Loading...
23D-149 (27) 115 HINCKLEY ST BP-2018-1059 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block:23D- 149 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Categorv: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2018-1059 Proiect# JS-2018-001911 Est.Cost: $45840.00 Fee: $75.00 PERMISSIONIS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sn. ft.): 54450.00 Owner: BRENDA EATON Zoning: URB(100) Applicant: PIONEER VALLEY PHOTOVOLTAICS AT. 115 HINCKLEY ST Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Liability GREENFIELDMA01301 ISSUED ON.411812018 0:00:00 TO PERFORM THE FOLLOWING WORK INSTALL ROOF MOUNTED SOLAR SYSTEM - 30 PANELS AT 10.8 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House ft Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy signature: FeeTvpe: Date Paid: Amount: Building 4/18/20180:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner APR 17 S.0 to Department use only City of Northampton o_ vrertnit: Building Department .—."=" y permit 212 Main Street Sewer/Septic,Availability Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE ORTWO pFAMILY DWELLING SECTION 1 -SITE INFORMATION 6/"_ I `Q— ` o t) 1.1 Property Address: This section to be completed by office a Unit 115 Hinckley St Florence, MA Map 54D Lot l q7 Zone Overlay District Elm St District Ca District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Brenda Eaton 115 1linckley Sl,Florence,MA 01062 Name(Pmo Current Mailing Address: (914)610-6668 See aLLaohment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative, LLC 311 Wells Street, Suite B,Greenfield, MA, 01301 Name(Prot) Current Mailing Address: e-01 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $45,840 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5.Fire Protection 6. Total=(1 +2+3+4+5) $45,840 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature Building Comoro nerllospector of Buildings Sea Section 4. ZONING All Information Must Be Congletad. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side U R: L R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved due #of Parking Spaces Fill: I, &Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW 0 YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O ^ DONT KNOW `0 YES 0 IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water o-wetlands? NO Q DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: C. Do any signs exist on the property? YES 0 NO e IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO O IF YES,then a Northampton Slonn Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing ❑ Or Doors EI Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [q Siding[[:I] Other[o] Brief Description of Proposed Work: i",......,ph., ...1111, all 1, n.r..a.,,......ih ,d, F n,—,roc Alteration of existing bedroom_Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes =_No Plans Attached Roll -Sheet ea.If New house and or addition to existing housina, complete the following: a. Use of building:One Family Two Family Other Ix, Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I. Method of heating? Fireplaces or Waodsloves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? In. Type of construction L Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank_ City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I. NAme ,as Owner of the subject property hereby authorize Philippe Rigollaud to act on my behalf, in all matters relative to work authorized by this building permit application. See attachment (A) Signature of Owner Date 1. Philippe Rigoliaud ,as Gwaer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. PHILIPPE RIGOLLACD Print Name 4/1D/2018 Signature of gnarregrt Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of Ucenae Holder Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address / 413-772-8788 Expiration Date /j�vntlw' Signature Telephone S.Registered Home Improvement Contractor: Not Applicable 0 Pioneer Vallev Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street Suite B Greenfield MA 01301 09/15/2019 Address Expiration Dale Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... El Ni.... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended ro include Owner-occupied Dwellings of one(1) or lwo(2)famifies and to allow such homeowner to engage an individual to-hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or Lou family dwelling,adached or detached structures accessory to such use and/or farm structures.A Person who coustructs more than one home in a two-year period shall not he considered a homeowner. Such"homeowner"shall submit to the Building Officialon a form acceptable to the Building Official.that he/she shall be responsible for all such work Performed under the buildipg Permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this Tenor is issud. Also be advised that with reference to Chapter 152(Wot kers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Ma+sachuse8s General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this pemut. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. �£N�ft Ei�DtJ a"av \% Printed Name Date rP Signature Title Proposal and Aggement 100013111 Ned 6 of 12 Brenda Ealon-reb,-,n 2018 ® Common.veallh of Massachusells Division of Professu>nai L.censure Board of Building Regulalions and Slandards -ocstructfcin Superr:isror CS-111266 Expires 031412021 DANIEL GOMEZ•GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner ' 001C( ci Consunsei h lairs and Business Reaulatlon One Ashhuri3n P;aa $,lite 7301 Boston. t.A, Ssachuset[s t'�10fi isme Irnpro,.gmi nt Contrscto, Regi=_iraLon _. q� CERTIFICATE OF LIABILITY INSURANCE BATo+.aazme THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER WE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(SI,AUWORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,Me policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to Me terms and conditions of Me policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endoreement(s). PROOUCEfl CHI Linda POwerS NAME: flebberfl Gunnell PHONE (413)5850111 (413)1 At Nor 8 NOM Krog Street AOIXtEss: IDov@rs�lwebCerandgnnnell tom INSURERS)AFFORDING COVEMGE AN. Nonnampion MA 01060 NU,NUNA- HDI Global IDS.CO''Energi INSURED INSURER B- Merkel'Enemi Poleer VaIIEVP OICV01DUCS GoopeldNve Inc INSURER Inter)IDS Co of Hannover'Ener9i Ann KIM Pinkham INSURER O'. 411\%ells Street Suite B U.NUSER E a Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBERIna,Ier Exp 1.2015 REVISION NUMBER: THIS IS TO CER71FY THAT THE PO'JCIE5 OD INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED HALTED ABOVE FOR THE POLICY PEI NBC= NOTWITHEANOING ANY REOUIREMENT TER14 OR CONDITION OFANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE LIAY BE ISSUED OR MN, PERTAIN,THE 1NSUR,V CE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SJ3!ECT TO ALL THE TERMS E%CL`JSI ONS AND CONDITIONS OF SUCH POLICIES.ULtI TS SHOVJN MAY HAVE BEEN REDUCED BY PAID CDA IMS ,A TYPE OF INSURANCE MUD AND POLICY NUMBER IWLDD'YYYp IMMDDYYYVI LIMITS COMMERCIAL GENERAL LABILITY = CIT CIRRCTCE a 1000CDC G+I:SatiE ❑x PC:..R FReals-s lEa N:m'reme 100000 r.1eE EIR ,;PYH Pe Excluded A EGGORC00241211A (1 01,01/2019 P saxawn:In..RY . 1OEM BY GEYL IGT REGAT=JR T A"?LES PER GENERALACOREOA-E • 2000000 PalcY °E�; 0L .0 PBEDLaE roMPPHICC . 2,880000 E AUTOMOBILE LIABILITY COM2IVEO SINGE LI]!li g 1➢OO OOO aloe, x AAr aTo Boor_v veJRrlre-Pssom A Zii^sa�Y iHOs_ED EAGCR0o0241218 01/012018 01012010 DcO.VOUJRY(Pvtl:PF9 5 HIH YG` C;'I;J �ROeERT'CAVGE S -C..:Y ±J'OS CC_Y IFE-1 11, Underinsured PREERM Bl S 20000 UUNELu MAN "" _ 5000000 _ .eozuPRE+c= e EXCE9SLA6 li-IIF 18EPXNE80457 01,00112018 01012019 AGG'EGAT- . 3000002 DED I I RETEA'IOV s WOWtIN!COMPENSATION OTF- ANDEMPOYERS'W9ILITY E-_TE ER A CM'FCE,RrnE1P Cw2EDe ur F-1N.A EINGCF0002412118 01'012018 01/01/2019 E>_II dTE'ILDILT . 1000000 MR, RN. In NHl E: DSEIE,-EADc LCYEE $ 1.ODD 000 Iles 1-IiO,:1 _ G_1111LIT=CRER410N1II, I EL OIBEASE-P0.In IIIdIT 11,000000 .Tal Fiopeny Bu sin es,Pere Prii 51750000 C mmerc CPR18E178D1 01012018 O1O1OO10 In,IXINE,T 5350.000 DESCRIPTION OF OPERATIONS'LOCATIONS.VEHICLES EXCESS 101.AEU1Uonal FRI Tlo.RLII AT Oe aM:OM nmort space b INDIRE l CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE E%PIRATON DATE THEREOF NOTICE WILL BE DELIVERED IN Elden,01I Tura, ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE q ©1988-2015 ACORD CORPORATION. All rights reserved, ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD The Common wealth of Massachusetts 111 Department of 1 ndustrial Accidents ] Congress Street, Suite 100 Boston, M9 02114-2017 www.mass.gov/dia 1Forkers'Compensation Insurance Affithi Builders/Contractors/Electricians/Plumbers. TO BF,FILED WITH THE PERMITTING AUTHORITY. Applicant If F Please Print Ldyibty Name(Business)OrgarivatioMndividua): Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Add ress:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Photic #:413-772-8788 Are you an chaplet r?Check the appropriate box: Ty pe of furor act(rcq hired): 1.EJ IamacmPlv,r1atb48 - --emplu)ccs(lull aaj,pan once) 7. ❑New construction 2,❑lamasola pmpridoror pennasM1ip and have no omployecs wading forme in 8. E]Remodeling anyrapacity_I Nowodm'comp. mance equosil . 3_❑I am a homcowltt drain all nrak m IC No nudcn'icor, ,)sura c d_ 9. ❑Bedding n gra Ysc f P .regolm ). 10 E]Building addition 4_❑1 h o - d llh o, _ s try pmpc r). lull . award ma,anconvaaosead either have nnnvemnr n� mtan corarc sole IL❑Elcctncal repairs or additions pmpncro¢wi0 w employees_ 12,E]Plumbing repairs or additions 5.M Ian,a goradal contractor and l have hired(he sub-mnvamoo Its:edo rbeanaebedsbear 13 E]Roof repairs Thesr subcommrrorshave enployces and have vv kus romp.inen-anecv . 14 [Z]Other Solar PV 6.❑wcu wenttxsedtheir right o'ecuMGLc 12tIf0.aildwehacnocmplotccs NraxrarkcrS trade, required] `Ane apohounuharrhroks box#1 mus,atm fit on,rhe-tion below shown enccir wurkorscoinpcnsat3oliplleyinforilwtion. I riwrawors.,who,oleno ue—f6donardeatin„h,arc date,all-eka it her tire outside rommemt3 num susno a non affidavit indicating such. IComractors has stock it...box must auachcd an addirionol sM1cn-brat Ing"M1'rams ofrhe subcontractors and stare mM1CIM1cr or not chair metrics have employee Iffir torewnrl ..M1evectnplo)ces.,hewmus,pmride,kair vorkcn rare,policy number I am an employer that is providing workers'compensatinn insurance for oq employees. Below is the policy and job site information. Insurance Company Name: HDI Global Insurance Co/Enerli Policy#or Self ins.Lig.#:EWGCR0002412118. Expiration Date 01101/2019 Job Site Address: 115 Hinckley St _ City/Stale/Zip: Florence, MA 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failnm to secure coverage as required under MGL c. 152.$2:A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties i i the form of a STOP WORK ORDER and a fine of up to 5250.00 a day against the violator.A copy of this statement may be foretraded to the Office of Investigations of the DIA for insurance coverage verification, I do hereby certify,under the pains and penalties of perjury that the information provided above is true and correct. Si nature: iDate: 4/10/2018 Phone#:413-772-8788 44 Official use only. Do not write in this area,to be completed by city or town officiat. City or Town: _ Permit/License# Issuing Authority(circle one): I.Board of Health 2.Building Department 3.City:Two n Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Q 5�0 EATON - FLORENCE House Roof PV Array (Asphalt Roof) 2 BORM Array 3 BDRM Arra/ Owner: Brenda Eaton Address: 115 Hinckley Street, Florence, MA Phone: (914)610-6668 �maill- brendaaeatonPaol.com System Size : 10.8 kW DC PV Arrav: (30)SPR-360 DC mods five rows of six modules in portrait position. See drawing right. Mountine: Iron Ridge racking on L-feet on Lt Quickfoot bases I� J Roof Structure: Engineered roof framing @r 16' OC. 4/12 Pitch. See Stamped Plans Roofing Material: asphalt composite 15 N W shingles a - KUHN RIDDLE Bnxms�HtTErtTv 5951610 ev w.�mrwm��� M WPJG BUILDERS t —_—_—_—_ — — — - - --_— —_ --_ RrviSedP...... Qmertumon � 0 p Drnwin¢5 O O I — �"e?�O Hinckley Tn<e '. Fl.nmm MA 1 �� vM ._____ FXI'ERIOR ELEVATIONS AZ.1 z zG •m.. 1.�� ..,�..., KUHN RI DDLE — — —_--__ _ _�_y c 'TEC cTI I 919 E 59 1610 a RG L4-1 MOM n .Q a w �M. YILHIGHT .a GUILDERS Vai9 •ncamronwnuxxoru. 3 � nklT LL -M]TTI'M -77777 m : - �� FIU.UINO PIANS ....wro.,<�A.w�+wEo.wnw�nnE�Elwnwa�.n..a......::o.....�. �--- I- _o�n..,• AS I.I Array "'Nod' volnt mRro.el:on[e See Note x1 cor—n6artaY { PrtryEiB'Om.all —� apP ox.IjYa'to apProx s.to eaning an, #�` existing array Roo1080'bnrall 11114 R IH 69' 'LL or pres rf� .F 3E'bP .en. a o W ,..e arls 12 n n.. e...roe.. 19$" ISI esen, rq v Array Layout en. Openammsn li on E-fasen QsIK—r Y.Iityrd rs q-Bl e—s ed to .of uauno w1. 0z4'0.e L.raL.Eea et last UpsLOPg raamg e. E(GRK PSS 5/16'x3-1 A'rai[eners. µryere rail is exposed Opy/NSLOPF unless /^e ' men to a..edge, otFerMse noted. ea �m t r�r. More than 22% Efficiency High Performance & Excellent Durability deal for roofs mei s space is ata prerFLrt or wrere future e.uc siarl might oe needed. Maximum Performance SERIES Des gred to de Iver the most energy to demanAmg lea-vaorld to ndl tions,In partial _hale arc hot rooftop ternperetves'>= Premier Technology Engineered it,the newestand most powerfol 11122 all Maxeor technology,X-Series brings unmatcred nov,and performa nee toyocr nome. Highest Efficiency Generate more energy per square foot series rese itc i rrin- t1.I,si r ; itto,hrr it l hr, ta02 f14Emorel ..er he, par el Wali Iunci per spc„ e crtC erLJ ears' on k Oft"44"hwk / Highest Energy neryrodutedwa Produce more energy per rated watt maxeon^solar cedrwndamtntalry bettert p rr rralCe(diens a-to ecrp , rc matt £rgir od o p,rfr,,-t, der, f ttrnab r, T I,adcv L.oa ,.amu I c tn't, ,,I, c ig21" n'o2P "gr [..litho f- t25 1(1reetyeur ,V,. Engineered for Peace of Mind Designed to aenrer consstert trouble-free 21 % Pri over a ve,v org Letme. Designed for Durability Ife S,hCIL _.-IarCelllstte r,, al bclto aso tcappe fn 1 ton.V.rt,raly - ripe rt,rs to C"te corrc,,or and cracking that rm,,,ce conventiocal panels. Sam tela tc.r'ma as" Seel espzrels_ FIR rF vv iWei .1jr,oiryrrst' u. 100'f e COm eIJ'ab t,tesV Power Warranty P,,dua Wdrrcnry oe eed pm.Pr5 ; _u P d Prot j t t rS-re- -.- . ¢ ,e. s r c,-spa-d _d r-oss. .e SPIRM360 i d JTes UL70 s R F rl Rai ng).IFC 6'2 E EiTO vo illa P, J '. -its ISO 9301 2DO6r 14J01 2004 ?oi T S ok PHS 0,14111561 D07 .eau f e tinCH A, P, E1 Y_ fH pne 11 . 1 P [ PaisO pF -6 sr r u ad_in(rad P(e g be for LEED po rate Ra¢m. , Inntr , ,Tea ECSJ16 Crr �� 0 0",C c. [Vo Tagehor, ,3v De'In Teri 101105/NSf 2013.674a43T Sl¢s1.r,rCvrrenc0>7 _ 6JSc DaTest _C51TOl l- ma �ceeri� _ � Pd21,y.er Jong_ G7 . UI AlOD) iE' PIDTes Pote'i[a hduced Degrada:oP hoe iCOO V' Ata "on,Fos, LA ! alt,L,r L -,'JET.CEC Ps­,E,Te ..eF l tf, Cut T ,Colt 1 ]no e tT nn,Cod -- e rnt 4 Fro-18 Fl T Ct --Kn q - - npaeP,ssm r 1 it,I_Em i,neerin a,52nphr2.-rsl 'ea'arce Cas A- S-ar Ccs 96 r �_M1<azece Glow ` ' ' I IT , ro;e H [ sr-�son Lempe"darit ,te, o,so, i?6c idUcclnpame u lm'r, ' b_086ryj Na. lean di@i_ O'' p, ,it",Mr bac. _ �>S ryf LOCS Pa 611 kg1m=>orn Ii . -� Fam1 cack<ind red N gbesrAsrJArarrig) 4,mm 1556 mn [I Bin] [61 31n] I.I01 PROnLE + I" l[or m m [41 , lin 2in1 4 I mr�ne J�c IRONRIDGE XR100 Rail See Description / Length Rail Sect ion Properties Property Value Totol Cross-SectMal Area 0.582 in' .66 Section Modulus (X-oxis) 0.297in' '46 Moment of Inertia (X-axe) 0.390 in° Moment of Inertia (Y-axis) 0.085 in' Torsional Constant 0.214 in' Polar Moment of India 0.126 in' 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 X34,000 PSI YIELD STRENGTH MINIMUM L 58 125 Clear Part Black Part Description/Length Material W eight Number Number XR-100-132A XR-100..328 XR100, Rai1132"�I1 Feet 7.SO Ibs. 6000-Series XR-100.768A XR-100.1688 XR70D, Rai1168"ltd Feel 9.SS Ibt. XR-100.204A XR-100.2068 XR70D, Rai1204" 17 Feeil Aluminum I1.601bs. v1.1 IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE Go ev 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1.24 63 1.93 .31 T 0.42 .15 .93 #12-14 TYPE"B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear [ v1.0 QuikFoot— Product Guide ... roar, F i,lar=riaL Materials Needed for Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 2 Fastener(Length to be determined) 2 A1 >*.� 3 QuikFoot Flashing 1 4 EPDM Washer 1 5 L-102-3"Bracket e(other options available) 1 Q 6 5/16" EPDM Bonded 18.8 SS Washer 1 7 3/8"Stainless Steel Hex Nut 1 3 Required Tools !� 1 r a dZeal) '' r , j 87]-859-3947 EcoFasten Solar'All content protected under copyright All rights reserved 10/09/14 Ll EcoFasten Solar ri eeprononod by the following O S.Palenls:8,151,522628.153 700 32 8 181 398 62 8166,I13 B26.146299 B28,2H 914 82 8,245 454 92 8.272.174 82 8 225 557 62 � I QuikFoot- Product Guide '_ot Sl,.eets QF 4..Bas^ I 2X 0 .33in t [8.38mm] I > I . ® 1 00 1 .SOin [38.IOmm] 3/8"-16 Stud C!.' jam.. rn ^r ? rn ��4 QF-M : 1 .5" QF-L ] .75' 877-859-3947 EcoFasten Solar'All content pr0leded under copyright.All rights reserved.10109/14 31 EwFespon Soler products are promped by the following B S-parcels.8.151522928.153,700 B28.181,398 B28.166713 B28.146299 B28.209,914828,245,454828,272,174 B28,225557 B2 , QuikFoot— Product Guide L�c_ 17s: 0`1F ' R.38in �[9.53mm] 032in 0,81 mm Cd V1 12.00in [ , [304.80mm' 3.00in Com; [76.20mm] a.ept«man _� € _ 5 8.00in [ 12.70mm Oil- -20320mm 877.8593947 E.Fasten Soh, All c hent I'Msted undenbpYdghl.All rights rese',,d 10/09/14 3'Z ECPPaslen S610r pmtlua150re p,O-Ied 01O bllOwl9LLS.Fetents8.151522628.153.100B2B:181,3985'28.166,713820.1467999?BS09214821245,0.5d 02992194929,215.55]92 QuikFoot– Product Guide Cut Sheets: Bracket Options - SCL-101-3 I 3/8' '—'i F, A 46 SERRATIONS s O v I I . ,.' I l __J t* L _� Rl/16' 7/8 _" 3/4" --. 1/16" F� R.005 R.01O 2X R.OI R 4 60.00° +.006 pry 3/8�,_.002 — - 1/81, 7/8" X 82° DETAA IL A E 3 1 877-859-3947 EcoFasten Solar All content protected under copyright All rights resorted.10109/14 37 EreFeslen Solar products are preferred by the following i Patents:8,151,522 82 8.153,700 62 8 181 398 52 8 166 713 92 0.146,299 B2 8,209,914 82 8 245 454 82 8,272.174 02 8225,557 B2 QuikFoot— Product Guide �peci`iea rlo��c =r I ,"=f�l'-Ftr•L 1. i • 5�ier�l--a'_ A. WORK INCLUDES A. Submit manufacturer's written specifications, B. Base plate is 6000 series aluminum with one I. QuikFoot base one attachment bracket that B. Submit standard product cut Sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C Submit installation instructions. C Fasteners to be compatible with chosen roof ® 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values l for the roof system. as shown in load test data ^I ultimate and allowable load values specific to B. RELATED SECTIONS the roof deck specified for the project. D_ Counter flashing 1s.032gauge aluminum em- 1 Section 07600 Flashing and Sheet Metal bossed to accept shape of stainless steel base 2 Section 07500_Roofing iq QUAL dR:R/.NCE plate T©� 3.Division 1-Administrative and Procedural Installerto be experienced In the installation of Requirements specified roofing material for no less than 5yearsln I F -I^FISH 4 DI 5 i Thermal and Moisture Protection the area of the project. 'L 'T F_ rPlr Cf< A Bracwt is mill finish aluminum A. COMPONENTS 17 'IE;-HEP'/STCPAte/HANDLINt� B Base flashing-Black-kynar painted 1 QuikFoot system consists of aluminum Inspect material upon delivery Notify manufacturer bracket and base plate with N)stainless steel within 24 hours ofany missing or defective items. DART - 'XiECUTION stud,(1)stainless steel nut,(1)EPDM washer Keepmatenal dry,covered,and offtheground until and(1)bonded stainless steel and EPDM Installed. , \arch NArt ION washer. A Substrate'. Inspect structure on which brackets r/ 2. Fasteners PART 2-PRODUCTS aretobeinstalledand vengthatltwillwith- /. ., A.To bebbrackmetal compatible et. with QuikFoot stand 2.,. Pr�Adv' , A.T'JRE? any additional loading that maybe incurred. W B.Fasteners should be selected for compat EcoFasten Solar ibility with the roof deck 289 Harrel Street, MorrisNlle,Sr 05661 B. Notify General Contractor of any deficiencies :O C Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolarcom system.See test data at C Verify that roofing material has been installed www.ecofastensolar com 7 MATERIALS correctly prior to installing solar attachment 3, Sealant(if required by roof manufacturer): A. Attachment Bracket brackets. to be roof manufacturer approved. 6000 Series Aluminum(choose one) r 4, Aluminum counter-flashing 1,CP-S -Slatted 5 ' Comply with haN g 1- A engineer's recchimendalonsdrawingsfand project v 5. Aluminum attachment bracket 2. F-111-A � engineer's recommendations for location of 3.P3-CSK system.Complywith Manufacturer's written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3`TM stallation instructions For installation and layout.1. Bracket spacing to be recommended by 5. L-102-3" project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom -. assess existing structures to make sure that they can withstand retained Toads. 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved. 10109114 41 EcoFasten Solar products are retained by the collowing U S_Patents:8.151,522 82 9.153,700 62 8.101 398 82 8.166 713 B2 8 146,299 82 8 209 914 B2 8 245.454 B2 8,272.Ise 32 8225,557 Be Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Hoard of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector cordd interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Lvw, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the elect-ici,:y associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts .icensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 S§3 _hrough 5§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Snug � RF Q�G PV nSquared Solar j J Fox.w. vsquared coop 413-772-8668 Phone:413-771-8788j Fax:413-771-8668 311 Wells St.,Ste.B j Greenfield, MA 01301 MA Elec.Lic A13764 1 MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager