span: 48" /t _O^ Max Cantilever: 1/3 adjacent span H L e.g 32"span=10-2/3"cantilever Module Size: 61-5/16"x41-3/16"x 1-13/16"(46mm) i ee202) New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionErgin"dng.com August 3,2018 Ms. Madeleine Geschwind Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street, Suite B Greenfield, MA 01301 Re: Kajka Residence, Florence, MA PV Squared Project No. 12100 NECE Project No. 18-001 T-145 Dear Ms.Geschwind, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared) provided on the roof and supporting structure of the Kajka residence, at 40 Nutting Avenue in Florence(village of Northampton), MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV)array.The information that you provided is attached for reference. You are proposing to erect PV panels on the south facing surface of the house roof.The house is a two-story wood framed residence with a gable roof.The roof has a 23-degree pitch.The roof is supported by manufactured wood fink trusses at 24"O.C.You have provided a second-floor design plan and section and roof truss design output.These trusses span approximately 25'on the horizontal.The roof trusses were designed for a ground snow load(Pg)of 50psf. The truss top and bottom chords and webs are 2x4.The top chords are MSR Fb=2100psi grade SPF lumber. The bottom chords are N2 SPF.The web members are Stud grade SPF.The roof plans call for nominal 5/8" plywood roof deck.The roof has asphalt shingles. NECE's analysis and review includes controlling gravity load combinations(snow and dead loads). In providing this review we assume that the roof and supporting structure was constructed as designed.We further assume that the trusses were properly installed with diagonal bracing for out-of-plane forces. Conclusion: Based on the information that you provided, in my opinion,that the house roof will adequately support the design snow load and the additional dead load of the PV array. 1 base this opinion on the assumptions already discussed and the following additional assumptions. I assume that New England Construction Engineering, PLC PV Squared—Kajka Residence Jonathan Rugg, P.E. Florence, MA Page 2 of 2 owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles. I also assume that PV panels will be installed parallel to the roof,eliminating any additional wind load.The ground snow load (Pg)for Northampton is 40psf. According to information that you have provided,the proposed PV panels weigh approximately 2.6 psf. In summary, in my opinion,and predicated on the assumptions above,the house roof rakers will support the proposed PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. ,%orWs�c Sincerely, Jaunux a ata ft. sou a i onat�anRugg, 4&� t New England Construction Engineering, PLC. 8/ 201 Attachments: -Building Information SunPower ' D Residential o Design-Driven Advantages 41 module aesthetics and efficiency' R Unmatched module reliabilityr SERIES No electrolytic capacitors 25yearCombined Power and Product Warranty California Rule 21 Phase 1 compliant Maximize Value for Roof Size system for roof,not string inverter Optimize performance of each module Expand Deployment Options Complex roofs and partial shading Small systems Optimize System and Installation Efficiency System expandability SunPDWer'AC modules,which include a factory Untwisted SunPOWer Simplify&Speed Installation microinverter,provide a revolutionary combination of high efficiency,high Factory integrated microinverter reliability,and module-level DC-ro-AC power conversion. Designed Rabus[,double-locking AC connectors Design flexibility onsite and onsite specifically for use with SunPower lnvioilvounf°and the SunPower No DC string sizing process Monitoring System,SunPower AC modules enable rapid installation, bect- Fewer installation steps than competing inclasssystem aestheticsand intuitive visibility into system performance. systems Intuitive commissioning All hus comes with the best Combined Power and Product Warranty In Component of Complete System the industry. Built for use with Sunpower®InvislMoumr and the SunPower Monitoring System(PVS5x) Grid Support Utility-Interactive Smart Inverter Superior system reliabllltyand aesthetics Sun Power'soew Type D AC module Is UL tested and terrified to UL 174 i SA and provides advanced smart inverter fancions.Sunpower Type D AC modules are fully compliant with the California Rule 21 Phase 1 r requirements,and the Rule 21 grid profile is easilysm during c.mnnss:.nirg Wrh SunPower PVS5xmonhounghardware. U sunpower.com 01 X22-360-D-AC Residential AC Module Series IEEE 1541a-2014' CA Rule 21 SRDProfde loe(ault sero Cgs) ,in nom./max_ min./nom./max. Frequency(Hz) 595/600r 60.5 58.5/60.0/so5 Povrer Factor 099/1.00/100 0.85lead./1001085 lag. Rcartive Power -169Vor Vol:-VAr Voltage @240 293 /2240 r264V - @208o8V 183/208/228.8V MaaCWrent @240V 133A @208V 54A DOAC CEC Conversion Efficiency @240V 96Our 208V 95.5% Max.Units Per 20 A Branch r rcult @240V 12(single phase) ,-208V 10(t,.pole) ,ye Power 320 W,320 VA No active phase balancing for 3 phase Installations SPR-X22-360-1)l yeanantie5 'year limited power warranty Nominal Poster 360W 2S earlimited product warranty Power Tolerance r5/-0 Ul listed to U 1 174 1 SA Avg.Panel E'flciency 222% SRDs ISLE 154/-2003,IEEE 1541a 2014 CA Temp.Coef mcAver) -029vh/"C Rule 21 Phase 1 Three bypass diodes PV Rapid Shutdown Equipment Shade Tolerance Integrated module-level maximum power point Equipment Grounding tracking UL 6103.UL 9703 Connectors and cables (load break disconnection) UL 1741 AC Module(Type 2 fire rating) Operating Temp_ -40-Fta+185°F(-4TCto+85°Q Certifications Enables Installation In accordance with. Max.Ambient Temp. 122°F(50°Q NEC 690 6 Max.Load WInd.62 psf.3000 Pa,305 kg/mxfront&bac+ NEC 69012 Rapid Shutdown(vlsidc anti Snow'. 125 PSC,6000 Far 611 kg/mc from our6ioe the array) Impact Resistor ce Iinch(25 mm)diameter hail at 52 mph(23 m/s) NEC 69015 AC Connectors,69033eck-IE)(1) FCC and ICES 003 Class B When,;sed with InviSMollnt racking(UL 2703): Solar Cells 96 Monocrys[alline Maxeon Gen 111 I Integrated grounding and bonding FrontGlar, High transmission tempered glass it, nu -Class A file rated _ reflective coating PID Test Potential ndcced de radaaon free Fov rimunumal Rating Outdoor rated frame (las 1 black Finocized(-ighesr AAMA rating) Weg ( 455Ibz ISO,6kg) 1nrn�♦u RecertronendedMax 13 - ad uleSp ring (33mm) IL o 1 . . 1 1 1 1 11 n t's"m rw♦mm y� 1 WSW I 1 hr - S r II, El m i I I I I I aCI.936 .r J .1i If Wm wig .nlI I Ito � lila � FOY� - II ♦ �I r _ . . n n � , u.Jtl, y I i .Liam _In dxai6 IYYbM1Y�i�I illi of - —1 urvl len.d.ee�. �.4n1 Residential Simple and Fast Installation Integrated module to rail grounding 1 Pre-assembled mid and end clamps - Levitatingmid clamp for easy placement " Mid clamp width facilitates consistent,even j^I module spacing Simple,pre drilled rail splice -- _ UL 2703 Listed integrated grounding Flexible Design Addresses nearly all sloped residential roofs Design In landscape and portrait Rails enable easy obstacle management Customer-Preferred Aesthetics #1 module and 41 moundngaesthetics Best-in-class system aesthetics Elegant Simplicity Premium,low-profile design Black anodized components SunPower® InvisiMount- is a SunPower-designed Hidden mid clamps and end damps rail-based mounting system. The lnvislMount system and capped,flush rails addresses residential sloped roofs and combines faster Part of Superior System installation time, design flexibility, and superior aesthetics. Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics The InvislMount product was specifically envisioned and • Combine with SunPower modules and engineered to pair with SunPower modules. The resulting monitoring app system-level approach will amplify the aesthetic and installation benefits for both homeowners and installers. r- 0 0 IJIBII sunpower.com V� Residential • Module'/Mid Clamp and Pall Nodele*26nd aampana yaJ MldClanp EndCldmp Pad$PaJ5PM12 GroU9tl LubA embiy E!'dras ftNft—rft= ler rature 49°Cto90 C140°F(Ot94"F) Component ! Maredal A gFt 1 -- -- - - Maa toad;2PFo) 30001okdo.t ---- — — — 6000 vad e Mld<I p... slack d starless s)eeIn1513o4 e3s(Lz z) __ . _ nd Claims elack amodfized aluminum alloy 5063 T6 110 gp ae co nail Black od d num Iloy 6045 T6 830 g/ /Po v1.1sli Tldm all y6005-TS 830 y/. 19 /fp 25 year product warranty "o dl g 304stainless Wararues ane bry (A2-2obolt plated copper lug 106sy .,' Es oz; sarfinish ovarranty Ut FntlClBlack I'POM; ppNme t04 gt03r oD D031 sed Cecificanons CIassAFre Paretl Compost on SF ntle lraheo+[pchn ent SApPIl, on Compot S yle POOADPCk gAr [Yment ma Cd tl tl urface for Sic,Ch Un I. t f eAprOM1 P ( tt-cfinen6 Pe(errp ' Aa achrtenl Fardw ,e nu(actwersoocurrenta[cr cunt nweiso, AbNment 45095M dee ,.,N a QuikFoot PRODUCTGUIDE r s Exploded Product View/B.O.M. - 1 Y 14, ie. I installation instructions - 2 t {, - C i', Cut Sheets -3 Specifications -4 Al, "'pi 4 6 i r � r rjill ' , , it 4 I it 1r � l r f ;0>EcoFasten Solar& ) QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly - 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 3 QuikFoot Flashing 1 5 4 EPDM Washer 1 5 L-102-3"Bracket*(other options available) 1 4 6 5/16"EPDM Bonded 18.8 SS Washer 1 7 3/8"Stainless Steel Hex Nut i 3 Required Tools Z f 8]Fasten394] EmFa am Solara All content preceded unser 1151522 B2 11539 reserved. 3988214 L1 EcoFasien Sde1 pro0ucfi are pmledeE by 1fe blowing LL5.Parents t5t 522 82 B i5J]00 B2 8.181198 B2 8.166.]13 62 8.146,299 828,209 914 B2 e205050 B2 8 2]2.1]<B2 8225 557 82 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0.33in 8.38mm E E O E E M N � � M 1 .50in 38.1Omm 3/8"-16 Stud E E � M P F V Ih QF-L 1175" 1-- -T Sola 8168 trrr Sd 1 EcoEasten muncr d b wr11eM pmtU S P tents 8151522 Al rights reurved, 398 8214 3.1 EwFaslen Bdar protlucLsare pmRCRtl by Me following U.S.FeteMs'.8,151.R2028,153IOO 828,191398 B2B1669D 829]46$99828,269,914 62 8 295 454 82 8,2]2.1]4 82 8 225 557 62 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in 9.53mm] .032in 0.81 mm'l 1 I r 4 11 i 12.00in [304.80mm 3.00in [76.20mm. 50in 8.00in 12.70mm F' 203.20mm 'i — + 1,. 877-859-3947 EcoFasten Solar°M content protected urAer cop nght.Al rights res wed.10109114 32 2Famn Saar pmduc are pramac UY Oa mloling U.S.Patents 8.151522828,153.700 B28,181.398 B28.166,713 B2B146299828209,914 82 8 245 454 B2992.174 82 8 225 557 62 }p: t QuikFoot– Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8' r7 46 SERRATIONS r9 it 1 J� ��.. 1 7/8., -- RI/16' —i 114" — co — 3/4" 1/16" – �-- R.005 –� R.010 2x R.01 60.00 i 0 3/8" M6-002 7/8" X 82° DETAIL SCALE 3:1 877-859-3947 EcoFasten Solar°All content pretedea under copynght All ngNs reserved.10109114 3,7 EcoFasten Saar pnpucteare praleotaC IN he rdlo ng u .Paters:8.151,522829,158900329,181 398 32 9,166.213328.146299 B28209910 B2 8 245 454 32 8 272,174 82 8 225557 B2 QuikFoot- Product Guide Specifications 11 PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A. WORK INCLUDES A. Submit manufacturers written specifications. S. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 55. attaches directly to the roof deck. C Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. as shown in load test data. ultimate and allowable load values specific to B. RELATED SECTIONS the roof deck specified for the project D. Counter flashing is.032 gauge aluminum em- 1.Section 07600 Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.DMsion 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.DMsion7:Thermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTION A Bracket is mill finish aluminum A. COMPONENTS' 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel within 24 hours of any missing or defective items. PART 3 -EXECUTION stud,(1)stainless steel out,(1)EPDM washer Keep material dry,covered,and off the ground until installed and(i)bonded stainless steel and EPDM . 3.1 EXAMINATION washer. A. Substrate:Inspect structure on which brackets 2. Fasteners PART 2- PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B.Fasteners should be selected for compat- Ecc Fasten Solar® ibility with the roof deck. 289 Hartel Street Morrisville,Vi 05661 B. Notify General Contractor of any deficiencies C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolatcom system.See test data at C Verify that roofing material has been installed www.ecofastensolaccom 2.2 MATERIALS correctly prior to installing solar attachment A. Attachment Bracket brackets. 3. Sealant(if required roof mareq: 6000 Series Aluminum(choose one) t0 be roof manufacturer er approved.sved. 3.2 INSTALLATION 4. Aluminum counter-flashing 1 CP-SQ-Slotted 5. Aluminum attachment bracket 2. F-111-A A Comply with architectural drawings and project 3.P-3-CSK engineer's recommendations for r location of y B. DESIGN REQUIREMENTS' 4.SCL-101-3 system.ComplywithManufacturers written i u t 1. Bracket spacing to be recommended by 5.L-102-3" stallation instructions for installation and layout. project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. I �# 877-859-3947 Ecol'asten SoIWAII content protected under copynght.All rights reserved 10109114 .41 EwFasten Sdarp� areprM byterollawng U.S.Patenu8.151522828,153700628 181398B28166713828.146299B282099NB28245451B28272.174B28225557 B2 A 46 SERRATIONS r1 � v LJ- - 1 7/8" Rl /16" !- 3/4" — 1 /16' — R.005 R.010 — 1 — 2X R.01 4 60.00° 006 0 3/8"+.002 �� 1/8' ✓ 0 7/8" X 82° DEFAILA .X = +� .1 SCALE 3:1 .XX = +/- .01 .XXX= +/- .005 289 Harrel Street pip Morrisville, yr 05661 SCL-101 -3 EcoFasten Solaro Tog Free Phone 1.877. .3947 .QrQ Toll Free Fax 1.888.788766.9994 MATERIAL: 6000 SERIES ALUMINUM O web www.ecofastensolar.wm e-mail info@ecofastensolar.com SCALE: 1:1 1/6/2012 SHEET 1 OF 1 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT N9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing, of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy# 9 Installation Crew Operating Policy Non Electrical Work at atypical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift setup o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional Flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including 'bonding/grounding related activities' • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifioptions o Any"plug and play devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities