2017-04-20 DPW Transmittal.pdfTo:Doug McDonald
Landscape Architecture Northampton DPW
Civil Engineering
Planning
Land Surveying
Project:Burts Bog Greenway &
Date:
Copies Date Description
3 4/18/2017 For your:
3 4/18/2017 Information
3 4/18/2017 Review & Comment
X Approval
As Requested
c encl:
4 Allen Place Northampton, Massachusetts 01060 Telephone (413) 582-7000 Facsimile (413) 582-7005 E-mail bdg@berkshiredesign.com
Christopher Chamberland, P.E.
Letter of Transmittal
4/20/2017
Limited Development
Plan Set (3 Sheets)
Stormwater Permit Application
Stormwater Management Report