Loading...
1175 On Site Review 1996 FORM 12-PERCOLATION TEST Location Address or Lot No. COMMONWEALTH OF MASSACHUSETTS ,Massachusetts Percolation Test Time Observation Hole/ Depthol Pere Start Pre-soak L (.; End Re-soak r at 12- T at 9- Time at 6- Time(9•-6.1 _ Rate Min./Inch •Minimum of 1 predation teat most be performed in both the primary area AND reserve area. Site Passed L� Site Failed ❑ ' Performed fly: titit4r tY c Witnessed By f 2 - Comments: 017.4MCanrm.rarer . 0 ltbn Addressor Lot# I ) I y +- -- y k-.� —2-2,it Hole Number I I Date ~ (, y 1 I Time I ! S I Weather I _`. .ocation(identify on site plan) Sod Texture USDA Land Use rg- Slope(%) I _- 'I Surface Stones Vegetation C , Landform 3 on on Landscape(sketch on the back) Distance from: .. en Water Body /p� ' ""- feet Drinkinq Water Well N/c feet Property Line -. feet ;sible Wet Area — feet Drainage Way L -- feet Other feel DEEP OBSERVATION HOLE LOG* Hole#: DEEP OBSERVATION HOLE LOG' —•..• minimum Ut inu MULts mtuudbDAL EVERT PROPOSED DISPOSAL AREA h from (Inches) iN from Intlnee Soil Modica Sod Texture USDA Soil Cdor _ Muree Sod Moo • Other _ structure,Stones,Boulders.Consis> •%Ga . 1 C , I 3 l 1IMahNI .....Ic r-.Ih to Bedrock 0-•N b•mundwater. Stndi •Water in the HOk Wee.' •from Pit Face Inallill EsNnated Season al H'•h found Water DEEP OBSERVATION HOLE LOG' —•..• minimum Ut inu MULts mtuudbDAL EVERT PROPOSED DISPOSAL AREA h from (Inches) Sod Horizon Sol Texture (USDA) Sod Cobr (Mmsed) Sod Wang Other (swcure.Stones,Boulders.Consistency.%Gave 1 C , I Ma (geologic) I J Deptlnb Bedrock bah to groundwater Standing Wales in the Hole /r!"- > I Weeping from Pd Face I Estimated Seasonal High Ground Water / A�rrE T7JS� r4 GER TLF: •thaAL�e /tt'l5by� �'i MMON!N!€ LTH OF MASSACHUSETTS aw / - MASSACHUSETTS Qlertifi ttte of Clmnplittnre / ,,,���----4e e g e D' posal System installed II r/epaire r aced V 'n �� ��f y for installed /r 9v. �1 � � Q � at - '"" h ewnstructed in accor4ance with therprovi$Lyrla of Title 5 and the for Disposal System Construction Permit No. dated 17777 V Use of this system is conditioned on compliance with the provisions set forth below: The issuance of this certificate shall ntcb(�gL@sf Certificate expires o r / ((it) DATE guarantee that sys em will fu as desi ed. This ,E- ▪ E Co N sill; - C ttO P414. u c agI F o C b 3 rim permission is hereby gr§k99ted '431t3ectestruct ( ) or repair( A)an ▪ mW m 77 Inspector THECOM►1PNWEALTIH OF MASSACHUSETTS !!x`..``1111767 ilk 77'"// f MASSACHUSETTS FEE spzi st e ions nrtfnn ennit /r<(1 ( / // 7.5 to l On-site Sewage System located at ld s described in the above Application for Disposal System Construction Permit. The applicant recognizes his/her • tMtto comply with Title 5 and the following local provisions or special conditions. o a ma-> Vr bnstructionrusf be comp fetertwithin two years of the date below. DATE // Gi Approved by FORM 1255 Fey.3/95 n M.SULKIN CO.•BOSTON.NA