840 Municipal Water Availability MUNICIPAL WATER AVAILABILITY AP
Northampton Water Departmen
237 Prospect St.
Northampton, MA 01060
587-1098
SEP 10 2003
A Department of Public Works Trench Permit sh
prior to any construction or connection activity associat
G NSP0EC0T6ION 060
required
Location: 840 Westhampton Road
Inquiry Made By: Bill Noel, Project Coordinator, Habitiat
Date of Inquiry: June 10, 2003
Municipal Water Main in Front of Location: Yes X No
Size of Water Main: 8" Material: Cast Iron Age: 1930
Approximate Street Pressure: 60 PSI
Size of Service Connection: 1"
Comments: The Water Department cannot guarantee adequate water pressure during peak
demand times at elevations above 320 feet. Issued for the construction of a single dwelling
on the property only
A corresponding "water entrance fee" shall be paid prior to making any connection to the
municipal water system. Arrangements of such installation shall be made with the Northampton
Water Department with a minimum of 5 working days notification. All work shall conform to
n Water Depart specifications.
C L
Cha es Borowski,
Superintendent of Water
cc: Ned Huntley, Asst. City Engineer
Anthony Patillo, Building Inspector
MEMORANDUM
TO: Mark NeJame, Chair, Zoning Board of Appeals
FR: Ned Huntley, Assistant City Engineer,Department of Public Works
DA: January 23, 2003
RE: File #03-CP-42,Comprehensive Cluster—Westhampton Road Map 42/Parcel 60
CC: file
The Department of Public Works has reviewed the above referenced application for the following items:
Traffic: Utilities:
x Volume&Impact on City Street x Drainage Into City Stormwater System
x Roadway Capacity _Capacity of Stormwater Line
x Adequacy of City Road Construction _ Sanitary Sewer
x Site Distances x Water
x Parking Other:
x Driveway Openings
The Department of Public Works has the following comments:
No Concerns, project will not have an impact on any items reviewed
Traffic Study is required
Roadway does not have adequate capacity to handle the additional traffic
Roadway is not adequately constructed to handle proposed increase in traffic
Site Distances are not adequate for proposed project
Parking spaces do not meet minimum requirements
Parking spaces are too close to driveway opening
x Driveway openings are not adequate for proposed use— Cannot determine based upon
information submitted
x City stormwater system is not adequate to handle increase in drainage—no information
submitted addressing this issue.
x Stormwater system does not meet minimum requirements for reduction of Total
Suspended Solids(TSS) -no information submitted addressing this issue.
Sanitary Sewer line is not adequately sized for proposed use
Sewer line connection is not properly shown
x Water line is not adequately sized for proposed use-no information submitted addressing
this issue.
x Water line connection is not properly shown-no information submitted addressing this issue.
Comments continue on the next page.
x Other Comments:
• No grading plan was submitted to determine how or what impact drainage and/or grading will
have on City Road.
• No Stormwater management plan was submitted.
• No information was submitted regarding the construction of the pedestrian foot-path,ownership
or maintenance responsibilities.
• Water pressure in this area is low during peak demand periods.DPW cannot guarantee
adequate pressure for all units.
• One meter will be installed for each building.If occupants choose,a private meter may be
installed after the City's meter,to determine use by accessory units.
All driveways will require pavement/curb cut permits from the DPW,complete with details on
the raidii.
Permit states that the development will have 3 affordable units and three accessory apartments
attached.Additionally,there will be I flag lot and 1 regular lot.No information for these lots
were included in the permit.Grading of driveways and their locations need to be submitted to
the DPW to determine what,if any impacts will exist.
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department
237 Prospect St.
Northampton, MA 01060
587-1098
A Department of Public Works Trench Permit shall be required prior to any construction or
connection activity associated with this application.
Location: 840 Westhampton Road Unit B
Inquiry Made By:
Date of Inquiry:
Municipal Water Main
in
Front of Location?
Size of Water Main:
M.J. Adams, Habitat for Humanity 413-586-5430
01-21-04
Yes: X No:
Material:
Number of
Units:
Type of
Unit(s):
Approximate Static Street
Pressure:
Size of Service Connection: 1"
Existing service to
site?
Cast Iron
Yes: No:
Age: 1930
Single Family
Accessory Apart.
Multi-family
Type of
Ownership:
Private
Condo
Rental
60
Flow Test Conducted : Yes: No:
If done attach results
Comments: The Water Department cannot guarantee adequate water pressure during peak demand
times at elevations above 320 feet.
A corresponding water entrance fee shall be paid prior to making any connection to the municipal water
system.
Arrangements of such installation shall be made with the Northampton Water Department with a minimum
of 5 working days notification.
All work shall conform to Northampton Water Department specifications.
/'h
David W. Sparks, Acting Superintendent of Water
Ned Huntley, Asst. City Engineer
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department
237 Prospect St.
Northampton, MA 01060
587-1098
A Peoaf'trntIj{of H tic Works Trench Permit shall be required prior to any construction or
connection activity associated with this application.
L`��oSc CiliaS
lee a`iot=
840 Westhampton Road Unit C
Inquiry Made By:
Date of Inquiry:
Municipal Water Main
in
Front of Location?
Size of Water Main:
M.J. Adams,Habitat for Humanity 413-586-5430
01-21-04
Yes: X No:
Existing se
site?
cc to
Material: Cast Iron
Yes: No:
Age: 1930
Number of
Units:
Type of
Unit(s):
Single Family
Accessory Apart.
Multi-family
Approximate Static Street 60
Pressure:
Size of Service Connection:
Type of Private
Ownership: Condo
Rental
Flow Test Conducted : Yes: No:
If done attach results
Comments: The Water Department cannot guarantee adequate water pressure during peak demand
times at elevations above 320 feet.
• A corresponding water entrance fee shall be paid prior to making any connection to the municipal water
system.
• Arrangements of such installation shall he made with the Northampton Water Department with a minimum
of 5 working days notification.
• All work shall conform to Northampton Water Department specifications.
41c-
David W. Sparks, Acting Superintendent of Water
cc: Ned Huntley, Asst. City Engineer