31C-054 (3) .gIc-05? I til FO.0 t l
+FE wrightsoft Load Short FormLFEB2 1 2011 Job:Data: LOT
Entire House By: RICHIE
RICHIE'S AIR CONDITION! EATING
SI Industrial Lane.Agawam,Ma
y�
Project Information a�y t��
AO
For: LOTAPP4SI l SS t THE PECOY COMPANY L 1:1 CRtiSS}tl.
VILLAGE HILL,NORTHAMPTON,MA
Design Information
Htg Clg Infiltration
Outside db ("F) 0 87 Method Simplified
Inside db(°F) 70 75 Construction quality Best
Design TD(°F) 70 12 Fireplaces 0
Daily range - M
Inside humidity(%) 30 50
Moisture difference(gr/lb) 28 24
HEATING EQUIPMENT COOLING EQUIPMENT
Make Make
Trade Trade
Model Cand
AHRI ref Coil
AHRI ref
Efficiency 80 AFUE Efficiency 0 SEER
Heating input 0 MBtuh Sensible cooling 0 Bluh
Heating output 0 Btuh Latent cooling 0 Btuh
Temperature rise 0 °F Total cooling 0 Btuh
Actual air flow 758 dm Actual air flow 758 cfm
Air flow factor 0.029 cfm/Btuh Air flow factor 0.053 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.95
ROOM NAME Area Htg load Cig load Htg AVE Clg AVF
(ft2) (Btuh) (Bluh) (cfm) (cfm)
FIRST FLOOR p 1081 13656 7487 399 400
SECOND FLOOR p 830 12281 6845 359 366
Entire House d 1911 25937 14172 758 758
Other equip loads 0 0
Equip.Q 0.92 RSM 13038
Latent cooling 823
TOTALS 1911 25937 13861 758 758
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed,
-rfr wrightsoft2017-Feb-06u00 05
9 Rig 12 0.11 nsu1131a Pagel
...sees\wheanleeakloptOAD51RICHIES PECOY LOT 2A NORTMAEwrvp Cale.MJ7 Front Dom tams
:
Gn PSOC4 IT4
9 Load Short Form Job: LOT�wentlitw
+I+ wrightsoft Date: at
FIRST FLOOR By: RICHIE
RICHIE'S AIR CONDITIONING & HEATING
et Industrial Lane,Agawam,Ma
Project Information
For: LOT.G A 160.111.11110 THE PECOY COMPANY N9 Sbe.o tail.
VILLAGE HILL, NORTHAMPTON, MA
Design Information
Htg Clg Infiltration
Outside db (SF) 0 87 Method Simplified
Inside db(CF) 70 75 Construction quality Best
Design TD (°F) 70 12 Fireplaces 0
Daily range - M
Inside humidity(%) 30 50
Moisture difference(gr/Ib) 28 24
HEATING EQUIPMENT COOLING EQUIPMENT
Make n/a Make n/a
Trade n/a Trade n/a
Model n/a Cond n/a
AHRI ref n/a Coil n/a
AHRI ref n/a
Efficiency n/a Efficiency n/a
Heating input Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Temperature rise 0 T Total cooling 0 Btuh
Actual air flow 0 cfm Actual air flow 0 cfm
Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat n/a Load sensible heat ratio 0
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(IF) (Btuh) (Btuh) (cfm) (cfm)
DEN 272 4413 2719 129 145
FAMILY ROOM 289 3780 2032 110 109
DINING/KITCHEN 520 5463 2737 160 146
FIRST FLOOR p 1081 13656 7487 399 400
Other equip loads 0 0
Equip. @ 0.92 RSM 6888
Latent cooling 466
TOTALS I 1081 I 13656 I 7355 I 399 I 400
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
wrightsoft Right-Suite®universal 2012 12 0 11 RSu17313 2017-Feb-0614DO 45
Page 2
_serslwbean\DesktopLLOADMRICHIPS PEOOV LOT 20A NORTHVIEW.mp Cahn=Mll Front Poortaces.
45 IbaQ Cas14
9 Load Short Form Job: LOT t ata
wrightsoft Data: a1
SECOND FLOOR By: RICHIE
RICHIE'S AIR CONDITIONING & HEATING
811ndLAnal Lane.Agawam,Ma
Project Information
For: LOT 1s IIS, THE PECOY COMPANY 4`t P¢D CAL 3
VILLAGE HILL, NORTHAMPTON, MA
Design Information
Htg Clg Infiltration
Outside db (°F) 0 87 Method Simplified
Inside db(°F) 70 75 Construction quality Best
Design ID (°F) 70 12 Fireplaces 0
Daily range - M
Inside humidity(%) 30 50
Moisture difference(gr/lb) 28 24
HEATING EQUIPMENT COOLING EQUIPMENT
Make n/a Make n/a
Trade n/a Trade n/a
Model n/a Cond n/a
AHRI ref n/a Coil n/a
AHRI ref n/a
Efficiency n/a Efficiency n/a
Heating input Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Temperature rise 0 °F Total cooling 0 Btuh
Actual air flow 0 cfm Actual air flow 0 cfm
Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat n/a Load sensible heat ratio 0
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft2) (Btuh) (Btuh) (cfm) (cfm)
BATH 1 170 1408 579 41 31
BED 1 400 5405 2846 158 152
BED/BATH 2 260 5468 3419 160 183
SECOND FLOOR p 830 12281 6845 359 366
Other equip loads 0 0
Equip. @ 0.92 RSM 6297
Latent cooling 357
TOTALS I 830 I 12281 I 6654 I 359 I 366
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
'+{'k wrightsoft
2017-Feb-06 14:00'45
9 RigOLSup�U niversa1201212.0.11 RSU17313 Page
_sersiwbean\DesktoplLOADSIRICHIE'S PECOY LOT 20A NORTHVIEWmp Calc=MA Front Door faces:
.LINO la 4
' t '',. , Wa-' •
0...,5-1
ooh
p t ' --4-M111111
-Z/ to -, A 0,12
—ssnis
-
—Ti ito7` _AS I o
trio/eassiiNge
d"J
t 14 ,..i,(2 o f/ .. i
1,
1 I
el I. (_i' OS/
1
to/33 e3 c31 U„ctt
yj.? n5 , w3705/
wT, i«...-1-7 cot
wS`7 one ,, , v ;` 1 Y
r
?
u+f7 a,$/ n'fV ' s ,1a
C p 1 i N.
1
Lis
4Nrtti t e'aSbh1t J. •?
- o'47/0 9H19
I7 4.
tit Vsles 6
-4
• al - f
7
coo.
•
• I
04 4
•06
4 it-
so,
di" 77-n
6
tore fie
_AT
4110. 41r
it, at* I hes, OP tit Cot4'$,Iggie4‘P. f-