October 13, 2008
Mr. Peter McErlain, Acting Health Agent
Board of Health
City Hall
Northampton MA 01060
RE:Septic System Repair Design, Local Variance Required
Sheldon Property, Map 42 Block 45 Parcel 1 653 Westhampton Road
Dear Mr. McErlain:
A variance from the local Sanitary/Septic Bylaw is requested for the abovementioned
septic system. Specifically, a waiver to the City required design for a garbage disposal is
requested. A deed demarcation for this limitation can be made if needed.
This request is prompted by space limitations on the lot(25,000 SF).
As such, It is my opinion that given all the possible scenarios for a new disposal system,
this best meets the intent of the Sanitary Code (310 CMR 15.00). It is our opinion that
strict enforcement of the local code would do manifest injustice and that the same
degree of environmental protection is achieved here in Please see the proposed plans
attached (3 copies), permit forms and appropriate fees and
Sincerely,
Cold Spring Environmental Consultants, Inc.
AY an E. Weiss, M.S, R.S.
President
Principal Hydrogeologist
Registered Sanitarian License #933
Cc: Owner,
350 Old Enfield Road •Belchertown,MA.01007•Phone:413.323.5957 Fax 413.3214916
email:aeweiss @chartecnet
Mwstiptions
Ice bl".11g2tilinC
Remcdiation
;Ulf
COLD SPRING ENVIRONMENTAL
CONSULTANTS INC.
SeptichwvOpthnis
November 5, 2008
Northampton Board of Health
461
• Percolation Tests
• Septic Designs
• Rtgulatory Compliance
• Recycling and Solid Waste
• Second Opinions
RE:Septic System Repair Installation Inspection
# (653) Westhampton Road (Sheldon.)
On this date, the writer inspected the installation of a Septic
Tank& Leach chamber. The writer found the installation to be
complete (except for completion of cover material and final fill)
and in compliance with our plans and 310 CMR 15.000. The
installer representative (Earls Excavating) . Our inspection noted
that the system was built properly, in accordance with the state
regulations and our plans. The contractor was requested to have
sufficient breakout soil on site and properly cover the system
according to our plans and may backfill the system after review
by local Health Department representatives.
Sincerely,
Col Spring Environmental Consultants, Inc.
A an E. Weiss, M.S. , L.S. P.
President
Principal Hydrogeologist
Licensed Site Professional #6442
Registered Sanitarian #933