62 Asbestos 2015 L7Cart/170a
ATC
Shaping the Future
June 24,2015
Western Mass Environmental
Ann: Ray Marciniak
93 Wayside Ave.
West Springfield, MA 01089
RE: Asbestos Bulk Sampling and Abatement Monitodng Report
62 West Street. Northampton
Cardno ATC Project No.183WME1507
Dear Mr. Marciniak,
Cardno ATC was contracted by Western Mass Environmental to collect bulk samples of suspect asbestos
containing materials from the basement of the above referenced building in Northampton, MA. The suspect
asbestos-containing materials which included thermal system insulation debris and other suspect materials
were observed to be present on the basement floor and mixed with household items. Pipe insulation which
was observed on pipes was in poor condition. Ms.Lee Musante,a Massachusetts licensed asbestos
inspector(Lic. No.Al 900509),collected the bulk samples and submitted them to EMSL Analytical, Inc.,NY,
NY for analysis by Polarized Light Microscopy(PLM)on April 17,2015. The EMSL laboratory report is
enclosed.
The table below summarized the sample results.
Cardno ATC
73 William Franks Dr.
West Springfield,MA 01089
Phone +1413 781 0070
Fax +1 413 781 3734
www.cardno.com
wmv.cardnaatc.cor
SAMPLE No.
MATERIAL
BASEMENT LOCATION
ASBESTOS RESULT
62W-0IA
Corrugated Paper
West room,southeast corner on floor
60%Chrysotile
62W-02A
Black Paper
West room,southeast corner on floor
2%Chrysotile
62W-03A
Pipe Insulation(Mag)
West Room north side,on pipe
25%Chrysotile
62W-04A
Pipe Insulation(Aircell)
West room,southeast comer on floor
48%Chrysolite
62W-05A,B,C
Black Cloth on pipe
East room above west door
None Detected
62W-06A,B,C
Layered paper pipe
insulation
East room above west door
35%Ch sotile
rY
62W-07A,B,C
Black Cement
East and West room on floor
None Detected
62W-08A
Chimney Mud
East Room on Chimney Flue
14%Cluysotile
Cardno ATC was subsequently contracted by Wes ern Mass Environmental to perform asbestos monitoring
of the clean-up of asbestos-containing materials and asbestos contaminated materials from the basement.
Western Mass Environmental,a MA licensed asbestos abatement contractor,properly removed and
packaged the basement asbestos containing materials and asbestos contaminated materials for disposal
as asbestos-containing waste material(ACWM). Large non-porous items were decontaminated and
removed from the basement after passing a visual inspection by Cardno ATC's Asbestos project monitor.
Cardno ATC performed background air monitoring during the clean-up of the basement.
Following the removal of all asbestos-containing materials and asbestos contaminated materials from the
basement, asbestos abatement Clearance Monitoring Procedures as described in the State of
Australia • Belgium • Canada • Columbia • Ecuador • Germany • Indonesia • Italy
Kenya • New Zealand • Papua New Guinea • Pew • Tanzania • United Arab Emirates
United Kingdom • United States • Operations in 85 countries
2
62 West Street,Northampton MA
Asbestos Sampling&Monitoring
CJ Cardno
ATC
Shaping the Future
Massachusetts Department of Environmental Protection(Mass DEP) Regulations 301 CMR 7.15(8)and the State of
Massachusetts Department of Labor Standards(DLS)Regulations 453 CMR 6.14(5)were performed in the basement.
Cardno ATC's Massachusetts licensed asbestos project monitor, Bob White;AM000159, performed the final clearance visual
inspection,air sampling and analysis on May 18,2015.
Final air clearance sampling was performed after successful completion of the visual inspection performed by the asbestos
abatement supervisor and project monitor.
Analysis of background air samples and final clearance air samples was performed on-site using Phase Contrast Microscopy
(PCM),NIOSH 7400 Method.
Analysis of all air samples indicated levels equal to or below 0.010 fibers per cubic centimeter(f/cc), the minimum level required
by the US Environmental Protection Agency and State of Massachusetts DLS following an Asbestos Response Action.
Enclosed please find the PLM bulk sample analysis report,the PCM air sample analysis reports,the Certificate of Visual
Inspection and the Daily Site Logs.
If you have any questions, please call our West Springfield, Massachusetts office at(413)781-0070.
Sincerely,
Cardno ATC
Edward Kolodziej
Senior Project Manager
Enclosures
Brian Williams
Branch Manager
Mvw.cardnoatc.com
CJ Cardno°
ATC
Shaping the Future
73WYam Franks Dr.
West Spnngh'A,MA 01089
413 7810070
Fax 413.781.3734
ASBESTOS ACM AIR SAMPLE ANALYSIS REPORT
CLIENT NAME
JOB SITE
SAMPLED BY
DATE SAMPLED
Casino ATC JOSII
N'eslem Mass Enriwmeot
02W'ol Street Netarpun
Bob NTile
13 May t5
1UJWME1507
ANALYTICAL SERVICE LICENSE 0 M000075
MR ANALYSE:Bob Mite
DATE OF ANALYSIS.134.1ey-15
Sample 41
Sample location
sample Type
Volume
Pmermea
Fibers/CC
DI
Fced Blank
PM'N Blank
31500
02
Flea Blank
F1e!Blank
03
Inside LMMyhMt
NBrkgmMTMPPW(QURmN
MOO
41100
.40002
04
2M Floor LaMq
MAg^al/OuPRAtarrt l
1600
3100
<0002
05
Ground Flaw Lo06r
ArBcxgm&CMPry1SMYL4P.mN
1240
31100
<0 p32
OS
2M Floor LaMaq
Fe&kgmbliwP,pwiupMmm
1240
41100
<0 CO2
Okumi j/ t aO°fno PCM AIR SAMPLING CHAIN-OF-CUSTODY ..
ATC I
Project Name: ,,n. (2...e.4)- S t , Norttn,-.l i-°..._ Collection Date: j t (S 1 1.5"
Projectii: I�5't, L•m E i 5ol 1 pr Date of Analysis: I t3 1 t S
Client: L,Aeoras-- maul r—s-..•a.+ar,eaf"i Projeet Monitor: 1 L GI..,.]�->
Location: 62._ we..sr Sf
Work Area: 1 6..ie....c..�, Project Manager: Analyst Signature:
Rotometer#: 1{• F 3 0/
Location Sample Total Volume Actual Adjusted Result Analyst
Sampick °r. Type Time Flow Rate Time (L) LOD Count Count (f/cc) ID
Worker Name/SSN/Pask/PPE (1-10) Start End Start End Oce) (f/cc) F ' ials
of Field Blank eitot
0
o 2 Field Blank ({ o0
03 a-_ C, ,J Floes 13 h-frS •2o II.q-o Cf 7 2oo Ibtno I» <ro•oot
2,.s F(In°er 1-0—'3 t,� p C
D LF. YI �- 7 ) 1k %-2S //'4° g 0 . ,)co _ [(icy /J' C9'LCZ
yJ L—t-
-- 01'_ t�1 J1I1•1 H. <30 Iv- ij 4 i �< it:a.� 3�or_ <Ci,:-�
`Zc, C-‘.0) Lw7--t II )jl I•
eoG PLO P Qoor( I (4 //" fin I`rd> 8� g IiC (2uo If 4•002 \
•
wme-13- o ) 2n r.•.. 30..•x— g..- ir," • 2 2 39 6o 1t,°° CO- LV
r f- i�, °� 8k ate" r 5 Re, 2 2 `' 3S L-/ c.,- 3i 0 (sect
3 Reference Slide 774 oe
L
0> DuplicateSlide /, (.>"
Sample Type: 1)Area Background 3)During Prep Work 5)During Final Clean 7)Final Air Clearance 9)Associated Work
2)Pre-Abatement 4)Du ring Removal 6)During Glovebag Removal 8)Personal Air Sample 10)Hazard Assessment
Relinquished By: Date: Received By: Date:
-
Cardno'
ATC
Shaping the Future
73 Wt5am Franks D'.
West SpM9fiel,NA 01009
413.7e1.0070
Fax 413 781.3734'
ASBESTOS PCM AIR SAMPLE ANALYSIS REPORT
CLJENT NAME
JOB SITE
SAMPLED BY
OATESAMPLE0
Casna ATC JOB 0
Western Mass Enwomnnlvl
62 West Street NUNamplm
Bob WF1e
14-May-15
IWWMEIW]
ANALYTICAL SERVICE LICENSE S AA000005
AAR ANALYSIS.Bob WNW
DATE OF ANALYSIS 14-May-15
Sampr 4
Sample location
Sample Type
Volume
Flberaeek
Fibers/co
0
FN!a dank
0'100
00
Flea tank
F alone.
WO
07
msga Loth,Front
Areasx.Yg0UWAIm0Rem0va
160
S100
0102
OS
2nd Flex LaMVC
AreeBeolgf0u1d .mgReaava
1608
4100
A002
09
GIOU00 Flea Lobby
MeaBWlydasvumRemoval
ISO
4.000
<0.002
10
}N Floor Lancing
AreaBacyrolxgOMryaemmval
1550
ari00
<0.002
WME.I4 41
PMSme130 Min
PersoIMMazardAssessment
60
WOO
0045
4V ME-14-01
Pers01al8 Hour
PersanaMaeardAseSSnM1
710
31100
<0.W4
P.44,,,j s a nno nz� Lnn PCMrAI //'ANfPLINGCHAIN-OF-CUSTODY •
Project Name: ' 'L (.3-€4 if St ' kwair 1 , Collection Date:
Project#: /e3 i+ •fl '' ,c;c.7 Date of Analysis: SI I
Client: `ko{4{-rte M ex -J Ec n4nn-.+ \Project Monitor: IS�
Location: 6'>— Wndc SP
Work Area: 15,a&cSnC'r�.G Project Manager: Analyst Signature: • -
Rotometerk: if-F7r1/ - •
Location Sample Actual Adjusted Analyst
Total Volume Result
• Sample or Type Time Flow Rate' Time (L) LOD Count Count Wee) Analyst
Worker Name/SSN/Task/PPE (1-10) Start End Start End (Dee) Wee) Initials
Field Blank
Field Blank
.Croat. 10 LL7 _c-- --.t- - • <,
b7 -Dan c . cruv....J Fbovj 1 c6 ` 10 r U • Ib,G /0.. c .oui
x_1.3 Ika
i- f-U.- I0 Gil-1 - if /
6R Li RPt }# i; a„t.1 jl..c R-• I� it/3- r d J.cc: il;Ul rw < J out
• i.r, J c l .,J (r....1- ) 'Y •04) ( - c,ro,..- i1 FIcJ 1 `{- 113.:(4-t5 r K i ' 0-60 ./ . 49. 0t t
zr.� F In �L / Z U
( d r4 11`7 1r - ?' of-,/ 1(75 iShT) /i» (aO�Z
0 ee / o//. (it
U n1 E- t4"c / eezr,..�"_ 3D mt.,J € ' I0 g' `f0 1- t- 30 6b0 I 0 0 <° 6147 I'` I
3 V--
✓mF'Iv . ot. SLts g . y., lif••5S •• 2 ti '3 S5 110 --..v �o'(iv`1'
V Reference Slide 7 ,.0
•
-Crl Duplicate Slide 3/1°1)
Sample Type: 1)Area Background 3)During Prep Work 5)During Final Clean 7)Final AirClearance 9)Associated Work
2)Pre-Abatement ( 4)During Removal 6)During Glovebag Removal 8)Personal Air Sample 10)Hazard Assessment
Relinquished By: Date: Received By: Date:
Cf)
Cardno'
ATC
Shaping the Future
73 WSam Franks Dr.
West SpnnSfieb MA 01009
4131510070
Fax 4112913734
ASBESTOS PCM NR SAMPLE ANALYSIS REPORT
CLIENT NAME
JOB SITE
SAMPLED BY
DATE SAMPLED
Cagna ATC JOB/
Western Mess Envtmmenlat
62 We st Street NkMamgm
Bob MIe
15-May15
le3N7.lE190/
ANALYTICAL SERNCE LICENSE S. AAOC000.5
MR ANALYSIS'.Bob Vt 1e
DATE OF ANALYSIS:15-May-15
Sample I
Sample location
Sample Type
Volume
FlbeMleld
FIbeNCc
D
Field Bank
F4:4 Blank
W100
W
Flea Blank
01100
11
Inds tarn Erect
'
A Saky0.m3WNgRemeval
1560
4/100
'0002
12
2nd Floor lantIg
Ne,BWty und'Du gRemcval
1560
5/100
�Ow3
13
GrOund FIZrLWS/
NeaBecglwn/Du Removal
1400
2/100
14
2nd Flow Lamming
Aleaeatk 041100YnngRemoval
1400
2/100
•0002
% J t.r no ,�- /�I PCM AIR SAMPLING CHAIN-OF-CUSTODY
Project Name: 6 \,.WXy �IS c'8m 2-4(4-Collection Date: S 111 IC i C
Project#: I S J W;nE 1501 � Q�� Date of Analysis: SYf 1 41 i
Client: •A 3l Project MonitorC\l \,TLJt-
Location: -tee .t o- "V�� e--
WorkArea: - Project Manager: Analyst Signature: fig. _
Rotometer#: ..�k=-3 C Iul - -
Location Sample Actual Adjusted Analyst
Total Volume Result
Sample# or Type Time Flow Rate' Time (L) LOA Count Count (f/ec) ID
Worker Name/SSN/Task/PPE (1-10) Start End Start l End (flee) (flee) Initials
' Field Blank n
Field Blank
11 tnr ;.Je fw,fa,,.4\ I1 ,-, 4( • 1S n •7° 99 e 1qS I.5-Co .`//, ov <b0. .-
130 Fro..., . ouI-r.ab
• � �� µ� � j
12 °l" II'"f P'Li If-I' f r Icif _ isvc: ,.to ��.�o
C'+-o_r) Flat, ( Ld.4 2
15 1.a,da L�„h.F/�--s IIr fFI0 / .1j' 7 ? ' 7S ,ca:o /vo L:. ( Z
2:ft- ao0. - 6 'S'a-t z ( � /
I `-f Ail- " & rFe.- I • 3 -) /y-•ri S 1 7S lb-up • /„yJ �D n;>L tJ—'
1 �
. j� Reference Slide r�+(! JL/L�
( ' & Duplicate Slide 3 zoc ya
Sample Type: 1)Area Backgrouu!j 3)During Prep Work 5)During Final Clean 7)Final Mr.Clearance 9)Associated Work
2)Pre fAflttlment 4)During Removal 6)During Glovebag Removal 8)Personal Air Sample 10)Hazard Assessment
Relinquished By: ” V I kj''- Date: Received By: Date:
Cardno0
ATC
Shaping the Future
73 Warn Franks Or
Weer SW9FeM.MA 01089
413.781 0070
Fax 4137013734
ASBESTOS PCM AM SAMPLE ANALYSIS REPORT
CLIENT NAME
JOB SITE
SAMPLED BY
DATE SAMPLED
Cardno ATC JOB*
Western Mass Euxonmenw
62 West steel.Noiammon
Bob Whie
I&Miy-I5
183W1.IE1507
ANALYTICAL SERVICE LICENSE p: AAC00005
AAR ANALYSIS.Bob WNW
DATE OF ANALYSIS:18-May-15
Sample a
Sample location
Sample Typa
Vblum*
Medfield
Flbemlcc
0
Fia'd 818Nt
Frew Blank
01100
O3
FAY/Bunk
Fite VanS
01100
15
Gro.ac FbYLOCOy Inside
AreaSa'kgrwlLLDmgnerov
2200
7)100
s0007
16
2nd Moo Outside
AeeaSackgrwWdlAwgnemov4
floe
01100
17
Easement by Wm
AalAVCltatanca
1200
31100
'0003
18
BasemenlNoim
Foal AkCleatance
1200
5/100
0 W]
19
Basement S.West Caner
Anal Air Clearance
1200
7/100
-cit.' i ATC 1
Project Name: 6,i— W n" k:ea b- 1 t ollection Date: £i //t /S •
Project#: I h 7`�'"` l eo'1 l A, ! Date of Analysis: Si 'e ' 'S •
Client: L)0-at Cr— t^aJ) n.ar .•MXt'roject Monitor: rE St a III
Location: Con— (,1Li )1- tr' $-
Work Area: �e,a ¢
p n. ru' ' ' Project Manager: Analyst Signature: a
Rotometer#: ft e 3 0 •
Location Sample a Actual Adjusted Analyst
Total Volume Result
Sample# or. Type Time Flow Rate Time 2) LOD Count Count (fife) ro
Worker Name/SSN/Task/PPE _(1-10)_ Start End Start End f/cc t/cc Initials
Field Blink
' Field Blank
n a 14.1-10.4 L oLb ._ 7-
/j 'L....0-C I I`f 8 - J /2-'V 8- ,p oo (d9
2n1 Roo oa'r..52J1-
u
3ti7otd 7
'�j�xres�k' — rt-tj _('h o' 6 is 7S `dstt) _. ..._.. • -,Yb �.x2
Nark- I 1233
!� 7 z- l Icf -ea `7c j
f 4 1 L C� l�r.v � �odz
Ci S _ (,Icsr Con..' el f?' `fl t wea I l. l 1i , zpo >7 (o•cox I
•
•
Reference Slide _• 7741u o;,J
I j Duplicate-Slide ! C e2
Sample Type: 1)Area Backgroun 3)During Prep Work 5)During Final Clean 7)Final Air.Clearance 9)Associated Work
2)Pr b temet4 4)During Removal 6)During Glovebag Removal 8)Personal Air Sample 10)Hazard Assessment
Relinquished By: \S,><—\/"` Date: - Received By: . Date:
Canto
ATC
Project:. 6't I.eon Slr Imo-f��-o...e�+.�- Date: Sr
Project it: II 3 Lyme 1Sc? Project Monitor: „ la t
Client: 1n1aJA--&r.-. CC a-d-t r.�.�-im�e-.-k� Project Manager:
DAILY SITE LOG Page 41 lI of
Time
- O�BSSERVATTIONS/ACTIONSS
B-ao
/�
Gr`0.ra 19 C c a.. i. Xe . ,5.�. A C' t, , 0 1'Ym/y000. IJ9
,,,,,V\ rn0.1p7 L LTC v\ , C. Y9 1v ,��
s.gA-+�+-_„),L, 2 I.,G"'L. or).
a• k
chi, I..)./�11.-. t�JL 71- ,t_ �, p ( n '�/r-
fm'ov o. �- G�
4o�P4-' t1
\r (4 "a H
'\\'\nom.-----��-- -3e..,e rt .ao�- 0_-,-P__--._ -•-ems ,
tea Da- �}ro k_rear e_ A C r,-+ o� l:� o r \n var�.,u r r
°(if oft?t I •-t. a-a.-+r.'il
Y-2r..'..
r �2 f
•-Z
St-C -z S r...�� u•�>`� o I' e--rte-s (1 G
S-' 10
n1-...
F
/
-Q re-fl 4'PS)., M.nry (So
/svc.e . p
l'O�yJ view!. N _ _` _co
-..
�4 12 t.tvl1!i ---q r~�)
eo Z2o 7-- (3. 51r .I IS. - SI->_s) IT
9- •3•D
/l� i
Ca .1 t 1 l,n� Tne^ u..in.URMJ CO3j-° AT c of 'i�-t krot''
14 N0
t/.
, .i a4m Ilro Iv0f
elCOPT\ _
d4 O
11fp
{.
y-t-
XI 1..t - 12--1t -0J� 0.°10.�1R I t.terri
�e�e�lyd�
t--f° \e tr-e 1t• -Q>-e� . 1..j.LLnatrd Jai tVV tarT rCA 67tm-e-P/
lime;
4-. tlu - , A _
.. • r-eneve-2. NCO 4i..c
Ty lR TLRIe.\�A .• ,^0 .0 K 1/1-el`
t O.0
J
7 R -jf1L�-P %✓t - SF@ c CGrn
« 'ice
W Orkej g-t• -, Cr\•, Wa, C T..-12 J l /I' w- r.Q rraw11 .
�st
Gm(-n. , r )e-ta 1J\ " Lran.„ a t1/4_,-_,„
�
-I ,..,\.ue }re- r war
Vrt.r
t n ocx- iYi
2. rP
06”
Yr
/_ tt r 0-..--e- o i o✓/ (..,cots
• E" {O't-�Th
n�A)
$ L J y ��^ r `.-Z.r-,o..-e-.nd e.-a wCxx( oy S,,-M-
c:1-42--,
I .- _r Q-. .; 4rn cc
% e-'rr Vac...u.-- +-1 pie, Vc.c road•(-
lUea) ao-Le ljt ; . �.1,* mQ71Lo
kr
15.7a
pir-
LA - 2. c9-e V l r ol,5)Lei-, '\„ 3 .mac � ct.,e'.X
&X cLs1 o�;b-< 0.r.
i y.3,
9
l g
Cardno ATC Representative Signature: Title:
Certg
Carcino
Arc
DAILY SITE LOG Page_t_oR2
Project:. ei r S l" C"C 't�,/1 I,Dater /j'S/ ) j (/
Project#: I 7 L--IM /5Th 1- ProjectMo///nitor: / e, t tv
Client: L3 `z(gym fie)) l-.1t?'+-iy^"`—r"/ Project Manager:
Time
OBSERVATIONS/ACTIONS
Cardno ATC Representative Signature: 1' a Title: v' m�'""' Cerfkr'DdG/�S
Ca. rdnn
Air
Project. v 1 U-a( S (' Nr�I/S.1tmC4 eta- Date:
DAILY SITE LOG
Project it: )%7 W m E H u'7
Client: Wti1 rrAr1
Page
Project Monitor: < o b U
n.Intw'ejc,/ Project Manager:
Cardna ATC Representtifive Signature:
TItIr.Vro,{._Gt m`M /4 CCerUOn00013s
Time
- OBSERVATIONS/ACTIONS
4)-o,6
echt-i) C C , 73,11, 13/,,,f2. Fl-P-ucoo 161
/ l
2_ %Jr oh ll�� J
nil
(-b 110 • I2.In.H-r. a -o., 3.
... � •
��„_; ,,s,Yt • ' ,.�ems.[
pp � /t ..��coT _ /� L
P.�I ao� nat Citeener i/Pm1' Ca.. S.-, lo-t llc-r L'. tP�..e �2
j
(J(N
I . - 1 .5 ao2
in
J l • ^t G+.-. S .k jzi7r"L Jam
11 s
-op
� . �uf-rr' ._. oun
1\34 11 tt2 firwo
yla .'Y
- C€,,-.., Ce.-- . __.= rL ;,---) ulrat - itle -, 0-7 1
61-re '-'eel we') i�wn„-�-{—k , c-Dan n K,
�P
_r0
r t—k! riY.lY2-+--/ C
T�c�-
�tr4 crt I JL J 11
I f'c>
sit-E)Y( -1t <>Li ' /1e>✓
t;Jrl-,- c t t(' -c-..pL
!n7
- \,-%rKpp h r sL-='> -L •X (t.t.,-2
-,Yt.,m¢X t C) ::.-_, ,Kn,. . 5\ 0UY '� f ar-,
.y.
LI L� i t e ct TJ O-;U- L, v 41yr r I-c1 . ��
i e 7 k€ -e% .. 50
Cardna ATC Representtifive Signature:
TItIr.Vro,{._Gt m`M /4 CCerUOn00013s
Caren
ATC
Project:. X L•3 \ bF Q0vAtalef^^ Date: S ) I 'S,J '
Project Monitor: v ,o to)C,
DAILY SITE LOG
Page of
Project N: 4 3 W Ina Iicll 1
Client: LA krr ct c J)
Project Manager:
ri.yp.Z V'n pt�YtJ Cerdrt/n(x.�01� 9/
Cardno ATC Representative Signature: "11��—t— ✓✓
Title:
Time
OBSBRVATIONS/ACTIONS
Pr i C-
S"DV
Lcc-c-)tea
\ e
Q. ,na.' 'c,, 6-, r"L (S+0,s °�
I � p--
/`.�t W a^ CJGy
r'
/V!� ,
e1 _u-p n,= ric cti 2- 0 rn i.r t,--1T-o F>Z— Lp9-Q C S r 1-�l
is
r
r^a, c r .--) c,;--1 uL. .l '�� f LO v, r_e.r, •e0»
V S
q. .A
tar„1..,ro ,..t. -e I-21-...n..-= •--1" n e I re-en g cw-r 3r0
{o
c - - (!-`C_ r ) 9e4 b Ci'9 rn r rXRIMI 'lesS
ci. 30
O...Y✓-r'T 12t-e ' C.rnalfl lrr, r it °s..-1 Jr& ae...® .
D. 3,
\).-.4t.- (wcs - .
(
i 1 •o`^
p 1
tea`/ \'^YC Cot o` ,Jwr` ic., o---l�-
1 Vd nrj
,t.�e`/..r-� -
IIfr
/2'o)
t,.)a-A,- r,„:1-1:--he . •
(3.4e
16—k tor y----,4
/ 4, 00
L)04' W fr.'I..-7 2 , l..lcbto .en\aA -d :r Laaeme ±. gee
14 Te„,,,,_gtr,„ Uo ze.rn-e.-C L a.-rC tan. ren.t..e S Is 1✓u
,t
i-at>t . •IcJ_e._ 1•. 4. , r,.y, Ati∎I,c.--s ;le eIP • .
o it .
(t-
ri.yp.Z V'n pt�YtJ Cerdrt/n(x.�01� 9/
Cardno ATC Representative Signature: "11��—t— ✓✓
Title:
Canino DAILY SITE LOG
Alt
Project:.b 1p3z5t $r w(11-tiva Ql:rr. Date: d/ Ij
Project Monitor: 7r1 6
Project#: 1:c" 3 M.'onE i;o'l
Client:,__No. .n, malt Er-w't-r"an
Page /, of I'
Project Manager:
Cardno ATC Representative Signature:
Time
- OBSERVATIONS/ACTIONS
1 .3-'
Arc C 0-. ,r 19 iTSI) E.J\e, Q. A(,-.m9 161
rw
W-cA-e....,— vr•
It ea . L_ , —
,1 _
®_e w UC er-o( ,
N
Imo°
-
k t _ ce,-,Pt Lat./ u,. it.-a-2—
.- c �oSre, '_
irOLrr r .,.vs1 t,y.a 9-t e.. LaPc r_._4"
(o coo
m-
2- w< sr-c., . Ll Om e. I 4'ft o e c 1enn.
L
i1.
���
CC-Cif/Lt. C tom, 0-01 L4) Ad Ll : "-.-,,r."VCI
oo
..�_I
ca v...-.,+st ,z q. C .. Y i;C .,, .--h os--eC r:Q4un ..
i',)r
t-irrk 0'44
_ l' 1, -
h;c� C ,-.�, �i V ) � ..Si.i . ... _ � -YS Z�-LVx,t c. JCUI
rrod
i(ATr �u,;-f C'-1-R 1, /� _:- t e .i Cr-it'," . ;�ede>. S..--e n-,.-e
.J `9.
4�" a ' t - C-5;€1-.-) 'r-"T rte. , I.-sr 1\ - ter: 1
C,-,k tUct t..:n:..I. c t 1 arNeti 1 co lam(.� \.,y C-e..�..,
-1
S � (�
V(`��.J, li 1 I n)cc3: d. . �T+a. .,t i cQ_CO, . �LA vi,ees LJ<.(N 1—lnci
- S lo-`" �^ c e. y ..- l.,`-lll IG . lnnd I)a_r-f A-1n4
l'i
QccAf'-
p
'J Li),,, LA., 1�) (\nt-A-i`-e I` H .ali -, J\..c. f k..4.Sr.-.l:e.n
/r`N
SLJ, `3 C u... )�
Y C` nC-
V tt_.�5=
C.:OF CO .Yj
d ite e>~ a it C.� 3 Et ICI • OAS -vC w1LF l.�'.l e,
.�
\ t l
,lr.Ce
p
�M1 G-w(1 C'� �i[ NI JSI\7WCo . KOaI
3
,..kk 'ft
CCvt 1 ( } l l( w
l4'
r.
-z F lSO ') a v� C :�GYV. ` " ) CI.y„ . 1>
Cardno ATC Representative Signature:
Canino
ATC
73 William Franks Drive
West Springfield. MA, 01089
Tel: 411461-0070
Fax: 413-781-3734
CER11b ICATION OF VISUAL INSPECTION
CLIENT: ,. M°
PROJECT NCIMBER - k ? 3 ur FYI E !5o7
GENERAL LOCATION l.9 Ur
ABA'L'EMENT CONTRAC iu_L liJp,i-er- m°" E0J -+ar ■tr--�ta
NTHOD OF ABATEINCRNT: k- S e I ..r c o-nom_
TYPE AND QUANTITY OF MATERIAL A.3A-D a20 (... F er><- ,.r..`Oh ' D-o 00 mfr jl.�-nS
SUSPECT MAUURIAL REMAINING N WORK AR`--A: N �^11 l
SPECIFIC AREA INSPECTED: Cart-QUO& I/<.S2rvw,t
CERTIFICATION OF VISUAL INSPECTION
In accordance with Specification for this project any applicable regulations the Contractor hereby
certifies that he has visually inspected the work area(all surfaces including pipes,beams, ledges,
walla ceiling and floor, decontamination unit, sheet plastic, equipment,etc.) and has found no
visible dust, debris or residue. /�/� / . ,t -
Supervisor(Sign.
Signature): //,/ /, l/( .43. Date: S I li
(Print Name)• r/lAkd
n�Y
Accreditation Number:° JC '" ( J( 5 t1 ; State: M A
OWNER'S REPRESENTATIVE GERI Le ICATION
The Owner's Representative hereby certifies that he as accompanied the Contractor on his visual
inspection and verifies that this inspection has been thorough and to the best of his knowledge
and believes the Contractor certification ab ve is trruo and honest one.
Project Monitor(Signature) l J Date:
(Print Name): 2 t kreri- F
Accreditation Number F\ Y\ 006 161 State. M G}
Cardna'
Shapinplhewmre
a west 5 -r — w's� AA Ev vimw*n+41
IVdAirGmai
heir isr �ft� ! 0 LF corcefl + rvutil, Lee�'I,�F ie
pT� 75 [ZED) viIky1ife nsvat,svnt
..r a as It pi - S
SHEET NO. OF
JOB NO. dd
BY DATE 'i VW
OK DATE YYYY
EMSL Analytical, Inc.
307 West 38th Street,New York,NY 10019
PI00e/FU' (212)290-0051/1212)290.0058
hnnW NW(EMSL corn tnenbattaniab,6:ems1 com
EMSL Order:
Customer ID:
CustomerPO:
ProjecAID:
031511484
ATC62
11-81-0030
n:
Brian Williams
Cardno ATC
73 William Franks Drive
West Springfield, MA 01089
ojecl: 62 WEST STREET,NORTHAMPTON,MA
Phone:
Fax:
Received:
Analysis Date
Collected:
(413)781-0070
(413)781-3734
04/18/15 11:10 AM
4/21)2015
4/17/2015
est Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
Non-Asbestos
Description Appearance % Fibrous
Tan/White 30% Cellulose
Fibrous
Homogeneous
FLOOR SE
CORNER(PILE)
WEST ROOM-
CORRUGATED
PAPER
(WHITE/GRAY)
% Non-Fibrous
10% Non-fibrous(other)
A toe
% Type
80% Chrysolite
1-018
[1464-0002
FLOOR SW
CORNER(PILE)
WEST ROOM-
CORRUGATED
PAPER
(WHITE/GRAY)
Stop Positive Not Analyzed)
r-0IC
11484-0003
FLOOR CENTER
OF NORTH
WALL EAST
ROOM-
CORRUGATED
PAPER
(WHITE/GRAY)
Slop Positive(Not Analyzed)
1-02A
11484.0004
FLOOR SE
CORNER PILE
WEST ROOM-
BLACK PAPER
Brown
Fibrous
Homogeneous
70% Cellulose
25% Synthetic
3% Nor-fibrous(other) 2% Chrysolite
1.028
114940005
FLOOR SW
CORNER(PILE)
WEST ROOM-
BLACK PAPER
Stop Positive(Not Analyzed)
I-02C
Iwe40J06
FLOOR ALONG
CENTER NORTH
WALL EAST
ROOM-BLACK
PAPER
Stop Positive(Not Analyzed)
it rreiraatnt hehlily pntedlo Ce5t of analysis. irsrepatt relates only b the samples reputed&N may net beleyMuced.erupt In MLx1NU1xntlen approval by EMSL EIASL beats no
,asihlity for sarpla Mttion ac9M9es nau'ytca1 method llmu9MS.Inleyeleum and use of test reaps ate tte tespauiGlity olnacbetx TNs report muyl red be used by Na Went to claim
loci ca:n(0n.appeval,ae(Aa£Hrcnt by*NAP.NISTw Wy agency of the WNW 9wttKnent NonCriable ongaringly bond=Wins present a polem mtrlx all mate EIASL
)(t'rends rm e4,crbucM pion roaniysis. Samples recall In geWCo Ofd ugess WRMise MM. ESNrutMMMCY precision and n1Kemanty Oats aralade wornequest/Mess
Jested by Yedigt WIGng nalenab msaUxMed'M mltiplelayas Ole p detM1 Tallman.NO Me reported as avrq'es&Tpa Repato7Ij112I Is IN
Wes analyzed by EMSL WINNOW,Inc Nex WWII?AINA LAP,LLC-IHIAP AwMeM X102581.IN/LAP LabCade 1010489,NTS FLAP 11500,NJ NY022.CT P1L110.AU 00000170
ial report from 04/21/2015 09:38:18
Report P1M(S)-725.0 Printed:4/21/2015 9:38:18 AM
EMSL Analytical, Inc.
307 West 38th Street.New Yore,NY 10018
Phone/Fax'. (212)290-0051/(212)290-0058
3t17/M1mwi f1AULroe] manha nelge ms corn
EMSL Order:
CustomerlD:
CustomerPO:
ProjectlD:
031511484
ATC52
11-81-0030
" Brian Williams
Cardno ATC
73 William Franks Drive
West Springfield, MA 01089
7jecl 62 WEST STREET,NORTHAMPTON,MA
Phone:
Fax:
Received:
Analysis Date
Collected:
(413)781-0070
(413)781-3734
04/18/15 11:10 AM
4/21/2015
4/17/2015
est Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using
Polarized Light Microscopy
pie
-03A
149um7
Non-ASbealos
Description Appearance % Fibrous
PIPE CEILING
LEVEL NORTH
SIDE WEST
ROOM-WHITE
MAG
White
Fibrous
Homogeneous
% Non-Fibrous
40% Ca Carbonate
35% Non-fibrous(other)
Asbestos
% Type
26% Chrysotile
-038
14840008
FLOOR WEST
SIDE OF EAST
ROM-WHITE
MAG
Stop Positive(Not Analyzed)
-03C
1484U49
PIPE CEILING
LEVEL NORTH
SIDE EAST
ROOM-WHITE
MAG
Stop Positive(Not Analyzed)
-04A
1481-0010
FLOOR SE
CORNER(PILE)
WEST ROOM-
AIRCELL
Brownffan
Fibrous
Homogeneous
45% Cellulose
7% Non-fibrous(other) 48% Chrysotlle
-04B
148f0Ou
FLOOR SW
CORNER(PILE)
WEST ROOM-
Al Re EL L
Slop Positive(Not Analyzed)
04C
14844012
PIPE FLOOR
LEVEL NORTH
WALL EAST
ROOM-AIRCELL
Stop Positive(Not Analyzed)
05A
14844013
PIPE CEILING
LEVEL ABOVE
W.DOOR EAST
ROOM-BLACK
CLOTH
Brown
Fibrous
Homogeneous
98% Cellulose
2% Non-fibrous(other) None Detected
m0man11taFbrc netted to cost of analysm-The reotraNBS m:y to lMeaclfes 0epagcd and 7nelbe reodoCed.watt In Ml,mahout annen approval by EMSL EMSL teas no
nsiblityM san*a colecbn activities ualalytical methedivrilations.Inte'petaecnaid use onest resins are he respcnsibut1 of to(Meat ills report MuSt not be used by the dinl to claim
,acatiriaeon,amoral,a-eM sementby NV1AP.NISI of ally agency of Lherederai government NowtMde or anccy wend nestles present pollen awls andtherefore ELISE
!mends gavimelrlcrSU.ton Mee to analysis. Secretes received In goodcm®4an Mies'geneise!hied_Estimated accuracy,preclsin Ydt ctIfl dale sealable upon request.Unless
■sled bf Me dint Gagep natMels me nxacbxed nlemarina layers 0 e 4mcemm.wSt ,wd,ere)are'tenoned as a single serge Reporting turn a 1%
nes say N by ELMS-Analytical,Inc Ne,YUY Nf AIHA.LAP.LLC-IMAP Accredited/4102581.N AAP Lab code 101045-9,NYS ELAP 115505,NJ NY022,CT Pr10170.144 M000170
sl report from 04/21/2015 09:30:18
report PLM(S)-7.25.0 Printed:4/21/2015 9.38:18 AM
2
•
EMSL Analytical, Inc.
307 West 36th Slreer,New York,NY 10018
Phone/Fax. (212)290.00511(212)290-0058
brio rNnvw EMSL thanbartlakasnelsom
EMSL Order:
Gus tomerlD:
CustomerPO:
ProjectiD:
031511484
ATC62
11-81-0030
Brian Williams
Cardno ATC
73 William Franks Drive
West Springfield, MA 01089
ljecl: 62 WEST STREET,NORTHAMPTON,MA
Phone:
Fax:
Received:
Analysis Date:
Collected:
(413)781-0070
(413)781-3734
04118115 11:10 AM
4/21/2015
4/17/2015
est Report: Asbestos Analysis of Bulk Materials via EPA 6001R-93/116 Method using
Polarized Light Microscopy
Non-Asbestos Asbestos
pie Description Appearance % Fibrous % Non-Fibrous % Type
-056 PIPE CEILING Brown 98% Cellulose 2% Non-fibrous(other) None Detected
LEVEL WEST Flbraus
14890014 WALL WEST Homogeneous
ROOM-BLACK
CLOTH
LOSC
'14890015
FLOOR SW
CORNER(PILE)
WEST ROOM-
BLACK CLOTH
Brown
Fibrous
Homogeneous
80% Cellulose 20% Non- revs(other) None Detected
I 08
1184.5015
LAYER
BENEATH
SAMPLE 05A-
CHARRED
PAPER LAYERS
Brown
Fibrous
Homogeneous
65% Cellulose
16% Synthetic
12% Hair
8% Non-fibrous(other)
None Detected
1-0613
114890017
LAYER
BENEATH
SAMPLE 05B-
CHARRED
PAPER LAYERS
Brown
Fibrous
Homogeneous
70% Cellulose
10% Synthetic
14% Hair
6% Non-fibrous(other) None Detected
I-06C
11484-0018
LAYER
BENEATH
SAMPLE 05C-
CHARRED
PAPER LAYERS
Brown
Fibrous
Homogeneous
40% Cellulose
25% Non-fibrous(other) 36% Chrysotile
mated appears to be afferent from satra9 Ea fib
I-07A
114690019
FLOOR BESIDE
BOILERS EAST
ROOM-BLACK
CEMENT
Brown
Non-Fibrous
Homogeneous
4% Cellulose
2% Fibrous(other)
54% Quartz None Detected
40% Non-fibrous(other)
/-078
11489-0710
FLOOR BESIDE
BOILERS EAST
ROOM-BLACK
CEMENT
Brown/Tan
Non-Fibrous
Homogeneous
4% Cellulose
3% Fibrous(other)
93% Non-fibrous(other) None Defected
SL maintains Iieblity hmlelIo cast of analysis.This report refines orgy to the sams1 asrepate0and may 001 be reproduced,except in Nl,Piton x/21100 ans.-oval by EMSL E415L bears no
Wree:Pity for sa+p'e&laden acenees or analythal method llnibtms. Interpretation and use often results the the respvrsiblMyof The client -Pis leportnust not be used by the there lodlMi
Iva U tlts6m,ageov a or eMYsNrent by hMt .NEST aany genc/of the federal 9a'mrnent NMldab'a ofgaiC IY bound mate 45 presenta problem maths and therefore EMSL
ammends wavereldcreKGm pia loa"Myis. Samples received in peed sondtm utess Wenis8 Mead ESemskd xuaacy.prmum aNumlanb dab available neon request Unless
-rested by the dent bolding mitosis mxMaWed with m40s1e layers(to Imo!them wiEAWd,etc)areregded ase site sancta Reporsg limn Is 1:5
Wes anatlzed by EMSLMaEyticS,Inc.Nee Yak NYARALAP,LLC-IHIAP AwellIM 4102591,NYVP Lab Gale 101045-13 NYS EU&11506,NI NY022,CT 810170.MA A4000t10
ial report from 04/21/2015 09:38:18
Report PLM(S)-7 25.0 Printed:4121/2015 9:38:18 AM
EMSL Analytical, Inc.
307 west nth Street,New York,NY 10010
Phone/Fax: (212)290-0051/(212)290-0058
bppTNNw.EMSL OM mantlattanlab,'em51 om
EMSL Order:
CustomerlD:
CustomerP0:
ProjeClID:
031511484
ATC62
11-81-0030
n: Brian Williams
Cardno ATC
73 William Franks Drive
West Springfield, MA 01089
Jject: 62 WEST STREET,NORTHAMPTON,MA
Phone:
Fax:
Received:
Analysis Date:
Collected:
(413)781-0070
(413)781-3734
04/18/15 11:10 AM
4/21/2015
4/17/2015
sst Report: Asbestos Analysis of Bulk Materials via EPA 600/R-931116 Method using
Polarized Light Microscopy
pie
-07C
14841027
Description
FLOOR SOUTH
SIDE CHIMNEY
WEST ROOM-
BLACK CEMENT
Appearance
Bropm/tan
Non-Fibrous
Homogeneous
Non-Asbestos
tir Non-Fibrous
45% Quartz
48% Non fibrous(other)
% Fibrous
2% Fibrous(other)
5% Cellulose
Asbestos
% Type
None Detected
-08A
14890022
AROUND
BOTTOM
CHIMNEY FIVE
E.ROOM-
WHITE
CHIMNEY MUD
Tan/Pink
Fibrous
Homogeneous
54% Min.Wool
32% Non-fibrous(other)
14% Chrysotlle
-086
1481-0023
AROUND
BOTTOM
CHIMNEY FIVE
E.ROOM-
WHITE
CHIMNEY MUD
Stop Positive(Not Analyzed)
-08C
148440324
AROUND
BOTTOM
CHIMNEY FIVE
E.ROOM-
WHITE
CHIMNEY MUD
Stop Positive(Not Analyzed)
LcroNINnsllatety Iir tile costaMYysis.Iles repalreetes only to the srpes reported and ow not berepocruud,ertept In Mein Nwlssn%en a0/otal by EMSL EI.!SL bean no
a'sipllry for sample Coffeceen S4sn4es or MNyteaI melW[(engem Interpretation and use dlestreWls teethe reS osIIb1lly of he client 'Nsrep't masted bo used by IM clientte Gain
uctureficaecn,approval aenoxsmeMbyMMP KIST a any agency IXee federal gov'mmmL Non-friable agaicaVy bottle Mande present a preVan matt amaerelae EMSL
amends gcanneehCrM Am poor to analysis Samples received in god¢agate V.Ie5s dMmise noted. Est ed accuracy,precision and Uretlsnty date aveeabe treat request Un:ess
esled by Vatllmt beiYg mslmals mnlachxed teal maple layers 0e.liMean wtIMME Notate reported an sV4'e sample.Repadng INN Fe IN
p!es ryyled by EMSL NN}NW.Inc Nex York NYNHA LM,LLC-I1ftPP Aaaed.IM 0102581.NMAP Lab Code 101048-1,NYS EW 11926,NJ Ny022 CT P1 0170,MAPAW0170
al report from 04/21/2015 09:38:18
Report PLM(S)-7.25 0 Printed:4/21/2015 9:38:18 AM
EMSL Analytical, Inc.
307 West 3811'Street,New York,NY teats
Phaneoax (212)290-0051/(212)2510058
Ononvmw EMSt com manhaeamaaaemsLCOm
EMSL Order:
Gusto/fie/ID.
CustomerPO:
ProjectID:
031511484
ATC62
11-81-0030
In: Brian Williams
Cardno ATC
73 William Franks Drive
West Springfield, MA 01089
oject: 62 WEST STREET,NORTHAMPTON,MA
Phone:
Fax:
Received:
Analysts Date:
Collected:
(413)7810070
(413)781-3734
04/18115 11:10 AM
4/21/2015
4/17/2015
2
1
The samples in this report were submitted to EMSL for analysis by Asbestos Analysis of Bulk Materials via
EPA 600/R-93/115 Method using Polarized Light Microscopy. The reference number for these samples is
the EMSL Order ID above.Please use this reference number when calling about these samples.
Report Comments:
Sample Receipt Date::
4/18/2015 Sample Receipt Time:
Analysis Completed Date: 4/21/2015 -Analysis Completed Time:
Analyst(s):
Jon Williams PLM(11)
Samples reviewed and approved by:
11:10 AM
8:19 AM
tta VIA tl }FLWGV,r((") h
Kernel A/awawde PLM(3)
James Hall,Laboratory Manager
or ether approved signatory
rreaniaire 4MTly rimleclo tasldanalyss. misreport Mlles aiy t the sxryies repWM arid May not be reproduced exceprie tell,mint Nilnen gporarby EMSL EMSL bears no
nsi r 1p sxry'e wile on erIh4 e1 or aaiykkal method britavms.Iraepeta1cn end usecrteslrev Als am be respOnsipldy de.diets ills(epol nest no be used by the cent to clam
otwt00tpt approval.ix endorsement by MIA?,NISI or any agency Mlle federal government Non-Mate a'gaiWly bound SrelnielspesMla padem moix and therefor EMSL
emends a neck rsucfim poor to aiaysls.Samples received ingWcmAem viess oj,nsise riled Esto¢IM ttwary,pevsim edlacxtanly data avalaue lgmrepiesL Uness
sled by IMd;MI bul4ng mammals mva(acda thatemIb{e rapers(.a lino enl wa Pbo r0-etc.)Yerepotstl as asngb$aryl¢.Re edi gbmt is AP.
Ves wWyzed by EI.ISbanajtioa',Inc Neu York NYNHA-A,LLC-IXIAPAcaed,led 0102591,NNAP Lab Cade 101048-9,NYS SLAP 115,NJ NN22,CT P-0170.MA MLY0I70
II report from 04/21/2015 09:38:18
teporl PLM(S)-1.25.0 Printed:4/21/2015 9:38:18 AM THIS IS THE LAST PAGE OF THE REPORT. 5
Relinquished by: /.PPAlin r/C Date/Time: 1:'
x
L ..
�+ Daie/Time: a �'L�LIh @..I4Vi��°ru ' in
Received by -`'� ,i.•t i/ -� Y�/4�( CCC )/n; ,� .I r :
Relinquished by: Date/Time: R�,V
,;14- }-
Received by: i
Y: Date/Time:
bate/Time: - "iyl ra:
Relinquished ei by: by: - M�: T±y 4. ,p
Received 6Y: Date/Time: , r gto i A yv 'y`." A.:e.i t. ., w v. x^43 ,-,
ms.
Company Name: &144/14/) ATC Associates,inc. EMSL -b -r-4
rvi�
company Address: /'j ,{j1I/1/{/fl11 / �d �[ 307 West 38th St. New York, New York 100)8-2913 _ p?
Zip: 11 212-284-5948
[qty / I a_ / seta ✓ .. M/ o v
x,,a41' • a J Prd ect N3mer I' I I d we 7 +-.
Fax Projec[Adtlress 1L VIIII • V r Ye_,.rq
Ir ��r / I i Turnaround Time: V�'(!
m
Results to: .' �/� /� �/ t'i' ;:
Verbal Results: Yes I� Project Number •ii 'r , I rJ {f•� Fax Copy by: `" ,
✓Cell or Pager R' Sampled by: Lee ` ts'�,� Date: J�� y J: Return Samples: Yes S
_.—. SpedaTInstructtonsor Comments:_._.._ .._____ �(�J/ `___!{ !�)�/C..— � _
Site Fax (/'�� 4- / -r
Additional Fax: v* 'c rt I(.^*• /
Lab ID Field ID Location 'A • • pie Description Homogenous
N3 - Area#
" / Ai r E •• I e •• 7/ 2 J a Re.../-'. •
/ . ♦ 'LLrnAorl`P)e"i�. • d I I c..�. ./AI �7I11.�r1 sc���1/��
IIIIIIII • . _... c'rthn okA6/fr !.-y�xy. ma • JI IL �I n/RI/1.J7 .•n�VP/irN/l
-I i �anaaR+t`ILaK1l R4 •I•. F., ..0i r /I MOM a Y�•Jd/Yl:� l
run I _ I _ _x 1 . .I /� • 0._/ 11111811
�
*b r _ I/ I// k r I/ I s II
■R, IS 1 1 I( c [ III a ' 3•
Loz IR
4,2W' 3C, A ot Ceding teltel
rit Ai S:deEBJY7P[url
I � , , . : ��
Oa
fir ratnINIMMEllgrilll
69,901- o'/ ✓ , G . ''// AI's. le\tal1 Y1le�(rma r f/
1Y s �7 (' ( ; S _ LUn• hlr 1 . I_t.j o Received by: Date/Time:;relinquished by Hb
Received by:
c../ Date/Time:
Relinquished by: Date/Time: Yit Jyh .,,yr«
Received br
Date/Time: Mq F ,. ,-?„+;..r x s 4 7 f t R.v.
/� s'r..r&" , g,$k*aww'' -5..4yy.i w. .tee "ill.Y.. .4
Company Name: 64.79 ATC Associates,Inc. EMSL -
ttl
Company Address: ) I i rTl`✓
_ !1 lid L 307 West 38111 St. New York, New York 90018-291 coE.
1 ZIP: 0 212-284-5948 mZ
;rye ,� inw ...yyir I 11 P1olect Name ^'; / A at _ / _ Analysis Type:
��
L.- a-'
Fax tt Prod¢"t'Add ess ^' '✓�v+n non�'t(n/ ,v/ .t Positive Stop; Yes No_o_
Results to ,f11/i ���/111�,� � Project Manage Rn"�((�V t"'I��r/�I14slMlf`f Turnaround Time: j fiq/ A
a Verbal Results: Yes `;�.FfJ�r III Fax CO by:
`•J
NO prpjeM Numbe// _�, ;:, '77, -7!__ ] Copy �.
Cell or Pager#: Sampled by: ,t_(�P /(U3OAl}e Date.i��/7'/f� Return samples: Yes g
_()Site.Fax:.. spacialr ns cr.Comments— /// //..
additIonal Fax: N�l�///7-. 4())//5 c4—
Lab ID Field ID Location Sample D�yc' "ription Homogenous
N Area#
/al '/ Ii r t.qu 411 ' �� 'Se '.t. .4.0.
i . . : ,.!_• r< V a i 0 • _G .i leans/
.J � r7 ��' N—Q .1 � 9 i � i
r a a l fi .. a ::_.. .--= - . LEA— � ,.,1"na� !. . da �r t . , .li.1 .414
.
/ v- 8 r I_' a 'i r Ii F LJ I / afl
Massachusetts Asbestos Waste Shipment Record
017 ti1O2zc
MassoEP Asbestos Notification Nun-bar
G
E
A
0
R
N mere am 1 4 2fi
11 ( pn� xnmber
Western Mass Environmental,LLC 93 Wayside Avenue Springfield,MA 01089
N 969lRS5olAsteslosCmlmMr , (.410' '-2k2J-
Department olL standards(ots)License Namte: c I ers nName(N L1 went rmu'n rel C pl'na rvumDEr
Asbestos-Containing Waste Trial ACWM)-spealy Type a Amount Generated
Friable r ❑N n Frabe
Cuently el CUbl:1eiers(Cubic Yards) Qum;lp n Cub.Meters(Cube
Containers Used for Shipment of ACWM-Sp M Type&Numb used �fq
❑D '.sled I i% fikelf-0 BgsMYp 75 ❑ob
Numbs Number Specify
5/)OA5
accurately described above and that they ham been characterized,packaged,marked and labeled v Cenf®lion Dale lMMODOR
mancew hJlO _Fi]}5.'
a. . � ,Mi .�'4 I�On r,�t SOtinJ'10.� �ro p.,r,� '1q,--.,
Pnnlrnme ve
Work Site OwnertOperalot Certifoalion a l hhereby COM that lne Contents el this tIss shipment are Silly an0
Numbe
Western Mass Environmental, WC 93 Wayside Avenue West Springfield,MA 01089
Name&Address of Company Person Tansponeg ALMA
Contact Peso Name(oot) mfram Move) Ides,/ tie rim r Cate ALMA Was Neded Up den/SDP/VW
Transporter&I Certificaden.'I hereby Certify that tie contents of this shipment are i li respects more (5- -/e -J5
Koper pd On tfQndac40rd g applicable Imemaf federal,state regulations." CeMMU N
OmV )
Litho () c - if )::,if
Srgne/dee Pdn
Tice
Name a Address of Company or Person Transporting ACWM
Contact Person Name of Different From Abrvel Telephone Number
Transporter&1 Cemiipatlon'I hereby certify that the contents of:nls shpment are in all respects in the
proper condition for transport according to applicable international,federal,state and local regulations:
&cremre
Print Name Tube
Vale AGSM Was Posed Up MMiDINYYYY)
Ceraocadrr Date MMm Drc V Yi
E
Name 8 Address of ompany or Peron opeaung Disposa'GI
City Pown
State LIP Cole
Contact Person Name Of /Wam From Abesel elepbona NUm
Dale Shipment wed Re ved lf.IMIDDtYrvt
Indicate Any Discrepancies
Disposal FacilnyCendmatlon:5 hereby certify that It)the quantity of ACWM listed on this asbestos waste shipment record Is the same as the quantity
accepted for disposal and(2)this facility holds the appropriate permits andior authorizations to accept for disposal the ACWM described'
Signature
Print Name life
9114
ORIGINAL RETURN TO GENERATOR
Asbestos Waste Shipment Resort
xthampton Mail-asbestos management
https://mai I.google.com/mail/u/0/?ui=2&ik=9954d8032f&view=Pt&q...
Ed Smith<esmith@northamptonma.gov>
festos management
Issages
Itr,Robert(DEP)crobert.shultz@state.ma.us>
standicktmst@verizon.nef'<standicktmst@vedzon.net>
'esmith@northamptonma.gov"<esmith@northamptonma.gov>."Simpson,Marc(DEP)"<marc.simpson@state.ma.us>
Fr,Apr 10,2015 at 2:23 PM
acid Afternoon Kary-Thanks for the call. With regards to next steps for the basement of 62 West Street,Northampton, I have the following
ormation for you:
ider current MassDEP asbestos regulations it is incumbent on property owners/operators to maintain their asbestos in good condition,see(3)(g)
der"Prohibitions"of the attached regulations. Also refer to the definition of"Asbestos-Containing Waste Material"of the definition section(1).
oper management is accomplished in one of 2 ways.
The easiest but most costly is to presume all materials(with certain few exceptions)contain asbestos and make sure that they are handled and
sposed of as such. Because the EPA asbestos ban regulation was a thrown or of court,asbestos products are still imported into,made,sold and
stalled in all types of buildings in the US. Do not be fooled by people who tell you asbestos is only found in buildings built before 1980 that is a
ossly incorrect interpretation of an Federal OSHA regulation. Instead please refer to the definition of"Suspect Asbestos-Containing Material"in
action(1)of the attached.
*OR***
Perform an asbestos survey,by retaining a licensed asbestos inspector. You can find the definition of"Asbestos Survey'in section(1)of the
Cached regulations. You will find the requirements for performing and reporting an Asbestos Survey in section(4)of the regulations. Keep in mind,
ny material that is not tested is presumed to contain asbestos and must be handled as such by a licensed contractor,again with certain few
rceptions. This is the preferred method and will give you more control in when the work is done as well as cost containment. It is always most
rpedient to get the best survey you can afford as it will eliminate a lot of surprises and additional costs later. In the end it is small money.
Ince you determine which path you plan to follow,then as this is a rental property,all work must be performed by a state licensed asbestos
antractor,who has filed an advanced notification with MassDEP Upon completion,a post removal visual inspection is performed by an independent
onsultant who is licensed by the state as an Asbestos Project Monitor,and who will also perform an air test,to ensure that the airborne asbestos
ber concentration is below the state and federal regulatory limit for determining"clean air".
lased upon the complaint of the health department inspector at this time you need to respond quickly.
) You need to post the basement waming the tenants of the potential asbestos danger and to avoid access until the situation is rectified. They will
of be able to remove any of their belongings either. Please feel free to give them my name and number if they have any questions. You may need
a make arrangements to have an asbestos trained person access the basement in the event any utilities need attention,tripping breakers,water
iroblems heat or hot water problems. The tenants and all other non-asbestos trained people must stay out of the basement.
f you prefer to inspect then these are the steps you need to follow:
!) Retain a licensed asbestos inspector to test all of the materials in the basement for asbestos,from all insulation whether between the rafters or
m a mechanical system,wall and ceiling materials,flooring(other than unpainted concrete),window caulk and glazing,and any other material know
o have ever been made with asbestos,which numbers over 3000 products included manufactured lumber products,according to EPA. This is why
roil need to hire a properly trained and licensed inspector. The inspector does not have to punch holes into the walls or ceilings but the report must
state that any material behind them is considered asbestos until tested.
3) Have the consultant send me a copy of the report within two weeks.
3) If the handyman,who cleaned up the basement and put the bags in the trash used a vacuum cleaner or"shop vac"of any type-in the basement
at any time while the pipe insulation was deteriorating,delaminating or on the floor,then it too must be returned to the site for disposal as asbestos
4/13/2015 1:28 PM
5rthampton Mail-asbestos management
https://mail.google.com/mail/u/0/(fu k2&ik=9954d8032f&view-pt&q...
ste-including all hoses,parts and attachments.
As I explained all materials are considered asbestos until tested,and based on the report from the health department the basement is totally
itaminated with asbestos,and will need full decontamination,including of all tenant belongings stored downstairs. The contractor and consultant
St certify that all tenant belongings are clean and free of asbestos contamination,if they cannot certify that then the material will be disposed of as
restos waste. (NOTE-Usually this means baby clothes and toys:open boxes of small items like Christmas ornaments keepsakes and the like:
ter and cloth products such as books magazines rugs and clothes.-These usually cannot be certified clean and asbestos free by the
ltractor. Also electrical appliances and power tools cannot be cleaned because once asbestos gets into the motor area through the cooling slots,
item cannot be certified as clean because the contractor cannot open up the item and/or would not take responsibility if it failed to function after
;Wing and cleaning it.) The asbestos project monitor who performs the visual inspection will also inspect all of the tenant's belongings that the
tractor has determined could be cleaned,to ensure that they are in fact cleaned.
You can start obtaining the names of some licensed asbestos contractors so that you can obtain price quotes for any asbestos cleanup and
naval needed,based on which materials the survey report determines as asbestos. You will need to give the contractors a copy of the survey
sort so they can estimate properly. You may,at your option,retain your own consultant to perform the post removal visual inspection and air test
you can ask the contractor to find one. They will schedule and pay the consultant and add the cost to the estimate.
You will obtain the waste disposal records from the contractor in 30 to 40 days following completion of the work,at which time you will forward a
)y of those records to me as well. If you do obtain the waste disposal records within that timeframe,then in accordance with USEPA Asbestos
gulations,you need to let me know and I will contact the contractor
OR-
:au prefer not to inspect:
Alternatively you can hire an asbestos contractor to remove all damaged materials as described in 2,above,from the basement,decontaminate
tenant belongings and dispose of those that they cannot be certified as clean,have an asbestos project monitor inspect the basement to ensure
it it and all tenant belongings remaining are clean and perform an air test showing results that comply with state and federal post removal clean air
tuirements. You will then send all of the documentation generated as a result of the clean-up to me within 2 weeks,followed by the waste
iposal records within 40 days.
either event I will issue to you,at your request,an emergency waiver of the ten working day notification period to expedite the cleanup. I will need
3 name of the contractor,the approximate amount of each type of asbestos material to be removed,and the day they will start,the owner's name
dress and phone number and a contact name and a phone number.
order to obtain names and numbers of asbestos contractors and consultants(inspector and monitors)call the State Dept.Of Labor Standards in
Wingfield 413-781-2676,as they issue all asbestos licenses.
ith regards to the handyman-you should contact the State Department of Labor Standards and speak with one of the inspectors regarding what
ould be done to monitor his health because of his handling of asbestos,which I if he did not have the proper training,proper medical monitoring or
oper respirator can be a serious problem.
ease read through the attached regulations and give me a call to discuss any questions you may have,I'm sure one or two,or if you have
restions on the inspection and cleanup procedures and to obtain the emergency waiver number to expedite the clean-up.
lob-
Sob Shultz
ob Shultz
.assDEP
36 Dwight Street
pringfield,MA 01103
13-755-2210(office)
13-784-1149(fax)
obert.Shultz @state.ma.us(e-mail)
4/13/2015 1:28 PM
>rthampton Mail-asbestos management
https://mail.googl e.com/mai I/u/0/?ui=2&ik=9954d8032f&view—pt&q...
a information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged
terial. If you are not the intended recipient,please do not retransmit ordisseminate. If you believe that you have received this email in error please
tact me and delete the material from your computer.
ow MassDEP on Twitter hap//twitter com/MassDEP
scribe to the MassDEP e-newsletter mass.govl deplpublidpublicationslenews.htm
it our web site massgovldep
ease Note: At the end of April 2013,the MassDEP Web site changed,as we became part of the Executive Office of Energy&Environmental
airs'portal Web site.This change is the result of Governor Patrick's IT consolidation plan,which seeks greater operational efficiencies and
It-effectiveness through centralization of our information technology systems.To learn more about the changes,how they affect your use of the
a and your links/bookmarks to MassDEP,and to see a short preview,please visit the MassDEP homepage at http:l/mass gov/dep.Thank you.
� MassDEP Asbestos Regulations effective 6-20-14.pdf
1364K
imith<esmith @northamptonma.gov>
Shultz,Robert(DEP)"<robert:shultz @state.ma us>
Menidith O'Leary<moleary@northamptonma.gov>.Heather Mcbride<hmcbride @northamptonma gov>
ranks Bob]
1 Smith
.area text rme,1
imund Smith
fialth Inspector
arthampton Health Department
12 Main Street,Northampton MA 01060
13)587-1339
egular Schedule:Monday 8 Wednesday,8-4:30,Thursday 8-12 noon.
Fri,Apr 10,2015 at 3:56 PM
dR,Robert(DEP)<robert.shultz @state.ma.us> Fn,Apr 10,2015 at 4:30 PM
Ed Smith<esmith @northamptonma gov>
hank you] With our reduced staffing and my gimpy condition we rely on the local inspector more and more. I appreciate the referral. I think they
ill comply and it should work out nicely
II keep you in the loop as things develop.
lave a nice weekend.
Bob-
:rem:Ed Smith[mailto:esmith @northamptonma goy]
lent: Friday,April 10,2015 3:57 PM
ro:Shultz,Robert(DEP)
Lc:Merddith O'Leary; Heather Mcbride
Subject:Re: asbestos management
cummiedhdde l
_y of Nor Lrampfon E-mail : a psbiic record except wle- -ails under ne of the spedi rio star et
4/13/2015 1:28 PM
r
Northampton Health Department
212 Main Street
Northampton, MA 01060
(413)597-1214
op c
�- `� i
Date y/ri s
CT -
tot b
(200038
C I1r;5.4»por I l l2QGr»a;(,c o v t
Inspection Form K2c {o "F' is?‘"' A`*-`
State Sanitary Code 105 CMR 410.000:
Chapter II, Minimum Standards of Fitness for Human Habitation
Time -3:-3.) am/S #Occupants
Z ,v t,nnaren<6 Years 0
Occupant flame CHKr ST(I*ov(rel 10/PaR.,12hone if iGo - S10 — Z?StC
Address 6p2 C.L3 EST a- / City/Town Apt ft
Owner Name$-N3OtCc 7KQST phone# lei3- S`W-y - 02_00
Owner Address TO -6o7e ?9? City/Town Zip Code or Cf e
Inspector -E.Q .5.4.. , r..0 Title -
-if violation
Observed
i or
enr
Type of violation
Possible Code
Sealants/
-if violation
Observed
Rea Paryibk
Party
Description
for,
Locks,
Or
ors,..,„
I&
cb
On
striker mechanism l4 or more units)
Posting,
480
ID,Exit signs/emergency lights
Handrails,
481,483 484
steps,doors,windows roof-maintenance
Weather
500,503
tight elements
Rubbish
501
-storage and collection
Yard
600,601
maintenance-trash,debris,vegetation
Maintenance
602
V
tr
of area
Doors,lights,
500
windows—weather tight,maintenance
Egress
501,500
—means,obstructed,safe
Handrails
450,451,452
—provided,maintenance
Lights
503,500
&
n
Floor,
254
walls,ceiling-maintenance
Railings,
500
stairs
Doors
503,500
windows—weather tight,maintenance
501,500
Location(Circle): Front Rear Middle Floor Level of Unit
Refrigerator,
sink,stove,oven-good repair,impervious
and smooth
Floor,
100
walls,ceiling-maintenance
Outlets,lights
500
Windows,
251
screens—weather tight lock,maintenance,
provided
Non
501,480,500,
551
im
-absorbent floor
Floor,
504
walls,ceilings
Outlets,
500
lights
Windows
250
screens-lock,weather tight,maintenance,
provided
501,480,500,
551
CITY of NORTHAMPTON
PUBLIC HEALTH DEPARTMENT
BOARD OF HEALTH MEMBERS: Donna Salloom, Chair—Joanne Levin, MD Suzanne Smith, MD
STAFF:Merridnh O'Leary,RS Director—Daniel W sick, Inspector—Edmund Smith,Inspector—Jennifer Brown,RN,Nurse
CORRECTION ORDER
Issued under the Provisions of
The State Sanitary Code, Chapter II, Minimum Standards of Fitness for Human Habitation
105 CMR 410.00
April 13, 2015
Standick Trust
Kary Knapp, Clerk
PO Box 797
Northampton, MA 01060
Dear Property Owner/Manager:
An authorized inspection was made by a designee of the Northampton Health Department of your
property located at 62 West Street', Northampton, MA on April 13, 2015.
You are hereby ORDERED to correct these violations within the noted time limit. Failure to comply within
the allotted time period may result in a criminal complaint against you.
You have a right to request a hearing before the Board of Health. This request must be made by you, in
writing, and filed within 7 days atter the violation has been corrected. If you request a hearing, all
affected parties will be informed of the date, time, and place of the hearing, and of their right to inspect
and copy all records concerning the matter to be heard. The petitioner has the right to be represented at
the hearing.
Sincerely,
Edmund Smith, Health Inspector
City of Northampton Health Department
c: MA DEP/Robert Shultz, Occupant
rte_ Cc
Co. ( �t m ¢-wr�J)
l -�'�
ctctej
•
ea
105 CMR 410
State Sanitary
Code
Regulation N
Description
X
Conditions
may
endanger or
impair health,
safety or
well-being
Compliance
Date
Days from
inspection date
Re-
Inspection
Violation
Corrected
Yes/No
ment
353,750
410.353: Asbestos Material
X
Owner's
responsibility
to abate
within 30
days: target
date for
y 1
2015
May 1 18,8, 2015
Every owner shall maintain all asbestos material
in good repair,and free from any defects
including, but not limited to, holes,cracks,tears
or any looseness which may allow the release of
asbestos dust, or any powdered,crumbled or
pulverized asbestos material. Every owner shall
correct any violation of 105 CMR 410.353 in
accordance with the regulations of the
Department of Environmental Protection
appearing at 310 CMR 7.00 and in accordance
with the regulations of the Department of Labor
and Workforce Development appearing at 453
CMR 6.00.
410.750: Conditions Deemed to Endanger or
Impair Health or Safety
(M)Any defect in asbestos material used as
insulation or covering on a pipe, boiler or furnace
which may result in the release of asbestos dust
or which may result in the release of powdered,
crumbled or pulverized asbestos material in
violation of 105 CMR 410.353.
Conditions observed: Iron pipes at ceiling in
basement appear partially covered with
insulation,possibly asbestos;some is in
apparently good condition, but much of what
is in place appears friable and some removed
insulation is piled on floor as if a cleanup from
an earlier date has been interrupted.
Abatement will be accomplished under the
advice of MADEP (see email to you of 4/10/15
from Robert Shultz MADEP and as this is a
rental all work is to be done by licensed
asbestos contractors,licensed asbestos
inspectors,and at completion final inspection
will be by an Asbestos Project Monitor
(independent consultant). Follow all
instructions of MADEP per posting and access
of the basement space until inspection and any
necessary abatement are completed.