NEE-140 Riverbank Road Weekly Report 4-22-2016 Weekly Monitoring Report To: Sarah I. LaValley Conservation, Preservation and Land Use Planner City of Northampton Office of Planning and Sustainability 210 Main Street, Room 11 Northampton MA, 01060 413-587-1263 slavalley@northamptonma.gov From: Andrew Bohne, New England Environmental, Inc. Jeffrey Dawson, New England Environmental, Inc. Date: April 22, 2016 Project: 140 Riverbank Road Restoration Northampton, MA DEP Number # 246-0687 NEE Project Number – 15-4680 RE: Weekly Monitoring Report Week Ending 4/22/2016 The following activities where completed this week for 140 Riverbank Road. MONDAY APRIL 18, 2016 Scapes Building and Excavation (Scapes) began constructing the staircase and landing on the bank, to connect to the proposed dock (pending Chapter 91 License approval). Scapes put the footings and stringers for the stairs and landing in place. www.neeinc.com 2 (Photo showing the area where the staircase and landing will be) TUESDAY APRIL 19, 2016 Scapes Building and Excavation (Scapes) continued constructing the staircase and landing on the bank, to connect to the proposed dock (pending Chapter 91 License approval). Scapes finished putting the stringers and handrail posts in. Scapes began to put down the landing decking and the staircase treads and risers. (Photo showing the existing asphalt in the driveway being saw-cut in preparation of digging the trench for the pipe connecting the new pump tank to the new septic field) WEDNESDAY APRIL 20, 2016 Scapes finished putting the treads and risers on the staircase and began constructing the hand railings. www.neeinc.com 3 (Photo showing the new pipe out of the septic pump tank, across the driveway into the new septic field on the north side of the cottage) THURSDAY APRIL 21, 2016 Scapes finished constructing the staircase and landing. The hand railings were put in place and some final structural support beams were placed underneath the structure. (Photo showing the new staircase from the top of bank.) www.neeinc.com 4 (Photo showing the new staircase from the constructed landing.) ANTICIPATED TASKS FOR THE WEEK ENDING 4/29/2016 a. Re-grade back and side yard. b. Re-seed lawn areas. Please let me know if you have any question related to the above report. Sincerely, Andrew Bohne, RLA Vice President New England Environmental, Inc. Email: abohne@neeinc.com Cell: 413.687.1454 cc: Meredith Borenstein (NEE) Scott Fisher (NEE) Kim Urban (Home Owner) Jerry Zanarini (Claims Adjuster) Tim Kasulinous (Tim’s Tree Service) John Blowers (Scapes) Mike Gordon (Scapes)