Loading...
12 Septic Plans & Certificate of Compliance 2003 Timothy E. Maginnis R.S. Registered Sanitarian 70 Montague Road Westhampton, MA 01027 Northampton Board of Health City Hall - Main Street Northampton, Ma. 01060 Attn: Peter McErlain Health Agent Re: 12 Birch Lane - Pump chamber replacement July 23, 2003 Dear Mr. McErlain; As we discussed, I have enclosed a copy of a pump chamber replacement plan and an Application for a Disposal System Construction Permit (REPAIR) for your review and approval. On behalf of Marylynn Salmon and Joseph O'Rourke of 12 Birch Lane in Northampton I am requesting your Board's approval to replace (only) a pump chamber and sewage pump. This system is approximately 13 years old and the existing chamber is not water tight now and may be decaying due to its age. The existing sewage pump is also older and pumps intermittently or not at all. Upon your approval, a new pump chamber and sewage pump will be installed in accordance with the State Sanitary Code Title-5 and all local regulations. If you have any questions or you would like any additional information please contact me. Very truly yours; TimotriyB;M ginijis RS. 1.4 iSred.i. NORTHA1dPTDN-1 Marlmrs,Length•0 feet SALMON/O'ROURKE- 010.18'32.3"N, 072 41'01.7"W Name: EASTHAMPTON Date:7/23/103 Scale: 1 inch equals 2000 feet Location: 042° 18'28.7" N 072°41'15.4" W Caption: SITE: 12 BIRCH LANE NORTHAMPTON,MA. FOR; SALMON/O'ROURKE Copyright(C)1997,Maptech,Inc. PUMP CHAMBER CALCULATIONS SITE : 12 BIRCH LANE - NORTHAMPTON, MA. FOR: MARYLYNN SALMON / JOSEPH O'ROURKE (413) 586 - 9388 DATE: JULY 23, 2003 1000 GALLON PUMP CHAMBER (SEPTIC TANK) OUTSIDE DIMENSIONS @ ( 8.5'L x 5.33'H x 4.833'W ) WALLS =3" (.25') BOTTOM = 3" (.25') TOP=4" (.33') DOSING FREQ: SANS, LOAMY SAND = 4 DOSES PER DAY = 82.5 GPD DESIGN: 83.93 GALLONS/DOSE WITH APPROVAL OF BOARD OF HEALTH FLOAT # 1: = ABOVE TANK BOTTOM - SET @ 4" FLOAT # 2: = VOLUME PUMPING- 8.0'L x 4.25'W x .333' (4.0") = 11.22 CU. FT. x 7.48052 = 83.93 GALLONS / DOSE - SET @ 8.0" FLOAT # 3 = HIGH WATER ALARM SWITCH - SET @ 12" 8.0'L x 4.25'W x ..333' = 11.22 CU. FT. x 7.48052 = 83.93 GALLONS RESERVE AREA AFTER ALARM 8.0'L X 4.25'W x 3.58' = 121.72 CU. FT. x 7.48052 = 910.53 GALLONS AND: 910.53 GALS x 330 GALS. / DAY = 2.76 DAYS RESERVE AFTER ALARM. I 1000 GALLON PUMP CHAMBER - BOUYANCY CALCULATIONS SITE: 12 BIRCH LANE - NORTHAMPTON, MASSACHUSETTS FOR:MARYLYNN SALMON / JOSHEP O'ROURKE DATE: JULY 23, 2003 WEIGHT OF 1000 GALLON TANK = WT(tank) Sides: ( 8.5'L x 5.33'H )2 = sq. ft. x 0.25' = 22.65 cu. ft. Top/Bottom: (8.5'L x 4.83'W )2 = 82.11 sq. ft. x .333' = 27.34 cu.ft. Ends: ( 4.83'H x 5.33'W )2 = 51.49 sq. ft. x 0.25 = 12.87 cu. fl. So: 22.65 cu. ft. + 27.34 cu.ft. + 12.87 cu. ft. = 62.86 cu. ft. Then: 62.86 ft. x 150 Ibs/cu. ft. (cement) = 9,4291bs. = WT(tank) VOLUME OF 1000 GALLON TANK OUTSIDE DIMENSIONS: ( 8.5'L x 5.33'H x 4.83'W ) = 167.31cu.ft. 167.31 cu. ft. x 62.43 Ibs./cu. ft. 1WT(water)J = 10,445 Ibs. Now: 9,429 Ibs. WT(tank) < 10,445 Ibs WT(water) THEREFORE: COUNTER WEIGHTS ARE NEEDED TO SECURE THE PROPOSED 1000 GALLON TIGHT TANK(septic tank) (3 x 3' x 3') concrete blockls each corner UMP MANHOLE 5 REBAR Submersible Sewage Pumps 3886 APPLICATIONS Specifically designed for the following uses: • Homes • Farms •Trailer courts • Motels • Schools • Hosptitals • Industry SPECIFICATIONS Pump: • Solids handling capabilities: 1'/ maximum. • Discharge size:2"NPT. • Capacities: up to 140 GPM. • Total heads: up to 26 feet TDH. • Mechanical seal:carbon- rotary/ceramic-stationary 18-8 stainless steel metal parts, BUNA-N elastomers. •Temperature: 160°F(71°C) maximum. • Fasteners:300 series stainless steel. • Capable of running dry without damago to components. Motor: • Single phase: %HP, 115 or 230 V,60 Hz, 1750 RPM Built-in overload with automatic reset •Three phase: % HP 208/230 V,460 V, 60 Hz, 1750 RPM. Class B insulation, overload protection must be provided in starter unit. •Shaft:Threaded,400 series stainless steel. 12 • Bearings: Ball bearings, upper and lower. • Power cord: 15 foot standard length (optional lengths available). Single phase: 16/3 STO with 3-prong plug. Three phase: 14/4 STO with bare leads. On CSA listed models,20 foot length SJTW and STW are standard. FEATURES Impeller: Cast iron, semi- open, non-clog with pump out vanes for mechanical seal protection. Balanced for smooth operation. Bronze impeller available as an option. METERS FEET 10 0 Casing: Cast iron volute type for maximum efficiency. 2"NPT discharge adaptable for ALS10-20 slide rail systems. Mechanical Seal: Ceramic vs. carbon sealing faces, stainless steel metal parts, BUNA-N elastomers. Shaft:Corrosion-resistant stainless steel.Threaded design. Locknut on three phase models to guard aganst cumponenl ddmaye on accidental reverse rotation. Motor:Fully submerged in high grade turbine oil for lubrication and efficient heat transfer. Designed for Continuous Operation: Pump ratings are within the motor manufacturer recommended working limits, can be operated continuously without damage. Bearings:Upper and lower heavy duty ball bearing construction. Power Cable: Severe duty rated, oil and water resistant. Epoxy seal on motor end provides secondary moisture bai lief In CdSC ul uutei jackal damage and to prevent oil wicking. 0-Ring:Assures positive sealing against contaminants and oil leakage. MODEL 3886 SIZE 11/2 SOLIDS RPM 1750 IMP. DIA.5'/s" 10 10 15 CAPACITY 140 GPM 9MENSIONS 12 dimensions are in inches.Do not use for construction purposes.) 2W 61/4• ROTATION PARTS Item Pad Description No. 1 Impeller 2 Casing 3 Mechanical Seal 4 Shaft 5 Motor 6 Bearings, Upper and Lower I'uvna LiLin 8 0-Ring MODELS PERFORMANCE RATINGS(gallons per minute) Series HP Volts Phase Max.Amp. RPM Solids Wt.(Ibs.) WS0511A WS0512A W50532A W50534A 115 230 208230 13.0 65 3.3 460 16 1750 11/2 60 SEWAGE EJECTOR SYSTEM Sewage ejector system afters ease of ordering and nstallation.A single ordering lumber specifies a complete system designed for most residential and commercial sump and effluent pump applications. Unassembled package includes: Submersible sewage pump, WS0511A or 12A, mercury level control switch A2-5 (115 V). or A2-6(230 V); Basin A7-1801S;Basin cover 48-1822;Check valve A9-2P; Order no.:SWS0511 A(115 V), SWS0512A(230 V). Series No. WS0511A WS0512A WS0532A WS0534A HP v RPM Total Head Ft.of Water 1750 5 138 10 107 15 74 20 40 25 8 13 tI PERCOLATION TEST(S) Time: 1 Time: Observation Hole #1 Observation Hole #2 Depth of Perc '1 G t Depth of Perc Start Pre-soak I i Start Pre-soak End Pre-soak Z End Pre-soak . a Time at 12" Time at 12" D Time at 9" - 5 Time at 9" Time at 6" y Time at 6" Time(9"-6") - Time(9"—6") " ( / Rate Min./Inch Rate Min./Inch 7, 71 - 'minimum of 1 percolation test must be performed in both the primary area AND reserve area. SITE I s iSITE Sflf SITE PASSED? s. FAILED `< P.£,SSED _ FAILED Performed by Performed by Witnessed by Witnessed by Comments: • I NORTHAMPTON BOARD of HEALTH- Title 5- Site Review °Location �I Y�'t/`ta. Addressor Lot#' fi /2 /o3 hand usa 'Ne9etahyori,? p ij5ketih on`bae fe# • I.F't5uifao.e Open Water Betty 'Pessibl Wet Area. -ii feet feet feet feet feel feet Deep Hole#: DEEP OBSERVATION HOLE LOG* 'fr1INIr.:ur.I OF TVO HOLES REQUIRED nT EVERY PROPOSED DISPOSAL AREA Depth from Surface(Inches) Soil Horizon /� Soil Texture USDA)) Soil Color (Monseil) Soil Mottling Other (Structure,Stones,Boulders,Consistency,%Gravel) Ia — I1 i') - 30 jI �,,( A 6 (I( s , .. T h .n;;r,... ____ Parent Material(geologic) i '�"DeFhil$0edroCk'a°I Depth to,groundwater..Standing Watenn llie" 1 'Weeping Fran Pit Face I S,5-- Es ad- Seasonal High'Gtound)W, Deep Hole#: DEEP OBSERVATION HOLE LOG` 'r.II NIL:urj OF NJO HOLES REOUIRED MT EVERY PROPOS D DISPOSAL AREA Depth from Surface(Inches) Soil Horizon Sol Texture (USDA) Sail Color (Munsell) Soil Mottling Other (Structure,Stones,Boulders,Consistency.%Gravel) , .. T h .n;;r,... ____ `ESikna gh'{, ., .._ ., 4" PVC SOLID PIPE EXISTING SEPTIC TANK NEW 4" PVC SOLID PIPE ( AUGUST 20, 2003 ) 4 BEDR00 HOUSE CONCRETE BALLASTS (4 YARDS) NEW PUMP CHAMBER (August 20, 2003) GARAGE NEW 2" FORCE MAIN (AUGUST 20, 2003) '-DRIVEWAY INLET MANHOLE WITH CONCRETE RISER EFFLUENT PUMP MANHOLE ( C" ) WITH PLASTIC RISER AS-BUILT DIMENSIONS 'A' to 'C' = 93' - 0' 'B' to 'C' = 100' - 0' PLAN VIEW SCALE: 1" = 30' EXISTING CONCRETE CHAMBER SYSTEM ( SAS ) AS-BUILT PLAN PUMP CHAMBER ONLY 12 BIRCH LANE NORTHAMPTON, MASSACHUSETTS FORL MARYLYNN SALMON / JOSEPH O'ROURKE TEL; ( 413 ) - 586 - 9388 FORM 3A - CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE Description of Work: X Individual Component(s) _Complete System The undersigned hereby certify that the Sewage Disposal System. Constructed_ Repaired X Upgraded_ Abandoned by: MARYLYNN SALMON & JOSEPH O'ROURKE at: 12 BIRCH LANE - NORTHAMPTON, MA. has been installed in accordance with the provisions of 310 CMR 15.00(TitleS) and the approved design plan/as-built plans relating to the application No. dated: JULY 24, 2003 Approved Design Flow: N/ A PUMP CHAMBER ONLY Installer: TO Designer: Date: AU URA - SEPTIC SOLUTIONS - WESTHAMPTON MA. S. Inspector: The issuance of this permit shall not be construed as a guarantee that the system will function as designed.