Loading...
38-079 (18) 4 r r die 002'7 $ Date Filed File No. ZONING PERMIT APPLICATION (§10.2) - 1. Name of App i --ant: ow �, c � £� �J' Address : D Telephone: Sg (q 3 Al 2 . ' Owner of P operty: .�AnJ( ��O C��G ,J Address : , N Telephone: l 33 5 . Status of Applicant:_zowner Contract Purchaser Lessee Other (explain: ) 4 . Parcel Identification: Zoning Map Sheet# �g Parcel# 7f , zoning District(s) (include erl ) Street Address Required 5 • Existing Proposed Zdnin Use of Structure/Property I rAffit(y -3 3) FG�� 1 S . (if project is only interior work,1 skip to #6) Building height %B1dg. Coverage (Footprint) Setbacks - front - side L: R: —L:—R: - rear Lot size Frontage . Floor Area Ratio . %Open Space (Lot area minus building and parking) Parking Spaces Loading Signs Fill (volume & location) 6. Narrative Descriptionof Proposed Work/Project: (Use additiona sheets if necessary) -ro 8 '4 _ J e _a £ CJ /� T iu S ,Lo s 9! 9'1 i0 of Frt0 JT E1 d 3:�7- -F .4�ni / c~ S Oi(1 o m d N 2 r w to V5 W ( t EEC` 0 0101 . 7. Attached Plans: Sketch Plan Site Plan B . Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowle e. /nl Date: Applicant's Signature : q1,J 4 la m - U - - - - - - -- THIS SECTION FOR OFFICIAL USE ONLY: YoW presented/based on information presented ted -Reason: Special`' Permit and/or Site Plan Required: Pi•n ng Re d: Variance Required' : S gnat of Bu 1 Spector at NOTE: Issuance of a zoning permit does not reliove an applicant's burden to comply Willi all zoning requirements and obtain all required permits from the Board of Health,Conservation commission, Dopartmont of PublicWorks and other applicable permit granting authorities. 1 NORTHAMPTON SEWER DEPARTMENT ! - 125 LOCUST STREET NORTHAMPTON, MA. 01060 SEP 4Iop 586-6950 EXT. 277 Subject : Municipal Sewer Availability Location: Inquiry Made By:_� 1. Date of Inquiry: 13-Z3 Municipal Sewer Main in Front of Location: YES NO f Size/Material/Age of Sewer Main: .S=- S �s'� ArAc IL Depth of Sewer Main��a.5�� Size of Service Connection Required: Comments : A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Sewer Department with a minimum of 5 working days notification. All work shall co form NoSewer Department specifications . aures M. Dost 1 Superintendent of Wastewater Treatment & Collection. cc: Samuel B. Brindis, Director, DPW Peter McNulty, Jr . Assistant Director of DPW George Andrikidis , Assistant City Engineer ,/ Frank Sienkiewicz , Building Inspector C: \WP51\Entrafee