Loading...
840 Municipal Water Availability MUNICIPAL WATER AVAILABILITY AP Northampton Water Departmen 237 Prospect St. Northampton, MA 01060 587-1098 SEP 10 2003 A Department of Public Works Trench Permit sh prior to any construction or connection activity associat G NSP0EC0T6ION 060 required Location: 840 Westhampton Road Inquiry Made By: Bill Noel, Project Coordinator, Habitiat Date of Inquiry: June 10, 2003 Municipal Water Main in Front of Location: Yes X No Size of Water Main: 8" Material: Cast Iron Age: 1930 Approximate Street Pressure: 60 PSI Size of Service Connection: 1" Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320 feet. Issued for the construction of a single dwelling on the property only A corresponding "water entrance fee" shall be paid prior to making any connection to the municipal water system. Arrangements of such installation shall be made with the Northampton Water Department with a minimum of 5 working days notification. All work shall conform to n Water Depart specifications. C L Cha es Borowski, Superintendent of Water cc: Ned Huntley, Asst. City Engineer Anthony Patillo, Building Inspector MEMORANDUM TO: Mark NeJame, Chair, Zoning Board of Appeals FR: Ned Huntley, Assistant City Engineer,Department of Public Works DA: January 23, 2003 RE: File #03-CP-42,Comprehensive Cluster—Westhampton Road Map 42/Parcel 60 CC: file The Department of Public Works has reviewed the above referenced application for the following items: Traffic: Utilities: x Volume&Impact on City Street x Drainage Into City Stormwater System x Roadway Capacity _Capacity of Stormwater Line x Adequacy of City Road Construction _ Sanitary Sewer x Site Distances x Water x Parking Other: x Driveway Openings The Department of Public Works has the following comments: No Concerns, project will not have an impact on any items reviewed Traffic Study is required Roadway does not have adequate capacity to handle the additional traffic Roadway is not adequately constructed to handle proposed increase in traffic Site Distances are not adequate for proposed project Parking spaces do not meet minimum requirements Parking spaces are too close to driveway opening x Driveway openings are not adequate for proposed use— Cannot determine based upon information submitted x City stormwater system is not adequate to handle increase in drainage—no information submitted addressing this issue. x Stormwater system does not meet minimum requirements for reduction of Total Suspended Solids(TSS) -no information submitted addressing this issue. Sanitary Sewer line is not adequately sized for proposed use Sewer line connection is not properly shown x Water line is not adequately sized for proposed use-no information submitted addressing this issue. x Water line connection is not properly shown-no information submitted addressing this issue. Comments continue on the next page. x Other Comments: • No grading plan was submitted to determine how or what impact drainage and/or grading will have on City Road. • No Stormwater management plan was submitted. • No information was submitted regarding the construction of the pedestrian foot-path,ownership or maintenance responsibilities. • Water pressure in this area is low during peak demand periods.DPW cannot guarantee adequate pressure for all units. • One meter will be installed for each building.If occupants choose,a private meter may be installed after the City's meter,to determine use by accessory units. All driveways will require pavement/curb cut permits from the DPW,complete with details on the raidii. Permit states that the development will have 3 affordable units and three accessory apartments attached.Additionally,there will be I flag lot and 1 regular lot.No information for these lots were included in the permit.Grading of driveways and their locations need to be submitted to the DPW to determine what,if any impacts will exist. MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St. Northampton, MA 01060 587-1098 A Department of Public Works Trench Permit shall be required prior to any construction or connection activity associated with this application. Location: 840 Westhampton Road Unit B Inquiry Made By: Date of Inquiry: Municipal Water Main in Front of Location? Size of Water Main: M.J. Adams, Habitat for Humanity 413-586-5430 01-21-04 Yes: X No: Material: Number of Units: Type of Unit(s): Approximate Static Street Pressure: Size of Service Connection: 1" Existing service to site? Cast Iron Yes: No: Age: 1930 Single Family Accessory Apart. Multi-family Type of Ownership: Private Condo Rental 60 Flow Test Conducted : Yes: No: If done attach results Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320 feet. A corresponding water entrance fee shall be paid prior to making any connection to the municipal water system. Arrangements of such installation shall be made with the Northampton Water Department with a minimum of 5 working days notification. All work shall conform to Northampton Water Department specifications. /'h David W. Sparks, Acting Superintendent of Water Ned Huntley, Asst. City Engineer MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St. Northampton, MA 01060 587-1098 A Peoaf'trntIj{of H tic Works Trench Permit shall be required prior to any construction or connection activity associated with this application. L`��oSc CiliaS lee a`iot= 840 Westhampton Road Unit C Inquiry Made By: Date of Inquiry: Municipal Water Main in Front of Location? Size of Water Main: M.J. Adams,Habitat for Humanity 413-586-5430 01-21-04 Yes: X No: Existing se site? cc to Material: Cast Iron Yes: No: Age: 1930 Number of Units: Type of Unit(s): Single Family Accessory Apart. Multi-family Approximate Static Street 60 Pressure: Size of Service Connection: Type of Private Ownership: Condo Rental Flow Test Conducted : Yes: No: If done attach results Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320 feet. • A corresponding water entrance fee shall be paid prior to making any connection to the municipal water system. • Arrangements of such installation shall he made with the Northampton Water Department with a minimum of 5 working days notification. • All work shall conform to Northampton Water Department specifications. 41c- David W. Sparks, Acting Superintendent of Water cc: Ned Huntley, Asst. City Engineer