Loading...
567 Letters BOARD OF HEALTH MEMBERS JAY FLEITMAN,M.D.Acting Chair. ANTHI SCRIMGEOUR,MHEd,CHES SUZANNE SMITH,M.D. STAFF Peter J.McErlain,R.S.,MPH Acting Director of Public Neagh aicia Abbott,R.N.,Public Health Nurse Madeline Heon,Clerk lay 8,2008 Ir. & Mrs. Stanley Moczulewski 37 Sylvester Rd. lorence, MA 01062 CITY OF NORTHAMPTON MASSACHUSETTS 01060 OFFICE OF THE BOARD OF HEALTH Re: Septic System Failure, 567 Sylvester Rd.,Map 21, Lot 5 212 MAIN STREET NORTHAMPTON,MA 01060 (413)587-1215 FAX(413)587-1221 sear Mr. &Mrs. Moczulewski: s you are aware, on May 8,2008, a representative of the Northampton Board of Health conducted an inspection f your property at 567 Sylvester Rd., in response to a complaint. That inspection revealed that your subsurface ewage disposal system has failed. (Sewage is flowing to the surface of the ground at the left side of your roperty and into the adjacent roadway drainage swale.) This condition constitutes a public health nuisance and is ‚violation of 310 CMR 15.000 State Environmental Code,Title 5. lnder authority of Mass General Laws, Ch. 21A, Sec. 13, and Ch. 111, Sec 123 you are hereby ordered to repair if your septic system and bring it into compliance with the provisions of 310 CMR 15.000 within ninety(90)days of he receipt of this notice. You must begin this process by having a percolation test conducted by a Registered sanitarian or Registered Professional Engineer within thirty(30)days of the receipt of this notice. 1ny work to repair/upgrade your septic system must be performed by a licensed septic installer in accordance with flans approved by the Northampton Board of Health. n addition, in order to limit the risk of health hazard to you and the public, you must take steps to reduce the rolume of sewage generated, and periodically pump your septic tank to prevent sewage from flowing to the ground surface until such time as the repair of your septic system is complete. You are entitled to a hearing on this matter provided that a written request for such a hearing is filed with the Board of Health office within seven (7)days of the receipt of this notice. Enclosed for your information, please find a list of sanitarianslengineers who routinely perform pert tests and prepare septic plans in our area. Please feel free to contact me at the Board of Health office, (413) 587-1213, if you have any questions. Very ly our 5 Peter J. McErlain Health Agent Certified Mail: #70062760000522430042 cc: Nothampton DPW,Attn: Paulette Kuzdeba Northampton Building Commissioner Anthony Patillo BOARD OF HEALTH MEMBERS 'LEITMAN,M.D.Acting Chair. II SCRIMGEOUR,MHEd,CHES SUZANNE SMITH,M.D. STAFF a ter J.McErlain,R.S.,MPH ing Director of Public Health Abbott,R.N.,Public Health Nurse Madeline Heon,Clerk 15, 2008 Mrs. Stanley Moczulewski ylvester Rd. ice, MA 01062 CITY OF NORTHAMPTON MASSACHUSETTS 01060 OFFICE OF THE BOARD OF HEALTH Re: Septic System Repair Permit 212 MAIN STREET NORTHAMPTON,MA 01060 (413)587-1215 FAX(413)587-1221 Mr. &Mrs. Moczulewski: tsed please find a Disposal Works Construction permit and an approved copy of the plan to repair your septic m at 567 Sylvester Rd. are now able to proceed with the replacement of your septic system. n you have selected a contractor to do the work please notify the Board of Health. se feel free to contact me at the Board of Health office, (413)587-1213, if you have any questions. ik you for your cooperation. ours, :r J. Mc rlain 5 Inspector ENVIRONMENTAL DESIGN, INC. 101 OLD FERRY ROAD NORTHAMPTON, MA 01060 1413-585-5020 November 4, 2008 Board of Health Town Offices Northampton, MA 01060 re: Inspection of Septic System Repair, Moczulewski Home, 567 Sylvester Road Dear Board: On October 16, 17, & 21, 2008, I performed Sub-grade and Final Inspections of thellsed ptic system repair installation referenced above. The system was installed by Duffy Wiof Florence, MA. I determined that the system appears to have been installed properly and in general gallon Septic Tank accordance with our system plan dated 06-04-08. A low-boy" due tos extensive ve ledge restrictions in the required c Health k area. The as-built c consultation, of photos relevant atystem components f the construction are documented d on the he_attached drawing and color If there are any questions, please contact our office. SSiiinncerelly'yours, Mi c , -1 . igne I hereby certify t the abo system s installed in accordance with Title V and the approved system sign prepared by Environmental Design, Inc. Du Willard Florence MA IBM: Bottm of House Siding at Coma Shown. Elevation-100.01 AS-:'UUT (a.t.s.) M oczaalewskn Home 567 Sylvester Road laso Galion Northampton, MA Septic Tank / —9"b.g / Bbox 10-21-08 / —12"b.g. Loathing Galley C°va e —12"b.g. �7CYStIIH� \a�/��i��,� a _ 97 veil I 1 1 3 BR Home#367 ,/ / Lacbjag G q Cover n 13`3" / -12"b.g. 71' / Pan /■ INi 95 LP. gxieling well 1 ■' i /in. LP. A LP. ,�1 te-��..�•�/ 93 � � er Utility V. LP. Pole dye d mum SY LV ES ER- 1g®A11)