Loading...
1370 On Site Review 1998 On-Site Review or LocEngineering sFirmot# E ItS Owner lr- �C Address r -°: .- �. Date S I� ` 'd / me Weather r ,, gineer or Sanitarian Engineer fl Identity on Site Plan l t-, Jai u Land Use Slope% Surface Stones Vegetation f. x .,1% Landform t Position on Landscape u •_ t Distances from Gnu. Open Water Body IL°Lt Possible Wet Area feet feet Drinking Water Well Drainage Way 1[U feet !n. O feet Property Line Other r iiII Deep Hole U. Depth from Surface(inches) DEEP OBSERVATION HOLE LOG* *MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA So+i Horton Soil Texture USDA) Soil Color (Monsen' Soil Mottling lit' `,11(.6 Other Strccture. Stones Boulders.Consistency %G� i Parent Material(geologic) i Depth to groundwater. Standing Water in the Hole Estimated Seasonal High Ground Water Depth to Bedrock 1 Weeping from Pit Face 1 li Deep Hole#: DEEP OBSERVATION HOLE LOG* *MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Depth from Soil Horizon Surface:Inches' 1 Soil Texture USDA' Soil Color Soil Mottling (Monsell) Other !Structure Stones. Boulders. Consistency 'oC Parent Material(geologic) 1 Depth to groundwater. Standing Water in the Hole :intimated Season!High Ground Water Depth to Bedrock Weeping from Pit Face I 3 7 0 A2 ell z ;--Y ilia. 1 PERCOLATION TEST(S) Time: I 1 PERCOLATION TEST(S) Time: I I Time: Observation Hole # #1 O Observation Hole # #2 Depth of Perc D Depth of Perc Start Pre-soak i S i End Pre-soak 4 4 E End Pre-soak Time at 12" G G T Time at 12" Time at 9" T Time at 9" Time at 6" I I ( (, T l Time at 6" Time (9"-6") - - T Time (9"-6") Rate Min./Inch R Rate Min./Inch *minimum of 1 pe folalion test must be performed in both the primary area AND reserve area Oa 1-21 y 1U-€* U Performed by Witnessed by Performed by Witnessed by Comments. wn�