Loading...
31C-054 (3) .gIc-05? I til FO.0 t l +FE wrightsoft Load Short FormLFEB2 1 2011 Job:Data: LOT Entire House By: RICHIE RICHIE'S AIR CONDITION! EATING SI Industrial Lane.Agawam,Ma y� Project Information a�y t�� AO For: LOTAPP4SI l SS t THE PECOY COMPANY L 1:1 CRtiSS}tl. VILLAGE HILL,NORTHAMPTON,MA Design Information Htg Clg Infiltration Outside db ("F) 0 87 Method Simplified Inside db(°F) 70 75 Construction quality Best Design TD(°F) 70 12 Fireplaces 0 Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/lb) 28 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cand AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 MBtuh Sensible cooling 0 Bluh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 758 dm Actual air flow 758 cfm Air flow factor 0.029 cfm/Btuh Air flow factor 0.053 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.95 ROOM NAME Area Htg load Cig load Htg AVE Clg AVF (ft2) (Btuh) (Bluh) (cfm) (cfm) FIRST FLOOR p 1081 13656 7487 399 400 SECOND FLOOR p 830 12281 6845 359 366 Entire House d 1911 25937 14172 758 758 Other equip loads 0 0 Equip.Q 0.92 RSM 13038 Latent cooling 823 TOTALS 1911 25937 13861 758 758 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed, -rfr wrightsoft2017-Feb-06u00 05 9 Rig 12 0.11 nsu1131a Pagel ...sees\wheanleeakloptOAD51RICHIES PECOY LOT 2A NORTMAEwrvp Cale.MJ7 Front Dom tams : Gn PSOC4 IT4 9 Load Short Form Job: LOT�wentlitw +I+ wrightsoft Date: at FIRST FLOOR By: RICHIE RICHIE'S AIR CONDITIONING & HEATING et Industrial Lane,Agawam,Ma Project Information For: LOT.G A 160.111.11110 THE PECOY COMPANY N9 Sbe.o tail. VILLAGE HILL, NORTHAMPTON, MA Design Information Htg Clg Infiltration Outside db (SF) 0 87 Method Simplified Inside db(CF) 70 75 Construction quality Best Design TD (°F) 70 12 Fireplaces 0 Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/Ib) 28 24 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 T Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (IF) (Btuh) (Btuh) (cfm) (cfm) DEN 272 4413 2719 129 145 FAMILY ROOM 289 3780 2032 110 109 DINING/KITCHEN 520 5463 2737 160 146 FIRST FLOOR p 1081 13656 7487 399 400 Other equip loads 0 0 Equip. @ 0.92 RSM 6888 Latent cooling 466 TOTALS I 1081 I 13656 I 7355 I 399 I 400 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wrightsoft Right-Suite®universal 2012 12 0 11 RSu17313 2017-Feb-0614DO 45 Page 2 _serslwbean\DesktopLLOADMRICHIPS PEOOV LOT 20A NORTHVIEW.mp Cahn=Mll Front Poortaces. 45 IbaQ Cas14 9 Load Short Form Job: LOT t ata wrightsoft Data: a1 SECOND FLOOR By: RICHIE RICHIE'S AIR CONDITIONING & HEATING 811ndLAnal Lane.Agawam,Ma Project Information For: LOT 1s IIS, THE PECOY COMPANY 4`t P¢D CAL 3 VILLAGE HILL, NORTHAMPTON, MA Design Information Htg Clg Infiltration Outside db (°F) 0 87 Method Simplified Inside db(°F) 70 75 Construction quality Best Design ID (°F) 70 12 Fireplaces 0 Daily range - M Inside humidity(%) 30 50 Moisture difference(gr/lb) 28 24 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) BATH 1 170 1408 579 41 31 BED 1 400 5405 2846 158 152 BED/BATH 2 260 5468 3419 160 183 SECOND FLOOR p 830 12281 6845 359 366 Other equip loads 0 0 Equip. @ 0.92 RSM 6297 Latent cooling 357 TOTALS I 830 I 12281 I 6654 I 359 I 366 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. '+{'k wrightsoft 2017-Feb-06 14:00'45 9 RigOLSup�U niversa1201212.0.11 RSU17313 Page _sersiwbean\DesktoplLOADSIRICHIE'S PECOY LOT 20A NORTHVIEWmp Calc=MA Front Door faces: .LINO la 4 ' t '',. , Wa-' • 0...,5-1 ooh p t ' --4-M111111 -Z/ to -, A 0,12 —ssnis - —Ti ito7` _AS I o trio/eassiiNge d"J t 14 ,..i,(2 o f/ .. i 1, 1 I el I. (_i' OS/ 1 to/33 e3 c31 U„ctt yj.? n5 , w3705/ wT, i«...-1-7 cot wS`7 one ,, , v ;` 1 Y r ? u+f7 a,$/ n'fV ' s ,1a C p 1 i N. 1 Lis 4Nrtti t e'aSbh1t J. •? - o'47/0 9H19 I7 4. tit Vsles 6 -4 • al - f 7 coo. • • I 04 4 •06 4 it- so, di" 77-n 6 tore fie _AT 4110. 41r it, at* I hes, OP tit Cot4'$,Iggie4‘P. f-