Loading...
242 On Site Review 2003 Location Address orjjot#r II L-1 Date j A.) ` Li _.f PERCOLATION TEST(S) Time: Time: I Observation Hole #1 Observation Hole #2 Depth of Perc I / Depth of Perc 1 Start Pre-soak - Start Pre-soak End Pre-soak End Pre-soak Time at 12" Time at 12" Time at 9" Time at 9" Time at 6" Time at 6" Time(9"-6") Time(9"-6") Rate Min/Inch / . Rate Min /Inch 'minimum of 1 percolation test must be performed in both the primary area AND reserve area. SITE \/ SITE ISITE' SITE PASSED r FAILED PASSED _ FAILED._ Performed by ti ' T , T .r Performed by Witnessed by --, (2, . o. I Witnessed by Comments: i ,i I NORTHAMPTON BOARD of HEALTH- Title 5- Site Review Location //,, Ovrner Addressor Lot it i owners �n Date / _ „p .Address Engineer —Iw . ..: Ag. aU• -:rfatiMNIMMEITES Open Water Body �)1 � feet r :. Myra feet ��/T— feet Possible Wet Area ` ' feet EaLFaiaailli feet .,a. Other ,_— feet DEEP OBSERVATION HOLE LOG* Deep Hole#: l 'MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Depth from Soil Horizon Soil Texture Sal Color Soil Mottling Other Surface(Inches) (USDA) (Munsell) (Structure,Stones,Boulders,Consistency,%Gravel) ✓ — I ) pip L IP 17-1 J / / Y7 '' s ��- $mac /a A/ ..- /G lv erf� vs Parent Material(geologic) I I Depth to Bedrock I -7/411 Depth to groundwater. Standing Water in the Hole /r/4.//t I Weeping from PR ,,,...t../7,4/Face I 77 _ C Estimated Seasonal High Ground Water 7 , t/OW'e.. DEEP OBSERVATION HOLE LOG* Deep Hole#: 'MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Depth from Soil Horizon Soil Texture Soil Color Soil Mottling Other Surface(Inches) (USDA) (Munsell) (Structure,Stones,Boulders,Consistency.%Gravel) 7-j , N Parent Materiel(geologic).I I DepBi,,lo Bedrgok. I Depth to groundwater. Standing Water in the Hole Weepingfrom.Pit Face. I Estimated High Ground Water