Loading...
653 Letters COLD SPRING ENVIRONMENTAL CONSULTANTS INC. e Investigations • Percolation Tests lace Investigations • Septic Designs on Remediation • Regulatory Compliance Stall • Recycling and Solid Waste is Septic Investigations • Second Opinions October 13, 2008 Mr. Peter McErlain, Acting Health Agent Board of Health City Hall Northampton MA 01060 RE:Septic System Repair Design, Local Variance Required Sheldon Property, Map 42 Block 45 Parcel 1 653 Westhampton Road Dear Mr. McErlain: A variance from the local Sanitary/Septic Bylaw is requested for the abovementioned septic system. Specifically, a waiver to the City required design for a garbage disposal is requested. A deed demarcation for this limitation can be made if needed. This request is prompted by space limitations on the lot(25,000 SF). As such, It is my opinion that given all the possible scenarios for a new disposal system, this best meets the intent of the Sanitary Code (310 CMR 15.00). It is our opinion that strict enforcement of the local code would do manifest injustice and that the same degree of environmental protection is achieved here in Please see the proposed plans attached (3 copies), permit forms and appropriate fees and Sincerely, Cold Spring Environmental Consultants, Inc. AY an E. Weiss, M.S, R.S. President Principal Hydrogeologist Registered Sanitarian License #933 Cc: Owner, 350 Old Enfield Road •Belchertown,MA.01007•Phone:413.323.5957 Fax 413.3214916 email:aeweiss @chartecnet Mwstiptions Ice bl".11g2tilinC Remcdiation ;Ulf COLD SPRING ENVIRONMENTAL CONSULTANTS INC. SeptichwvOpthnis November 5, 2008 Northampton Board of Health 461 • Percolation Tests • Septic Designs • Rtgulatory Compliance • Recycling and Solid Waste • Second Opinions RE:Septic System Repair Installation Inspection # (653) Westhampton Road (Sheldon.) On this date, the writer inspected the installation of a Septic Tank& Leach chamber. The writer found the installation to be complete (except for completion of cover material and final fill) and in compliance with our plans and 310 CMR 15.000. The installer representative (Earls Excavating) . Our inspection noted that the system was built properly, in accordance with the state regulations and our plans. The contractor was requested to have sufficient breakout soil on site and properly cover the system according to our plans and may backfill the system after review by local Health Department representatives. Sincerely, Col Spring Environmental Consultants, Inc. A an E. Weiss, M.S. , L.S. P. President Principal Hydrogeologist Licensed Site Professional #6442 Registered Sanitarian #933 CcM4awEnothummW 350(AdEnfieldWed 13eMwWw6Ma01007 413-323-5957,phone 413-3234916,fax 350 Old Enfield Road Belchertown,MA.01007 Phone:413.323.5957 Fax 411323.4916 rmaiI aeweiss@charter.net