Loading...
1352 Sewage Disposal System Sewage Disposal System for Anthony Harris 1352 Westhampton Road Northampton, MA David E. Keates, P.E. Consulting Civil Engineer 102 Russell Street Sunderland, MA 01375 Tel: 413-665-7670 Page 1 of 16 GOe4T/o,v /04P 1-zoo° ' PROJECT 4 tort/0 Y /-/s/K,e/s. /35z t-1457,/4M .'DrO.0 Ro4-.6 Uo/NA» P7-o4) NJ Sheet 2 of/L David E. Keates, P.E. Consulting Civil Engineer 102 Russell Street Sunderland, MA 01375 Tel: 413-665-7670 • =L` V N"JIL-f 't%. Hare 6'F - ')ubt 3■+1 M1+M AL' -,aOdflO. �" j�l(L P�N�\{, O M1nod rite nob1 O IVI Cab Vp 3bp (V i3O SV1i f34d Alf" rand S+NS 1V% % Ad'1b3J I CI('(9•J S-1— N • I vN1bON 9 p 3vH7rZi ' .N 9 a -Y and Lvbid Y �' 1n 3OIM SGOy N 1(�O).Y1 L. :.Y NM OIH A+c.c�07 3b■1+^..dNVH F.b LI V C� //‘ 4A, t/� nil " O lc h 95 3'N5 9£ET' ,CY_•u %�f �$ Q' 'SL I 8551 3 Li -+c-LB 5 q T Q f . , � � z 3SF-Lh-S6 c �y S M +1 00'OG/1 l ` �� 1 i}Tz ` j13lf ou �'S3 NYS LSj 3Me YV ■PYC FY Vd o r Z (51 R / V ..c- a‘ 1 � b 4 rGb�r U z W Er ^ m ° a o 3 e b N '� ° A F v) CO \./'931 . 5 L sr S.'.es 9 IP A y J a .> S / • F rE• • Z c' 3 tic 0 q )V lr BL W .1 r 6j5 '-° °'s v e V,oDe i o ;D', m) N »v e c'o 4 p CO i O >lYnU3'c) 's (\ 1� \' -Ott 9 ' Y-T �3Jnid qV SEPTIC SOLUTIONS 413-665-0444 Title 5: Draft Printed September 20, 1993 No. Appendix 4 Page 1 Name:Harris Date:3/4/96 Job#:S-967 Commonwealth of Massachusetts Northampton, Massachusetts Site Suitability Assesment for On-Site Sewage Disposal Performed By : K. Christian Boysen Witnessed By : Pete McElairn Certification Number : Nov. '94 1352 Westhapton Road Northampton, MA. 01060 Ones Nay;Alms AtlIel Donna Harris Samc 413-584-9115 New Construction: Repair — Ranw.e rise r»' Office Review 6»lta',ix,1c q 2 Af o.e.rc •• Published Soil Survey Available : ©Yes No Year Published 1967 Publication Scale 1:15 840 Soil Map Unit Drainage Class Soil Limitations Gloucester Surficial Geologic Report Available : Year Published Publication Scale Geological M&terial (Map Unit) Landform Flood Insurance Rate Map : Panel #250167 0001 A Above 500 year flood plain Within 500 year flood plain Within 100 year flood plain 12 12 Yes No No No No Wetland Area : National Wetland Inventory Map (map unit) : Wetlands Conservancy Program Map (map unit) Date: 4/3/78 Yes Yes Yes Current Water Resource Conditions (USGS) : Month Range : Above Normal Normal Below Normal Other References Reviewed : st4rat --7- 4 orJ & SEPTIC SOLUTIONS 413-665-0444 Title 5: Draft Mini Septmeber2D;;r •93 On-site Review Appendix 4 Page 2 Name:Harris Deep Hole Number : 1 Date : Time : 12:30 Weather : Rain, 40 Location (identify on site plan) 30" South of edge of pavement Land Use : woods Slope : 3'» Surface Stones : few Vegetation : Hemlocks Landform : outwash terrace Position on landscape (sketch on back) : Distance From : Open Water Body >150' Drainageway : >50' Possible Wet Area :>150 Property Line : 10' to road Drinking Water Well:>150 Other : DEEP OBSERVATION HOLE LOG Depth from Surface Soil Horizons Soil Texture Sod Color Sod Mottling Other (inches) (USDA) (Mu sell) (structure,stones,etc) 0-12 historic fill ti 12-16 1/2 A Sub none Fine sandy 10YR 3/1 - 14 1/2161/2 n -Very fine roots loam c 10YR 3/6 -Friable 30%H.C. - Stratified -Nor SsN`vT. 161/2-27 13w Fine Sandy 10YR 4/4 none -Friable Loam 27-33 Be Fine Sandy 10YR 414 none -Cobbles Loam 33-84 Cl Fine Loamy 2.5Y 4/4 46"+/440% -Very Sand massive 10YR friable 4/6 84-108 C2 Coarse Sand 10YR 4/3 30% 7.5YR -40% gravel to 416 3" 4 Parent Material (geologic) : OUT-WAS/4 Depth to Bedrock : %/0$" Depth to Groundwater : Standing Water in Hole : 67" Weeping from Pit Face: 96" Estimated Seasonal High Ground Water : 46" (91 ,4) 3.g ') SNrr<r 8 0 /c / (& SEPTIC SOLUTIONS 413-665-0444 Title 5: Draft Print Sepnneber 20, 1993 Appendix 4 Page 2 Name:Harris On-site Review Deep Hole Number : 2 Date : 3/4/96 Time : 1:00 Weather Location(identify on site plan) see topo. plan Land Use : woods Slope : 3% Vegetation : Hemlocks Landform • outwash terrace Position on landscape(sketch on back) : Distance From : Open Water Body :>150' Drainageway :>50' Possible Wet Area :>150' Property Line :20'+/- Drinking Water Well>150' Other : Rain, 40 Surface Stones : fews DEEP OBSERVATION HOLE LOG Depth from Sur (inches) • Soil Horizons Soil Texture (USDA) Soil Color (Monsen) Soil Mottling Other (structure,stone c) 0-7 A Fine Sandy 10YR3/1 none Loam 7-17 Bw Fine Sandy 10YR 4/4 none Loam 17-31 BC Loamy Sand 10YR 4/4 none 31-114 C Coarse Sand 10YR 4/3 - 49-52 layer oxides. -50% 10YR 4/6 - Friable, roots - Many roots, -15% gravel to 1" 0. -Very friable, loose single grain-40% -4otgravel to - Stratified -25% gravel to 2" 0. Parent Material (geologic) : Glacial outwash Depth to Bedrock : >114 Depth to Groundwater : 49" Standing Water in Hole : 95" Weeping from P Estimated Seasonal High GroundWater : 0"(91.6 elev) (34) Face: 96" 51-lrRC 6 or— i & SEPTIC SOLUTIONS 413-665-0444 Title 5:Draft Printed September 20, 1993 Method Used : Depth observed standing in observation hole inches. Depth weeping from side of observation hole inches. Depth to soil mottles 46 inches. Ground water adjustment feet. Appendix 4 Page 3 Name:Harris TableDetermination for Seasonal High Water Index Well Number Reading Date Index Well Level Water Level Board of Health Agent agreed to waive 5' vertical separation to water table since this is a repair. Site Suitability Assessment : ©Site Passed Additional Testing Needed : Performed By : K. Christian Boysen Certification# : Nov. 94 Witnessed By : Peter McElairq Site Failed I certify that on Nov 94 (date) I have passed the examination approved by the department of Environmental Protection an hat the above analysis has been performed by me consistent with the required traini4 ea pertisp and experience described in 310 CMR 15.018(2). ' i- ' -r 7 of )b Percolation Test Date : Time • 230 Observation Hole # 1 2 Depth of Perc. 48" + 18" Pere. test waived by Start Pre-soak 2:32 Board of Health & End Pre-soak 2:35- 25gal. in hole consulting engineer. Time at 12" of 0-F" ' n-) Time at 9" Time at 6" Time(9"-6") Rate Min./Inch 8 sec/in Board of Health Agent agreed to waive 5' vertical separation to water table since this is a repair. Site Suitability Assessment : ©Site Passed Additional Testing Needed : Performed By : K. Christian Boysen Certification# : Nov. 94 Witnessed By : Peter McElairq Site Failed I certify that on Nov 94 (date) I have passed the examination approved by the department of Environmental Protection an hat the above analysis has been performed by me consistent with the required traini4 ea pertisp and experience described in 310 CMR 15.018(2). ' i- ' -r 7 of )b Structure Design flow 5/u( Gt //O LEACHING FIELD DESIGN 64,0 Icy NOUSC wETH °FP Number of bedrooms al/day/bedroom L/ 9orFi cc Design flow X75 = E25 Garbage grinder to be used If yes, increase design flow by 50% Revised design flow * 1.5= Percolation rate Z min/inch Design rate chosen yes N O no rat/day min/inch LEACHING FIELD AREA CALCULATION From TITLE V,leaching area factor(F)= (Length) L (Width) IS • 7 ( gal/square foot ‘525 gal/day 52.5 eavday 52 5 eal/day L/7 , 3 feet 54 Y S o • 1ROJECT A)/TNpuv NAPRIS 352_ ivES/ AAl$570 %cd4D A (R A1A tiirra A I rM4 Sheet rof 16 David E. 'States, P.E. Consulting Civil Engineer 102 Russell Street Sunderland, MA 01375 Tel: 413-665-7670 Typical Septic Tank Soo 6-AL Liquid depth in septic tank D F1564 n Provide 3" air space above tees Outlet R %,� inv.elev. PLAN 4' 5' 6' 7' 8' 79, 0 Finish grade elev. Depth of outlet tee below flow line Di 1 19" 24" 29" 34" 1 ft.min.above max.observed water table CROSS SECTION Undisturbed subgrade NOTES: I. Septic tanks should be inspected at least annually and when the total depth of scum and solids exceed 1/3 the depth of the tank,the tank should be pumped. 2. Backfill around the tank shall be placed in even layers on all sides of the tank and in such a manner as to prevent damage to the tank. 3. Tanks shall he installed on a 6 in. min.layer of crushed stone leveled to grade and thoroughly compacted to the satisfaction of the Engineer. 4. Contractor shall provide a written certification that tank conforms to State and Town Board of Health specifications and regulations. / 5. Tank and cover shall he capable of withstanding 1120 loading. yes — no If no, tank shall be capable of withstanding HIO loading. 6. Inlet and outlet tees shall extend to cleanout openings and shall be constructed of cast iron, schedule 40 PVC pipe or cast in place concrete. 7. Rectangular tanks shall have a min.inside length to width ratio of no less than 1.5 to 1.0. 8. At least 3-20" dia.manholes with readily removable impermeable covers of durable material shall be provided. 9. Access ports shall be placed at the center and over each inlet and outlet tee. 10.Center access port shall be accessible within 6 in.of final grade. >ROJECT Ain HA KRIS f3SZ iJESTHAMPTak) -RoA17 N o QtH A M Fro 01 M f4- Sheet p of David E. Kates, P.E. Consulting Civil Engineer 102 Russell Street - Sunderland, MA 01375 Tel: 413-665-7670 IP 1 I nazi 5" din. outlets s'• DIA. INLETS 15 f SECTION ELEVATION rotes: 1. The minimum wall thickness for reinforced concrete shall be two inches. 2. The invert elevations of all outlets shall be equal to each other and located at least two inches below the invert elevation of the inlet. 3. Cover of distribution box to be watertight. 1. There shall be a minimum sump of six inches as measured below the outlet invert elevation. 5. The minimum inside dimension of the distribution box, regardless of material, shall be 12 inches. When the soll absorption system is to be dosed or when the slope of the inlet pipe exceeds 0.08 feet per foot, an inlet tee, baffle or splash plate extending to one inch above the outlet invert elevation shall be provided to dissipate the velocity of the influent. I. Distribution box shall be installed on a level stable base that will not settle. I. Distribution box to be placed on a 6 inch layer of compacted 3/4"-1 1/2" stone. L Distribution box outlets to be laid level for a distance of 2 feet, then sloped to leaching system. / L Distribution box shall be capable of withstanding H-20 loading. yes no DJECT 1J7NUivy t{ q %t,RIS 5z. w& T/1.4 Pro v ROAD Sheet/Q of/6 David E. Keates, P.E. Consulting Civil Engineer 102 Russell Street Sunderland, MA 01375 Tel: 413-665-7670 r Min. 2" (1/8"-1/2" ) washed stone TYPICAL LEACHING FIELD SECTION Elevation `r<T� `/-12", min. 15 FT. a d a " o a 0a 0 0 oa a � ll 30 3/4" stone 3 lines @ 5 centers width = ) 5 NOTES; 1. The grade above and adjacent to leaching field system shall slope at least 2% to prevent accumulation of water. 2. All leach lines must come directly from the distribution box. 3. Each line must be sealed into the distribution box with non-shrink mortar or thick tar. 4. To insure proper distribution,all lines must discharge equally. Testing can be done with water,prior to final inspection. p 5. The bottom.of the leaching field shall be installed level at elevation _1 5 6. Slope of distribution lines shall be 0.005 ft/ft. 7. All stone must have less than 0.2% material finer than a number 200 sieve as determined by AASHTO T-11 and T-27 (latest edition). 8. Pipe shall be constructed of either polyvinyl chloride(PVC),acrylonitrile-butadiene-styrene(ABS),or high density polyethylene(HDPE). PVC pipe shall be schedule 40 General Purpose Sewer Pipe(ASTM D 1785), schedule 40 Drain,Waste and Vent Pipe(ASTM D 2665)or SDR 35 PVC Gravity Sewer Pipe and Drain Pipe (ASTM D 3034). ABS pipe sAal(be schedule 40(ASTM F 628). HDPE pipe shall meet or exceed ASTM F 810 for Smoothwall PolyetbylenePipe for use in Drainage and Waste Disposal Fields. 9. All system components shall be installed in accordance with TITLE V of the state sanitary code and any applicable local rules and regulations. 10. Any change to this plan must be approved by the Board of Health and the Engineer. 11. The sewage disposal system shall not be backfilled prior to inspection and approval by the Board of Health and/or the Design Engineer. 12. Any conditions encountered during construction differing from those shown on the plans shall be reported to the design engineer before construction continues. 13. No permanent structure shall be constructed over the 100% expansion area. 14. Heavy equipment shall not be permitted to pass over the leaching area. 3o" ROJECT A Airs/oVy hlARQ /S /357 IA/ &STN/14/ PTo, Pc/lb uotP,4,y.r1 Pro a/ , M4• • Sheet // of/ David E. fiestas, P.E. Consulting Civil Engineer 102 Russell Street Sunderland, MA 01375 Tel:413-665-7670 c — N "Top ofI/. YOUno/ahoo e/ev. -TE is) %;....../Tre ▪ c -v• T I' -, r ' -. . 2 SECT/mm t- `� „ Leachn9 ,T 5-/2" /Tiff i. f_24, L C 2- 7o .. I� L.. . _ D box Field } ' Y-. ,0 97 _ � f h , 97.35 71 , 11 ,—� f . � � Q I _-- I II /. C . �J J �q1_�� �f 2 7.2 c Precasi contr.-12'4C vv. S o Q 1 “ n Septic 'Tank /600 GAL v. /ov. 46.2 In 97.0 p / 6075ton, fic7c/- city.95•y NU95. I/ L. o n Nor'5: I. THE LZ ADE ACovE ANO 40740 ENT To LEAC/l/NG FIELD SHALL SLOPE AT m ¢ 2E457' 2. o Y TO Pr{FvaNT ACCLh UL4TlcN OF SURFACE WATER. ti g c F 2. LEACHING FIELD D/STR/OuTlotv P/PE SHALL HA: 'F A M/N SLOPE of aoo5 4. a o 2 g o I CA 3. THE I5orrOM OF EACH LEACHING FIELD SA-7LL GE LEVEE • i c n m I C 1 IL PIPE FRi-j Four/DAT/ON WALL To SEPTIC YANK SHALL as SCHEDULE HO• ▪ Y Pvc OR EQUI v ALE NT AND HAVE A MIN. GRADE of I/, /' PER Fr; ▪ tr. mn n i �' r < w O. PIPC- rROA , SEPTIC 'TANK re) "D” 6oN SHALL GE .SCHEDULE Flo Fivc.: Y c' < > o x r r ± OR _ Qc/L'ALENT 4 h'D NAVE' A .A9/N. GRAOE of Vs' PER FT. .n C V+ N m -I z ' 6. ALL- Pip/ v6 Yo 3e' 4 DIA . c .; n .. N G V 2 PI m •• a C o N La C. / T:P 77 C S Y.J E: A'? L-3A'r ).:7 Z. f.._ , _U\ �:N 7m] in _ -. o L ? z `" 3 aa - - (IlLN CJTn Di W i 5i - - = � - 1 _ r ROJEC 4 A/71 ONV //APEK sz ±vF 7EAMProti (amp 4)0P74AA )PTON M4 DAVID E. REATES, P.E. CONSULTING CIVIL ENGINEER 102 RUSSELL STREET SUNDERLAND, MASSACHUSETTS 01375 Tel. 413-665-7670 .c .9 D - -A:::: : : C.__ la _ 11 O ROJECT 'n4oAY f4AQRIS Ise v srllAm?frou ROA.A Vot7NAM PTO A), M 4 DAVID E. REATES, P.E. CONSULTING CIVIL ENGINEER 102 RUSSELL STREET SUNDERLAND, MASSACHUSETTS 01375 Tel. 413-665-7670 ROJECT 4w7NDNY w eRiS 3SZ wES771A41P70A1 RaAA NthP'r/AM 77V N / M 4 DAVID E. REATES, P.E. CONSULTING CIVIL ENGINEER 102 RUSSELL STREET SUNDERLAND, MASSACHUSETTS 01375 Tel. 413-665-7670 PROPOSED DOMESTIC SUBSURFACE SYSTEM DESIGN Prepared Location: For: JOB i F-20261 DATE: 8- T9 -90 DESIGNED BY: /} 31, /1-/A Et 90,71e- ovt c 6 6 , L.7 'a3 , MORn, 4A.proy Number of Bedrooms: 3 Garbage Disposal: YES LEACH AREA DESIGN 3 Bedrooms x 2 persons/bedroom - 6 persons (o Persons x 55 gallons of wastewater/person/day - 33 0 total gallons of wastewater/day. X I. 6- .r pet MortrNA.tproM REGS. = 49S- C-PD Percolation Rate: 2. 0 min./inch Gallon of wastewater/square feet of leach area for a Percolation Rate of: 2 .0 min./inch = 2. S Gal./S.F. sidewall area 1 . 0 Gal./S.F. bottom area * If a leach bed is to be installed, no sidewall is allowed. * If a percolation rate exceeds 20 min./inch, no bottom area is allowed. SEPTIC TANK * WITHOUT GARBAGE DISPOSAL: Gallons of wastewater/day x 1502 - liquid capacity of septic tank. RECOMMENDED: Septic Tank REQUIRED effective * In no case will the septic tank be less than 1,000 gallons (effective liquid capacity). ** WITH GARBAGE DISPOSAL: 49,f Gallons of wastewater/day. x 2005 - 9 9 O REQUIRED effective liquid capacity of septic tank. RECOMMENDED: I SOO Septic Tank ** In no case will the septic tank be less than 1,500 gallons (effective liquid capacity). ALMER HUNTLEY,JR., & ASSOCIATES INC. SURVEYORS - ENGINEERS - LANDSCAPE ARCHITECTS LEACHING FIELD DESIGN JOB #: P-2aaq DATE: 8 - 2q -go DESIGNED BY: /} !y, USING BOTTOM AREA ONLY: Q 9 C Gallons (Total Daily Flow) L. gal./S.F. -•Q 9 S.F. Leaching Field (REQUIRED) * With Garbage Disposal: S.F. Leaching Field x 1.5 - S.F. Leaching Field (REQUIRED) 7S-0 S.F. Leaching Field (Designed): 30 ' long x R C ' wide LEACHING TRENCH DESIGN SIDEWALL AREA: Gal./S.F. x ' of effective depth x 1' length x 2 sides - Gal./L.F. of trench (sidewall). BOTTOM AREA: Gal./S.F. x ' wide x 1' length - Gal./L.F. of trench (bottom). Total of Gal./day (flow) * With Garbage Disposal: Gal./L.F. (sidewall) Gal./L.F. (bottom) TOTAL Gal./L.F. of trench Total Gal./day/L.F. - L.P. of trench (REQUIRED) L.F. of trench x 1.5 - L.F. of trench (REQUIRED) L.P. of trench (Designed): - trenches, ' wide x ' long with ' effective depth. ALMER HUNTLEY,JR., & ASSOCIATES, INC. SURVEYORS • ENGINEERS -LANDSCAPE ARCHITECTS V.,..PtVI III•V I ,V.VV SEPTIC TANK DISTRIBUTION BOX TO BE SET LEVEL SUMP TO BE 6" SEWER PIPE-SIZE AS NOTED ON PLAN, ALL JOINTS TO BE WATERTIGHT SLOPE • V6"/FT. (MIN.! HEADER PIPES FROM THE DIS- TRIBUTION BOX TO BE NON- PERFORATED AND LAD LEVEL FOR AT LEAST ONE LENGTH 1 OF PIPE PLAN VIEW J 2% FINISH GRADE IA (MIN.( -( t) LISTIyy '.-4" PERFORATED PIPE - SLOPE • 0.005'/FT NG /a�rn r ,...- /nwii n//�\v #P��e EXISTING GROUND �/ BOTTOM OF FIELD TO BE HORIZONTAL 2% FINISH GRADE (MIN.) V6" TO 1/4 CRUSHED STONE .-4' MW. TO GROUND WATER OR IMPERVIOUS LAYER SIDE VIEW 12" COVER (MN.) i_ _ I" MIN A (6' MAX.) ALL WORK TO BE DONE IN ACCORDANCE WITH THE STATE ENVIRON- MENTAL CODE, TITLE 5 4" DIA. PERFORATED PIPE 6" MN. EFFECTIVE DEPTH SECTION X-X ALMER HUNTLEY, JR. & ASSOCIATES, INC. LAND SURVEYORS-PROFESSIONAL ENGINEERS-LANDSCAPE ARCHITECTS 30 INDUSTRIAL DRIVE EAST NORTHAMPTON, MA. SEPTIC SOLUTIONS 413-665-0444 Title 5: Drali Printed September 20. 1993 No. Appendix 4 Page 1 Name:Harris Date :3/4/96 Job#:S-967 •:;Commonwealth of Massachusetts Northampton, Massachusetts Site Suitability Assesment for On-Site Sewage Disposal Performed By : K. Christian Boysen Witnessed By : Pete McElairn 1352 Westhapton Road Northampton,MA. 010611 Certification Number : Nov. '94 as wild.I Donna rlarris Same 413-584-9115 New Construction: Office Review Published Soil Survey Available : ©Yes Year Published 1967 Publication Scale 1:15 840 Drainage Class Soil Limitations Surficial Geologic Report Available : Yes Year Published Publication Scale Geological Material (Map Unit) Landform Repair — /Z4'wri* at le r^' y 6c A4 iS Cj2IND ! rt . Flood Insurance Rate Map : Panel #250167 0001 A Above 500 year flood plain No Within 500 year flood plain ©No Within 100 year flood plain 13 No No Soil Map Unit Gloucester No Date: 4/3/78 Yes Yes Yes 13 Wetland Area : National Wetland Inventory Map (map unit) : Wetlands Conservancy Program Map (map unit) : Current Water Resource Conditions (USGS) : Month Range : Above Normal Normal Below Normal Other References Reviewed : 514tsre-7' .4 or- / % SEPTIC SOLUTIONS 413-665-0444 Tide 5:Drof7 Print Seponebe, 2.9, 1993 On-site Review Deep Hole Number : 2 Date : 3/4/96 Time : 1:00 Location(identify on site plan) see topo. plan Land Use :woods Slope : 3% Vegetation : Hemlocks Landform : outwash terrace Position on landscape (sketch on back) : Distance From : Open Water Body :>150' Drainageway :>50' Possible Wet Area :>150' Property Line :20'+/- Drinking Water Well:>150' Other : Appendix 4 Page 2 Name:Harris Weather: Rain, 40 Surface Stones : fews DEEP OBSERVATION HOLE LOG Depth from Surface Soil ilorimns Soil Texture (inches) (USDA) Soil Color (Mansell) Soil Mottling other (structure.stone,etc) 0-7 7-17 A Fine Sandy 10YR3/1 none Loam Hw Fine Sandy 10YR 4/4 none Loam 17-31 DC Loamy Sand 10YR 4/4 none 31-114 C Coarse Sand 10YR 4/3 - 49-52 layer oxides. -50% 10YR 4/6 - Friable, roots - Many roots, -15% gravel to -Very friable, loose single graiWO -40£gravel to 2" 0. - Stratified - 25% gravel to 2" 0. Parent Material (geologic) : Glacial outwash Depth to Bedrock : >114 Depth to Groundwater : 49" Standing Water in Hole : 95" Weeping from Pit Face: 96" Estimated Seasonal High GroundWater : 49"(91.6 elev) 3.$) �14rar 6 or- /6 SEPTIC SOLUTIONS 413-665-0444 Title 5: Draft Print Sep/metier 20, 1993 On-site Review Appendix 4 Page 2 Name:Harris Deep Hole Number : 1 Date : Time : 12:30 Weather : Rain, 40 Location (identify on site plan) 30" South of edge of pavement Land Use : woods Slope : 3% Surface Stones : few Vegetation : Hemlocks Landform : outwash terrace Position on landscape (sketch on back) : Distance From :, Open Water Body :>150' Drainageway : >50' Possible Wet Area :>150 Property Line : 10' to road Drinldn• Water Well:>150 Other : DEEP OBSERVATION HOLE LOG Depth from Surac (inches) 0-12 Soil I loon:Ins Soil I extort (USDA) Soil Color Soil Mottling Other (Monet) (structure,stones,etc) 12-16 1/2 16 1/2-27 historic fill A Sub none Fine sandy 10YR 3/I - 14 1/2-16 1/211 -Very fine roots loam a IOYR3/6 -Friable 30% H.C. - Stratified - &fox EtiIWWT. Bw Fine Sandy 10YR 4/4 none -Friable Loam 27-33 Bc Fine Sandy 10YR 4/4 Loam 33-84 Cl Fine Loamy 2.5Y 4/4 Sand 84-108 C2 Coarse Sand 10YR 4/3 none -Cobbles 46"+/_40% -Very massive 10YR friable 4/6 30% 7.5YR -40% gravel to 4/6 3" et Parent Material (geologic) : ourwASH Depth to Groundwater : Standing Water in Hole : 67" Estimated Seasonal High Ground Water : 46" (9 I .4) 3.8') Depth to Bedrock : 7/og't Weeping from Pit Face* 96" 75, L; SNrr< f 6 oft / 6 SEPTIC SOLUTIONS 413-665-0444 Tide 5 : Draft Pr'!Wed September 20, 1993 Appendix 4 Page 3 Name:Harris TableDeterminalion for Seasonal 111211 Water Method Used : Depth observed standing in observation hole inches. Depth weeping from side of observation hole inches. ® Depth to soil mottles 46 inches. Ground water adjustment feet. Index Well Number Reading Date Index Well Level round Water Level Board of Health Agent agreed to waive 5' vertical separation to water table since this is a repair. Site Suitability Assessment : Site Passed Additional Testing Needed : Performed By : K. Christian Boysen Certification ft : Nov. 94 Witnessed By : Peter McEleirn Site Failed I certify that on Nov 94 (date) I have passed the examination approved by the department of Environmental Prgtection hat the above analysis has been performed by me consistent with the iegdtfed trainiri:,.- ,pertii e, and experience described in 310 CMR 15.018(2). = �jµn_rcr 7 01 110 Percolation Test Date : Time : 2:30 Observation Hole k 1 2 Depth of Pere. 48" + 18" Pere. test waived by Start Pre-soak 2:32 Board of Health & End Pre-soak 2:35- 25gal. in hole consulting engineer. Time at 12" Cft'r'Pn tit-) Time at 9" Time at 6" Time (9"-6") Rate Min./Inch 8 sec/in Board of Health Agent agreed to waive 5' vertical separation to water table since this is a repair. Site Suitability Assessment : Site Passed Additional Testing Needed : Performed By : K. Christian Boysen Certification ft : Nov. 94 Witnessed By : Peter McEleirn Site Failed I certify that on Nov 94 (date) I have passed the examination approved by the department of Environmental Prgtection hat the above analysis has been performed by me consistent with the iegdtfed trainiri:,.- ,pertii e, and experience described in 310 CMR 15.018(2). = �jµn_rcr 7 01 110