Loading...
31A-010 275 Elm St-PB Site Plan Approval-2018 Planning - DecisionCity of Northampton Hearing No.:PLN-2018-0040Date: March 26, 2018 APPLICATION TYPE:SUBMISSION DATE: PB Intermediate Site Plan2/8/2018 Applicant's Name:Owner's Name: NAME: NAME: VERIZON WIRELESSNational Grid ADDRESS:ADDRESS: 99 EAST ST25 Research Drive TOWN:STATE:ZIP CODE:TOWN:STATE:ZIP CODE: EAST HARTFORDMA06108WESTBOROUGHMA01582 PHONE NO.:FAX NO.: PHONE NO.:FAX NO.: (413) 737-1131 EMAIL ADDRESS: EMAIL ADDRESS: Site Information:Surveyor's Name: STREET NO.:COMPANY NAME: SITE ZONING: 275 ELM ST URB(100)/ TOWN:ADDRESS: ACTION TAKEN: NORTHAMPTON MA 01060 Approved MAP:BLOCK:LOT:MAP DATE: SECTION OF BYLAW: 31A010001 Chpt. 350- 11: Site Plan Approval TOWN:STATE:ZIP CODE: Book:Page: 4477253 PHONE NO.:FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK: INSTALL A WIRELESS TELECOMMUNICATIONS ANTENNA AND RELATED EQUIPMENT ON A REPLACEMENT UTILITY POLE in the the right of way near 275 Elm St. HARDSHIP: CONDITION OF APPROVAL: FINDINGS: The Planning Board approved the request for new telecommunications equipment to be located on an existing national grid utility pole based on the information submitted with the application as follows: Coverage maps, construction drawings , site justification The Board granted the site plan based upon determining the criteria had been met in both the site plan standards 350-11.6 and the permitting for telecommunication facilities. A. The requested use protects adjoining premises against seriously detrimental uses. This is an expansion of the existing utility pole installed on the street. B. The requested use will not change existing vehicular traffic movement or safety on the street. C. The site will function harmoniously in relation to other structures and open spaces to the natural landscape, existing buildings and other community assets in the area as it relates to landscaping, drainage, sight lines, building orientation, massing, egress, and setbacks. Added equipment to the pole will not change the function of the pole as a piece of infrastructure for various utilities. D. The requested use will not have an effect on the City's resources, including the effect on the City's water supply and distribution system, sanitary and storm sewage collection and treatment systems, fire protection, streets and schools. E. .The requested use meets any special regulations set forth in this chapter as it relates to telecommunications facilities in 350-10.9 for colocation and aesthetics to the maximum extent which is practical and technologically feasible, to ensure compatibility with surrounding land uses. This shall include, but not be limited to, the following items: COULD NOT DEROGATE BECAUSE: FILING DEADLINE:MAILING DATE:HEARING CONTINUED DATE:DECISION DRAFT BY:APPEAL DATE: 3/1/20183/15/20184/5/2018 REFERRALS IN DATE:HEARING DEADLINE DATE:HEARING CLOSE DATE:FINAL SIGNING BY:APPEAL DEADLINE: 3/8/20184/14/20183/22/20184/5/20184/15/2018 FIRST ADVERTISING DATE:HEARING DATE:VOTING DATE:DECISION DATE: 3/8/20183/22/20183/22/20183/26/2018 SECOND ADVERTISING DATE:HEARING TIME:VOTING DEADLINE:DECISION DEADLINE: 3/15/20187:00 PM6/20/20186/20/2018 MEMBERS PRESENT:VOTE: Euripedes DeOliveiravotes toGrant GeoTMS® 2018 Des Lauriers Municipal Solutions, Inc. Planning - DecisionCity of Northampton Hearing No.:PLN-2018-0040Date: March 26, 2018 Dan Feltenvotes toGrant John Lutzvotes toGrant Mark Sullivanvotes toGrant MOTION MADE BY:SECONDED BY:VOTE COUNT:DECISION: Mark SullivanDan Felten4Approved MINUTES OF MEETING: Available on the City's website at www.northamptonma.gov I, Carolyn Misch, as agent to the Planning Board, certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on the date shown above. I certify that a copy of this decision has been mailed to the Owner and Applicant. ___________________________________ Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt. 40A, Section 17 as amended within twenty (20) days after the date of the filing of the notice of the decision with the City Clerk. The date is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. GeoTMS® 2018 Des Lauriers Municipal Solutions, Inc.