259 On Site Review 1998 PERCOLATION TESTIS)
Time:
Time:
Observation Hole
#1
Observation Hole
#2
Depth of Perc
Depth of Perc
Start Pre-soak
Start Pre-soak
End Pre-soak
End Pre-soak
Time at 12"
Time at 12"
Time at 9
Time at 9"
Time at 6"
Time at 6"
Time (9"—6")
Time (9"—6")
Rate Min./Inch
Rate Min./Inch
'minimum of 1 percolation test must be performed in both the primary area AND reserve area.
Performed by
Performed by
Witnessed by
I
Witnessed by
Comments:
On-Site Review
itlress or Lot#
D-59 C, F
Owner
HOLE LOG*
AT EVERY PROPOSED DISPOSAL AREA
Address
om
rches)
Soil
Date
I )6 yLf,
T
7
Soil Mottling Other
(Structure,Stones,Boulders,Consistency.%Gravel)
Time_
C
Weather
a.
_
rering Firm
terial(geologic)
Engineer or Sanitarian
Iroundwater. Standing Water in the Hole
on Site Plan
rated Seasonal High Ground Water
nd Use
1.-----,
Slope%
Surface Stones
tetation
ndfomt
i Landscape
Distances from:
Water Body
feet
Drinking Water Well
feet
Property Line
feet
le Wet Area
feet
Drainage Way
feet
Other
feet
)le#:
DEEP
MINIMUM OF TWO
OBSERVATION
HOLES REQUIRED
HOLE LOG*
AT EVERY PROPOSED DISPOSAL AREA
rom
whes)
om
rches)
Soil
Horizon
Soil Texture
(USDA)
Soil Color
(Munsell)
Soil Mottling Other
(Structure,Stones,Boulders,Consistency.%Gravel)
J
C
7-
a.
N
J �
a &t.
i
terial(geologic)
Depth to Bedrock
Iroundwater. Standing Water in the Hole
Weeping from Pit Face
rated Seasonal High Ground Water
)le#:
DEEP OBSERVATION HOLE LOG*
'MINIMUM OF TWO HOLES REQUIRED 1T EVERY PROPOSED DISPOSAL AREA
rom
whes)
Soil Horizon
Soil Texture
(USDA)
Soil Color
(Munsell)
Soil Mottling
Other
(Structure,Stones,Boulders,Consistency,%Gravel)
{SR a'{4
' ••( -R.Ogpth$g