Loading...
96 Septic Compliance Perc Tests & Plans P. B. Hatch Consulting Engineer 57 Munn Road, Monson, Massachusetts 01057 (413-267-3696) Transmittal To: Peter McErlain - Health Dept., City of Northampton From: Paul Hatch Subj: 96 Dunphy Drive Date: February 25, 1999 Enclosed please find: MAR I 1999 Item # Quantity Description 1 1 Certificate of Compliance NOTE: On September 24, 1998, I inspected the work completed through that date by the contractor constructing the repairs for the 96 Dunphy Drive site. Work completed included all work as shown on the plans prepared by us as revised in our August 14, 1998 drawings, except for final fill over the leach field to finish grades shown on the plans. We understand that the final filling and grading was completed as shown on our August 14 1998 revision. cc: Mr. David Bickford No. FORM 11 - SOIL EVALUATOR FORM Page 1 of 3 Date: April 2T 98 Commonwealth of Massachusetts Northampton , Massachusetts Soil Suitability Assessment for On-site Sewage Disposal Performed By: Paul B. Hatch, PE Witnessed By: Peter McErlain Date: April 22. '98 Loca on Address or 96 Dunphy Drive Lot New Construction Repair xxx Owners Name David Bickford Address,and 96 Dunphy Dr.,Northampton 01060 Telephoner 413-586-3662 Office Review Published Soil Survey Available:No Year Published 1981 Yes XXX Publication Scale Drainage Class A Soil Limitations 1:15,840 Soil Map Unit HgA Surfrcial Geologic Report Available:No XXX Yes Year Published Publication Scale Geologic Material(Map Unit) Landform Terminal Moraine Flood Insurance Rate Map: Above 500 year flood boundary: No Yes XXX Within 500 year flood boundary: No Yes Within 100 year flood boundary: No Yes Wetland Area: National Wetland Inventory Map(map unit) Wetlands Conservancy Program Map(map unit) Current Water Resource Conditions(USGS): Month Range: Above Normal Normal Below Normal Other References Reviewed: 55425901 N N.outbreok . . C . \\ shed \... .`. . . N. .N Perc. loc. • 1 '95r . 11/4-7,:surfoce 9'. 10 I \ N 1 . �. Deep •ole \ . . • .9 S • •- • I I• \` • `\,-,` • `1 96 • I • `` • ``` --J7 • • rB.M, ssill -= 100.00 1 II 2)\ 1 I edge of road Dunphy Drive FORM 11 - SOIL EVALUATOR FORM Page 2 of 3 Location Address or Lot No. 96 Dunphy Drive On-site Review Deep Hole Number 1 Date: 4/22/98 Time 9:45 Weather: Sunny Location (identify on site plan) Land Use home recreation Slope (%) 2 Surface Stones None observed Vegetation lawn, bordering 8" uce trees Landform terminal moraine Position on landscape (sketch on the back) Distances from: Open Water Body > 100 feet Possible Wet Area > 100 feet Drinking Water Well >100 feet Drainage way >100 feet Property Line >40 feet Other DEEP OBSERVATION HOLE LOG* Depth from Surface(inches) Soil Horizon Soil Texture (USDA) Soil Color (Munsell) Sail Mottling Other (Structure,Stones,Boulders, Consistency, % Gravel) 18"-30" 30"+ Ap B1 B2 C L5 S LS SS 2.5Y3/2 2.5Y4/4 2.5Y612 2.5Y611 no no no 7.5YR5/8 grassroots fill likely original Bw mottling @ 34">5% 'MINIMUM OF 2 HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Parent Material(geologic) Depth to Groundwater. Standing Water in the Hole: Estimated Seasonal High Ground Water: 34 inches Dep h to Bedrock:not found Weeping from Pit Face. 50" tbreak shed Pert. loc. �%Csur/ace 9 Deep Rle T B.M. sill =100.00 \�S .9y 96 -97 edge of road Dunphy Drive FORM 11 - SOIL EVALUATOR FORM Page 3 of 3 Location Address or Lot No. 96 Dunphy Drive, Northampton Determination for Seasonal High Water Table Method Used: Depth observed standing in observation hole inches Depth weeping from side of observation hole inches X Depth to soil mottles 34 inches (deep hole) Ground water adjustment feet Index Well Number Reading Date Index well level Adjustment factor Adjusted ground water-level Depth of Naturally Occurring Pervious Material Does at least four feet of naturally occurring pervious material exist in all areas observed throughout the area proposed for the soil absorption system? yes If not, what is the depth of naturally occurring pervious material? Certification I certify that on July 27.1995 I have passed the soil evaluator examination approved by the Department of Environmental Protection and that the above analysis was performed by me consistent with the required training, expertise and experience described in 310 CMR15.017. Signature Date April 22, 1998 35425903 FORM 12 - PERCOLATION TEST Location Address or Lot No. 96 Dunphy Drive COMMONWEALTH OF MASSACHUSETTS Northampton Massachusetts Percolation Test* Date: April 22. 1998 Time. 9.46 Observation Hole # one Depth of Perc 47" Start Pre-soak 9:46 End Pre 10:06 -soak Time at 12" 10:06 Time at 9" 10:36 Time at 6" 11:29 Time (9"-6") 53 minutes Rate Min./Inch 18 minutes *Minimum of 1 percolation test must be performed in both the primary area AND reserve area. Site Passed X Site Failed Performed By: Paul B. Hatch, PE Witnessed By: Peter McEriain Comments: Only one test conducted, this is a repair 35425904 III PERCOLATION TEST(S) Time: 1 613-c- 1 Time: Observation Hole #1 Observation Hole #2 Depth of Perc Li /'7 4 Depth of Perc Start Pre=soak Start Pre-soak End Pre-soak End Pre-soak A (_I Time at 1T Tone at 12' /6 I , I . Time at 9' Time at9- /0 /3c Time at 6' Time at 6' I°, S^.7) Time(9'-6•) �7 1 Time(9'-6') _ Rate Min./Inch l Rate Min./Inch /t �� icz (Ni ti„,—, _ 'minimum of 1 percolation test must be performed in both the pnmary area AND reserve area. Performed by • Witnessed by rim Performed by w`. Witnessed by 1 Commepts: 5 _ _ /AZ-i..'-n4-t. ly LAJ , 0� P 6_,4 t, (� I On-Site Review i ocauonAddress or Lot# Date / Engineering Firm identity on Site Plan Land Use vegetation Landform Position on Landscape C' 1 yAPF- Owner { Time Engineer or Sanitarian Address Weather Slope% Open Water Body Possible Wet Area feet feet Distances from Dunking Water Well Drainage Way Surface Stones feet Get Property Line Other feet ' feet Ito— 1 Deep'Hole #: DEEP OBSERVATION HOLE LOG* 'MINIMUM OF TWO HOLES REOUIRED AT EVERY PROPOSED DISPOSAL AREA —T R•nei boo h . xi b - -1 ca +o I Iloruon / - Sail Texture ((UUSDAI d-3 Soil Color n nsJ . S1 3 - - Sail Motllmq Other rr.snre Stones BOuIders C f1.o„A 2 ^ /_-r Qi—C._ , Parent Material(geologic) Depthto gear, k I 1 Depth to groundwater. Standing WaYerli 1¢e Hoo Weeping from Pit Face �rl " VV - Estimated Seasonal Highh p Wal u ter. (p � Deep ole ft: DEEP OBSERVATION HOLE LOG* 'MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA � Soil Horizon ace InOrev Soil Texture Soil Cnlo —' (USDA) IMunsell; Soil Mottling Other (Structure. Stones. Boulders Co srsteecy :sr• I • • Parent Material(geologic)') Depth to Bedrock I _ _ _ Depth to groundwater Standing Wat r in the Hole I Weeping from Pit Face � '^ Estimated Seasonal High Ground Water CALCULATIONS 1. DESIGN CONDITIONS: 1.1 Number of bedrooms 1.2 Garbage grinder, 1 = no, 2 = yes a DESIGN CRITERIA 4 units 1 entry 2.1 Single family dwelling, 110 gallons per day 110 gpd 2.2 Observed percolation rote 18 min./inch 2.3 Sail textural class: 1= S & LS, 2=SL & L, 3=SiltyL, 4=C, & SCL 3 3. DESIGN DAILY SEWAGE FLOW number of bedrooms x design rate, minimum 330 gpd 4. SIZE OF TANK 4.1 Northampton minimum size 1500 4.2 Per 310 CMR 15.223(a)(a), minimum size tank 1500 4.3 Tank size adjustment for garbage grinder per 310CMRI5.223(I)(c) design flow x 200% (if garbage grinder only) 440 TANK SIZE SELECTION (two comportment): 1500 440 gpd 5 SOIL ABSORPTION SYSTEM Absorption bed 5.1 At percolation rate, effluent lading rote per 310CMR15.242(1) 5.2 Width between distribution tines (max = 6') 'A' 5.3 Number of distribution lines in bed 5.4 Width of bed 'B' 5.5 Length of bed 5.6 Area of bed 5.7 Increase for garbage grinder by 50% (310CMR15.240(4)) 5.8 Total length of bed required 5.9 Length of pipe in bed, minimum 5.10 Area of absorption system (3I0CMR15.252) gallons gallons gallons gallons 0.34 gpd/sq.ft. 4 feet 'A' 6 ea. 24 feet 'B' 54 feet 1296sq. ft. no 54 feet 'C' 50 feet 'D' 1296 sq. ft. NOTE: "A" = 4 ft. "6" = 24 f . "C" = 54 ft It. distance = 150 x slope 2% slope finish grade SOIL COVER 4" dia perforated pipe . 1 min C" soil horizon existing soil slope = y/x (max 1/3) 15' min. y slope measured from this pt. m n. 2' of 1/8" to 1/2" washed stone 12" (minimum 6" below pipe) 3/4" to 1-1/2" washed stone fill, excavated material, & to bring to min. grade, see CONSTRUCTION NOTES. BED DETAILS scale: not to scale CONSTRUCTION NOTES 1 Existing septic tank location unknown, location shown on plans is approximate, use care when travelirg over area. 2. Place end caps on end of distribution pipe laterals 3. Contractor to notify Engineer no less than 24 hours before pipe, tank & "D" box are buried with stone. 4. Contractor to obtain two "ties" from each pipe end, "D" box & tank to house and provide to Engineer for "as built plan". 5. Contractor to remove all soil to top of "C" horizon from leaching area, before placement of fill and stone for bed, contractor to scarify soil. Contractor to minimize travel with construction equipment over prepared leaching area. 6. After removal of "A" and "B" horizon soli, if unsuitable soil is found, contractor to excavate unsuitable soil and fill with clean soil meeting requirements of 310 CMR 15.255(3) to elevations indicated on plans 7. If contractor in doubt about construction methods or details, call engineer a at 413-267-3696 between 8: 00 AM and 5:00 PM Monday thru. Friday. 8. Perforated and solid pipe as listed 310CMR15.251 as amended by DEP letter of Jan. 20, '96. Grade of pipe in leach field shall be .0051/1' p"% mum 3 HMV 1111 Wrier Enclose with fl 1/4" bird screen`WI over end sch. 40 solid steel pipe VENT DETAIL scale: not to scale finish surface perforated pipe i end of distribution line PAUL q " HATCH T SITE INVESTIGATION DATE OF TEST April 22, 1998 SURFACE ELEV. PERC. HOLE = 95.10 ELEV. BOTTOM OF PERC. HOLE = 91.18 T.B.M. = 100.00, HOUSE SILL @ SEWER PIPE PERC. RATE = 18 MIN. PER INCH ANNUAL HIGH GROUNDWATER 92.27 ven 4" perforated pipe 4" solid pipe From septic tank lift pump distribution box set level BED LAYOUT scale: not to scale DETAILS Repair On—site Sewage Disposal System 96 Dunphy Drive Northampton, MA prepared for David Bickford 98 Dinphy Drive Northampton, NA 01.080 scale: 1"=20' date:April 22. 1998 P. B. Hatch Consulting Engineers _ 57 MUNN ROAD MONSON, MASSACHUSETTS 2 oft / T contour ...outbreak existittg., Proposed contour r—fence N Perc. lac?e N surface Vent existing septic tank op of tank 0\95.39 .. m Deepo L:_ fi E7_2— pump out, the break — — — — down concrete ells of � I existing tank th'n bury existing invert on site outside .rea of out 96.75 new soil absorpi✓ en sys. • T T.B.M. sill =100.00 96 // new 'b" box New 1500 gc septic tank edge of road Dunphy Drive 0+25 0+50 0+75 100+00 125+00 Remove existing garbage grinder 100 98 96 94 92 ?..0 L HATCH 2gmo Remove portions of existing leach field t F��" in new leach trench area and replace �D" " with clean soil meeting 310CMR15.255(3) ?ment, remove existing sewer pipe )le in wall with concrete, cut new conc. and re—plumb building pipe as needed for higher invert. GRAPHIC SCALE 0 20 30 4C Plan & Profile REPAIR On—site Sewage Disposal System 98 Dunphy Drive Northampton. MA prepared tor David Bickford Northamptooa MAC 01080 scale: 1"=20' date:April 1998 P B. Hatch Consulting Engineers 57 MUNN ROAD MONSON, MASSACHUSETTS of 2 Proposed grade 4" perforated pipe s=0.005, 1, J plpedn. 0 m n �e-0.00 \\ Existing grade 0 -o - C O C '�.�j C .c � / h N C CC O )0 c 3 n Q) °, Z _. d > c > Remove "A" & °B" soil see sht. 2 or 2 note 6 0+25 0+50 0+75 100+00 125+00 Remove existing garbage grinder 100 98 96 94 92 ?..0 L HATCH 2gmo Remove portions of existing leach field t F��" in new leach trench area and replace �D" " with clean soil meeting 310CMR15.255(3) ?ment, remove existing sewer pipe )le in wall with concrete, cut new conc. and re—plumb building pipe as needed for higher invert. GRAPHIC SCALE 0 20 30 4C Plan & Profile REPAIR On—site Sewage Disposal System 98 Dunphy Drive Northampton. MA prepared tor David Bickford Northamptooa MAC 01080 scale: 1"=20' date:April 1998 P B. Hatch Consulting Engineers 57 MUNN ROAD MONSON, MASSACHUSETTS of 2