12C-027 13/52 Rag IRFDAgowable Uplift Wind Fora(Olt)
Rail Soon(M 70 so 90 100 110 1 130 ISO 170 200 1 240 300 380 480 1 650 900
3.0 13/52 Rail
3S 13/52 Rag
4.0 13/52 Rail
45 13/52 Rag
5.0 13/52 Rall
5.5 13/52 Rag
6.0 1 13/52 Rtli
6.5 13152 Rag
7.0 13152 Rail
7.5 13/52 Rag
8.0 13/52 Rag
85 13/52 Rail
9.0 13/52 Rag
95 ]3/52 Rail
10.0 33152 Rag
13/52 Rog IRFD Allowable Uplift
Span Ift) Force(ib)
3.0 1764
3.S 1480
4.0 1243
4 5 1101
5.0 960
SS 838
6.0 756
6.5 690
7.0 651
7.5 596
8.0 533
8.5 510
9.0 480
9.S 444
10.0 402
�I
13/52 Rail tone 3 Span Chart
Exposure Wind Ground Snow Load
Speed 0 sf 10 sf 20 psf 304 40 psf 50 sf 60 psf 70 sf 80 f 90 psf
85 6S 6.5 6.5 6.01 5.5 S.0 4.5 4.0 4.0 3.5
100 6.0 6.0 6.0 5.5 5.0 4.5 4.S 4.0 4.0 3.5
110 5.5 5.5 5.5 SS S.0 4S 4.5 4.0 4.0 3.5
Category 120 5.0 5.0 5.0 5.0 5.0 4.5 4.S 4.0 4.0 3.5
B 130 5.0 S.0 1 5.0 5.0 5.0 4.5 4.5 4.0 4.0 3.5
140 4.5 45 4.5 4.5 4.5 4.5 4.5 4.0 4.0 3.5
150 4.0 4.0 4.0 1 4.0 4.0 CO 4.0 4.0 1 4.0 3.5
160 4.0 4.0 4.0 1 4.0' 4.0 40 4.0 -4.0 1 4.0 3.5
Exposure Wind Ground Snow Load
S ed 0 psf 10 sf 20 f 30 p 40 sf 50 sf 60 70 sf LLi�ML
80psf 90
Exposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 p# 40 psf 50 psf 60 psf 70 psf 80 pst 90 psf
D` 3S
3.5
�' 3S
- z
3.5
3A 30 ' 3 4 .7, ..3.0. 3.0
a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check
b. Wind importance factor perASCE7-05
C. Topographic factor,kzt is 1.0
d. Maximum mean roof height is 30 ft.
e. Average parapet height is Oft
f. Roof pitch Is between 7 degree and 27 degree
g. Maximum solar panel weight is 60 Ibs
h. Height of solar panel is between 2"and 10"to roof
I. Deflection criteria of L/60 per AC428 Section 4.3
j. The wind speeds above are ASO values
It. Mounting Systems,Inc.strongly recommends a maxinoum span of 8 feet,but in any case,not to
exceed the maximum span indicated on the chart
1. The span length applies to a seismic design category E',,or less
M. Maximum cantilever Is L/3
13/52 Rail Zone 25 an Chart
Exposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf
85 8.5 8.0 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
100 7.5 7.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
110 7.0 7.0 6.5 6.0 5.5 5.0 4.5 4.0 4.0 33
Category 120 6.5 6.5 6.s 5.5 5.0 5.0 4.5 4.0 ko 3.5
6 130 6.0 6.0 6.0 5.5 S.0 4S 43 4.0 4.0 3.5
140 5.5 5.5 5.5 55 5.0 4.5 4.s 4.0 1 4.0 - 3.5
150 5.0 5.0 5.0 5.0 5.0 4.5 1 4.5 4.0 4.0 3 5
160 5.0 5.0 5.0 5.0 5.0 4.5 4.5 40 4.0 3.5
Expowre Wind Gro�Snow Load
Spee d 0 sf 10 psf 20 psf 30 psf 40 0 psf 60 sf 70 psf 80 psf 90 psf
Exposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 psf 40 psf 50 f 60 psf 70 psf 80 psf 90 psf
6S.' 6 5�,n° i.6 _ _ SA"', 4S_ „ 4 4 0 '' 3.5..
3110 GO ; .f.0 5,5 # . �, :3.5
S.S :' & :° z
. : 54 5r0 .:.:° SA-f3 5 SA ':45 46 :rte Is
n .-4.$ RS 4: 1 4A 35
140 .,. .'4S 4S `. AS _4.5 .f_ 41- 45, 4S .r. ,- 4.0". 3.5
35d; 4. 4~0 40 m_ 40 4.0 ., ' . 4:A. �4:ff...� 'm 4.0' 3.5
160 44'. '. 4.0 4.0 4.0 1 4.0 1 4;0 4.0 4:0.''" . `4.0' 3.5
a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check
b. Wind importance factor per ASCE7-05
C. Topographic factor,kzt is 1.0
d. Maximum mean roof height is 30 ft.
e. Average parapet height is 0 ft
f. Roof pitch is between 7 degree and 27 degree
g. Maximum solar panel weight is 60 Ibs
h. Height of solar panel is between 2"and 10"to roof
I. Defiection criteria of L/60 per AC428 Section 4.3
j. The wind speeds above are ASD values
k. Mounting Systems,Inc.strongly recommends a maximum span of 8 feet,but in any case,not to exceed the
maximum span indicated on the chart
I. The span length applies to a seismic design category E or less
M. Maximum cantilever is L/3
13/52 Rail Z'ne 1 Span Chart
[Category xposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 psf 40 psf 50 psf 60 psf 70 sf 80 psf 90 psf
85 10.0 8.5 7.0 6.0 515 5.0 4.5 4.0 4.0 3.5
100 10.0 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
110 9.5 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
120 9.0 8.5 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
B 130 8.0 8.0 7.0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
140 7.5 7.5 6.5 6.0 S.5 5.0 4.5 4.0 4,0 3.5
150 7.0 7.0 6.5 6.0 5.5 5,0 4.5 4.0 4,0 3.5
160 7.0 7.0 6.5 6.0 5.5 5.0 1 4.5 1 4.0 1 4.0 35
Exposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 ps 40 psf I 50 p5f 60 psf 70 psf 80 sf 90 psf
Exposure Wind Ground Snow Load
Speed 0 psf 10 psf 20 psf 30 os 40 psf 50 psf 60 psf 70 psf 80 psf 90 psf
85 9.0 8.5 7,0 6.0 5.5 5.0 4.5 4.0 4.0 3.5
100 8.5 8.0 7.0 6.0 5.5 3.0 4.5 4,0 4.0 35
110 7-5 7,5 '; 7.0 0 4.Q a 35_
_._
Category 120 7.0 7.0. 6.5. 6A . 3 5 :S.Q ,s 45 ,. 4 0 _ 4A
D 130 6.5 5.5 6.5� '6.0 ' 'S X50 .. 4Q`" �t0 `. 3.5
140 6.0 6.0 w S-S" 5:0 #5 "4 5 ,.;4.0 41 3.5
150 SS 5.5 53 " 531 4.0 t 4A 3.5.
160 5.5 5.5 1 5.5 1 5.5 1 5.0 1 5 .1 4S j 44 A9 . ,.;.315
a. The table above ONLY includes 13-52 rail capacity check.It does not include roof capacity check
b. Wind importance factor per ASCE7-05
C. Topographic factor,kzt is 1.0
d. Maximum mean roof height is 30 ft.
e. Average parapet height is 0 ft
f. Roof pitch is between 7 degree and 27 degree
g. Maximum solar panel weight is 60lbs
h. Height of solar panel is between 2"and 10"to roof
L Deflection criteria of L/60 per AC428 Section 4.3
J. The wind speeds above are ASD values
k. Mounting Systems,Inc.strongly recommends a maximum span of 8 feet,but in any case,not to exceed the
maximum span indicated on the chart
1. The span length applies to a seismic design category E,or less
M. Maximum cantilever is L/3
w
STRU(TURALENGINEERS
July 21,2014
Mounting Systems,Inc.
820 Riverside Pkwy
Sacramento,California 95606
TEL:(855) 731-9996
FAX:(916)287-2269
Attn.:Mounting Systems, Inc.-Engineering Department
Re: Engineering Certification for the Mounting Systems, Inc. 13/52 Rail Alpha+System
PZSE,Inc.-Structural Engineers has reviewed Mounting Systems, Inc.'s 13/52 rail span charts,rail allowable
uplift wind force and performed rail component capacity check including L foot bracket,end clamp and mid-
clamp.All information,data and analysis contained within the Mounting Systems,Inc.rail span charts are
based on,and comply with Mounting Systems,Inc.'s Alpha Engineering and Technical Data and the following
codes:
1. Minimum Design Loads for Buildings and other Structures,ASCE/SEI 7-05
2. 2009 International Building Code,by International Code Council,Inc.
3. 2005 Aluminum Design Manual,by The Aluminum Association
4. AC428,Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic(PV)Panels,
November 1,2012 by ICC-ES
This letter certifies that the loading criteria and design basis for the Mounting Systems,Inc. 13/52 rail span
charts,rail allowable uplift wind force table and rail components capacity check are in compliance with the
above document and codes.
If you have any questions on the above,do not hesitate to call.
Sincerely,
PAUL K.
IACHER
RUCTURAL
Paul Zacher,SE-President No.50100
GJSTE
'rSbNALE
FJCP 6/70!`2016
8150 Sierra College Boulevard,Suite 150 • Roseville,CA 95661 • 916.961.3960 P • 916.961.3965 * www.pzse.com
2/20!2015 Power Optimizer SolarEdge
Feature highlights of SolarEdge Power optimizers:
• Per-module Maximum Power Point Tracking(MPPT)
• Superior efficiency(99.5%peak efficiency,98.8%weighted hted efficiency)
• Mitigates all types of modules mismatch-loss,from manufacturing tolerance to partial shading
• Designed for extreme environmental conditions
• 25 year reliability and warranty
• Advanced,real-time performance measurement
• Automatic module DC voltage shut-down for installer and firefighter safety
• Embedded by module manufacturers,or connected by installers to c-Si and thin-film modules
SolarEdge Technologies Inc.®All Rights Reserved Careers l Contact l Subscribe l RSS Feeds l Terms&Conditions
http://www.solarecige.us/groups/us/powerbox-power-optimizer 2/2
2/2012015 Power Optimizer i SolarEdge
Monitoring Portal Login I Alliance Program English(North America) Search
Follow Us
CORPORATE SOLUTIONS PRODUCTS TO ORDER SERVICE MEDIA
Ad Ad A"
eese� �..4ww
r,.a...
Power Optimizer Inverter Monitoring
Power Optimizer
R.ecommond share is SolarEdge Power Optimizers
The SolarEdge power optimizer is a DC/DC converter which is connected by installers to each PV module or embedded by module manufacturers,
replacing the traditional solar junction box.The SolarEdge power optimizers increase energy output from PV systems by constantly tracking the
maximum power point (MPPT) of each module individually. Furthermore, the power optimizers monitor the performance of each module and
communicate performance data to the SolarEdge monitoring portal for enhanced,cost-effective module-level maintenance.Each power optimizer is
equipped with the unique SafeDCTm feature which automatically shuts down modules'DC voltage whenever the inverter orgrid poweris shutdown.
The MPPT per module allows for flexible installation design with multiple orientations,tilts and module types in the same string. When working with SolarEdge
Inverters,SolarEdge power optimizers automatically maintain a fixed string voltage,allowing installers even greater flexibility with longer strings and strings of different
lengths in order to design optimal PV systems.
The SolarEdge power optimizers are compatible with c-Si and thin-film modules and have a 25 year warranty.
The following power optimizer models are avaiable:
P12rims 1t oWls Add-On Power ODUMizers
Connected by installers to the PV module and compatible with a wide range of modules
Power Optimizer P Model Module Power Module Voc
P300 5300W� � <48V
P400 5400W <80V
P405 s405W <125V
Download datasheet III
P-Series Commercial Power Outbnlzer
Commercial solution connecting two modules per power optimizer
Power Optimizer Model Module Power Module Voc
P600 15600W= _ <96V
P700 5700W` <125V
`Rated combined STC power of 2 modules connected in series.Module of up to+5%power tolerance allowed.
Download datasheet
http:/ANww.solaredge.us/groups/us/powerbox-power-optimizer 1/2
I
solar=ee Single Ph se Inverters for North America
AW
SE3000A-US/SE38 OA-US/SE5000A-US/SE6000A-US/
SE760OA-US/SE1000OA-US/SE1140OA-US
SE3000A-US SE380DA-US SESOOOAjUS SE6000A-US SE760DA-US SE10000A-US SE1140OA-US
OUTPUT
Nominal AC Power Output 3000 3800 5000 6000 7600 9980 @ 208V 11400 VA
10000�240V
5400 @ 2 8V 10800 @ 208V
Max.AC Power Output 3300 4150 6000 8350 12000 VA
5450 C&21av io95o.@zaov
AC Output Voltage Min:Nom.-MaxPl ✓
183-208-229 Vac
AC Output Voltage Min:Nom-Max!`i , ✓ ✓ ✓
211-240-264 Vac
AC Fre uenc Min.-Nom:Max.w 5932-0-24.5(with HI country setting 57;60-60.5) Hz
IIMax.Continuous Output Current 12.5 16 QV !
GFDI 25 I 32 f 42�.240V I 47'5 A
II
1 A
Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yes Yes
INPUT _ _ _.
Recommended Max.DC Powert'i.. .. .. ...
ISM 3750 4750 6250 7500 9500 12400 14250 W
...........
Transformer-less,Ungrounded Yes
. . ..... .....
M .
ax,Input Voltage 500 Vdc
Nam.DC Input Voltage 325 208V/350 240V Vdc
16.5 @ 208V 33 @ 208V
Max.Input Currentul 95 13 18 23 34.5 Adc
.......... 30.5�.240V
Max;Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
Ground-Fault Isolation Detection 600ku Sensitivity
Maximum Inverter Efficiency 97.7 98.2 98.3 98.3 98 98 98 %
CEC Weighted Efficiency 97-5 98 97 5 @ 2018V 97.5 97.5 97 @ 208V 97S %
98. 240 d 97.5 @ 240V
Nighttime Power Consumption <2.5 <4 W
ADDITIONAL FEATURES
Supported Communication Interfaces RS485,'RS232,Ethernet,ZigBee(optional)
Revenue Grade Data,ANSI C12.1 Optional"'
Rapid Shutdown—NEC 2014 690.12 Functionality enabled)when SolarEdge rapid shutdown kit is installedtsl
STANDARD COMPLIANCE
Safety UL17141,UL1699B,UL1998,CSA22.2
Grid Connection Standards IEEE1547
Emissions FCC part l5 class B
INSTALLATION SPECIFICATIONS
AC output conduit size/AWG range 3/4"minimum/16-6 AWG 3/4"minimum/8-3 AWG
DC input conduit size/#of strings/
AWG 3/4"minimum 1-2 strip -6 AWG 3/4"minimum 1-2 strings/14-6 AWG
h y. .'5x1.......J.../.. ......x/1 ...2-5 ......
/ g
Dimensions with Safety Switch 30.5 x 12.5 x 7 37 ' 12.5 x 7.5/ 30 5 x 12.5 x 10.5/775 x 315 x 260 in/
Weight.Dwith Safety Switch 7751 2/23.272 775'x 315 x 191 mro
.. . . ... ...y......... :?/za.7 sB.4/ao.1 Ib/kg
Cooling Natural Convection Fans(userrePlaceable)
. .... .. . .. ......l..
Noise <25 <50 dBA
Min.-Max.Operating Temperature
Range. -13 to+140/-,25 to+60(-40 to+60 version available0)) F/'C
Protection Rating NEMA 3R
lu For other regional settings please contact SolarEdge support
pl Limited to 125%for locations where the yearly average high temperature is ahnve 77"F/75'C and to 13576 fW locations where rt u below 77"yS'C
For detailed infori ahon,miertohtto,ilwvzw.soUmdee.usJf)leapdfs/inverter do oversizing auks tcif
l+i A higher current source maybe used;the inverter will limit its input current to the values stated
IO Revenue grade inverter PIN:SExatuA-USOOONNRZ
pi Rapid shutdown kit P/N:SE1000-RSD-51
-40 version P/N:SE—A-USOOONNU4
SUftSt?Et R •
I
solar - . . •
SolarEdge Single Phase Inverters
For North America
SE3000A-US/ SE380OA-US/ SE5000A-US/SE6000A-US/
SE7600A-US/ SE1000OA-US/SE1140OA-US
•
•
The best choice for SolarEdge enabled systems
Integrated arc fault protection(Type 1)for NEC 2011 690.11 compliance
- Superior efficiency(98%)
— Small,lightweight and easy to install on provided bracket
— Built-in module-level monitoring
— Internet connection through Ethernet or Wireless
- Outdoor and indoor installation
— Fixed voltage inverter,DC/AC conversion only
- Pre-assembled Safety Switch for faster installation
— Optional—revenue grade data,ANSI C12.1
USA-G ERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-T'HE NETHERLANDS-ISRAEL www.solaredge.us
'I
so I a r - • • ze SolarEdge Power optimizer
Module Add-On for North America
P300 / P400 / P405
P300 P400 P405
(for 60-call modules) (for 72&96-cell modules) (for thin film modules)
INPUT
Rated Input DC Power(') 300 400 405 W
Absolute Maximum Input Voltage '
(Voc at lowest temperature) 48 80 125 Vdc
MPPT Operating.Range 8-48 8-80 12.5-105 Vdc
Maximum Short Circuit Current(Isc) 10 Adc
...... . .
Maximum DC Input Current 12.5 Adc
Maximum Efficiency 99,5 %
Weighted Efficiency. 98.8 %
Overvoltage Category 11
OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED T9 OPERATING SOLAREDGE INVERTER)
Maximum Output Current 15 Adc
Maximum Output Voltage 60 85 1 Vdc
OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF)
Safety Output Voltage per Power Optimizer 1 Vdc
STANDARD COMPLIANCE
EMC FCC Port15 Class B,IEC61000-6-2,IEC61000-6-3
Safety IEC62109-1 c II safety),UL1741
RoHS Yes
INSTALLATION SPECIFICATIONS
Maximum Allowed System Voltage 1000 Vdc
Pxxx-2 series 141 x 212 x 40.5/5:55 x 8.34 x iS9 mm/in
Pxxx-5 series
Dimensions(W x L x H) 128 x 152 x 27.5/ 128 x 152 x 35/ 128 x 152 x 48/ mm/in
5 x 5.97 x 1.08 5.0.97.0.37........ S x 5.97 x 1.89
. ....
Weight(including cables) Pxxx-2 series 950/2.1 gr/lb
Pxxx-5 series 770/1.7 9'30'/'
30/2.05 930/2.05 gr/lb
Input Connector MC4 Compatible
.......
Output Wire Type/Connector Double Insulated;MC4 Compatible
Output Wire Length
0.95/3.0 1.213:91 3:9 m/ft
Operating Temperature Range -40-+85/-40-+185 'C/'F
Protection Rating
Pxxx 2 series IP65/NEMA4
Pxxx-5.series IP68/NEMA6P
Relative Humidity 0-100 %
r'I Rated STC power of the module Module of up to+5%Power tolerance allowed
PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V
A SOLAREDGE INVERTER"'
Minimum String Length 8 10 18
(Power Optimizers)
Maximum String Length 25 25 50
(Power Optimizers)
Maximum Power per String 5250 6000 12750 W
Parallel Strings of Different Lengths Yes
or Orientations
of It is not allowed to mix P405 with 1`300/1P4001P6001P700 in one string
71
•
solar - • •
SolarEdge Power Optimizer
Module Add-On For North America
P300 / P400 / P405 •
•
wact�'M
PV power optimization at the module-level
— Up to 25%more energy
- Superior efficiency(99.5%)
- Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading
— Flexible system design for maximum space utilization
— Fast installation with a single bolt
— Next generation maintenance with module-level monitoring
- Module-level voltage shutdown for installer and firefighter safety
USA - GERMANY - I1ALY - FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA www.solaredge.us
EXHIBIT B— CHUSETTS
STATE NOTICES 6ND DISCLOSURES
A. OBTAINING PERMITS. We shall obtain all necessary permits for the installation and operation of the System.
Homeowners who secure their own permits shall be excluded from the state guaranty funds.
B. OUR LICENSES. HOME IMPROVEMENT CONTRACTORS ARE REQUIRED TO BE REGISTERED WITH THE
DIRECTOR OF THE MASSACHUSETTS OFFICE OF CONSUMER AFFAIRS AND BUSINESS REGULATION. FOR
INFORMATION ABOUT CONTRACTOR REGISTRATION REQUIREMENTS, CONTACT THE MASSACHUSETTS OFFICE
OF CONSUMER AFFAIRS AND BUSINESS REGULATION: TEN PARK PLAZA, SUITE 5170, BOSTON, MA 02116,
617.973.8700 OR 888,283.3757,
C. ARBITRATION. Notwithstanding anything to the contrary in the Agreement, the contractor and homeowner
hereby mutually agree in advance that in the event th at the contractor has a dispute concerning this contract,
the contractor may submit such dispute to a private arbitration service which has been approved by the Office of
Consumer Affairs and Business Regulation and the consumer shall be required to submit to such arbitration as
provided in M.G.L. c. 142A. NOTICE: The signatures of the parties below apply only to the dispute resolution
initiated by the contractor. The owner may initiate alternative dispute resolution even where this section is not
separately signed.
VIVINT SOLAR DEVELOPER, LLC CUSTOMER(S):
By. By.
Printed Name, Douglas Yates Printed Name, Joan Payne
Saiesperson No.. 76974
------ By.
Printed Name.
3301 N Thanksgiving Way, Suite 500, Lehi, UT 84043
vivintf s- o a r support@vivintsolar.com I www.vivintsolar.com
Phone: 877.404,4129 1 Fax 801.765.5758
RESIDENTIAL SOLAR POWER PURCHASE AGREEMENT
't+IN dAT I si Kvq,��,4u A-A'[jper kWhj
12/05/2015 4749023 119
CUSTOMER INFORMATION
Ix-,* Joan Payne
(413) 923-8918 jcdpayne@comcast.net PR0,N;Ty OVNL4
Des&0
Qe5 ovo
PROPERTY INFORMATION
54 Burncolt Rd,
Florence Hampshire MA "01062
OUR PROMISES TO YOU
YOUR OBLIGATIONS
DOCUMENTS THE AGREEMENT INCLUDES THE FOLLOWING DOCUMENTS:
• Power Purchase Agreement, including'.
• Exhibit A Notice of Cancellation
• Exhibit B State Notices and Disclosures
• the Customer Packet, and
• the Work Order(s)
mounting
systems
BOM
Item no. Description Weight Quantity add. Items Sum
707-0023 L-foot 11 mm fast attach 0.241 Ibs 56 0 56
702-0207 MEC CS RH 40mm 0.000 Ibs 16 0 16
700-0102 MC 30-40mm-w/Bonding Plate 0.000 Ibs 10 0 10
712-0136 Weeblug Alpha+pa 0.000 Ibs 8 0 8
807-0131 ACC Wire Management Clip 0.000 Ibs 0 0 0
807-0134 Omega Wire Management Clip 0.000 Ibs 0 0 0
712-0148 Rail/Microinverter Attachment-M8x20mm T-Bol 0.000 Ibs 0 0 0
712-0147 Rail/Microinverter Attachment-M8x25mm T-Bol 0.000 Ibs 0 0 0
800-1089 BR 10/48 CS;12ft 13.623 Ibs 8 0 8
800-1085 BR 10148 CS;16ft 13.623 Ibs 2 0 2
706-0057 Splice,external,f.BR 10/48 CS 0.427 Ibs 2 0 2
Total 150.559 Ibs
co
s
a
4
Developer: Page 9 of 9
Date 12/15/2015 MS Version 2.0.34.0
00
3 1
C _
N � :3
U1
Nv�(
O
Ln
Ut
50.00 ft
3.26 R I l l l l l l l l l l l l l l l l l l l l l l l 3.26 R
Ililllllll
l l l l l l l l l l l l l f -'T- T--'T--�h--'T-�-'�--#-�-
1.27 ft _ 1 T __ 1 14444+ 1 1 1 __ 7.27 ft -- — --
3.26 ft
� 3.26 ft
ID0 ft 5D.D0 It
3.00 ft
E:1 Field rl Edges 0 Corner
G
rp �
O (D
N 00
O
W
A 0
O
l0
Alpha'
Q) (D l7
fD O ��
K
� o
r 4�
N � 3
N t„
G va
N
O
r
tr
� D E I I I I I I I I I I I I I I I I I I I I I I I I I 0 shment
L � ( I I I I I I I I I I I I 1 1 1 1 d l Dl 1 1 1 1 1 4
A=GS 10148 12 It[5 It 3.50 in]
B=GS 10148 12 ft 15 It 5.00 In]
C=GS 10/48 12 ft[10 It 10.75 In-
3.31 ft D=GS 10/48 16 It
E=GS 10/4812ft[0ft4.49in]
'o
1n a
C CM
ID O
O
7
N O
W
A
O lD
Alpha'
mounting
systems
Configuration
Fastener capacity
Description L-foot Timm fast attach
Max. pressure load 816 Ibf
Max. suction load -816 Ibf
Max. lateral load 677lbf
fastener distance 16.00 in
Rail
Description GS 10/48
Moment of inertia Iz 0.16 in^4
Moment of inertia ly 0.24 in^4
Resistance moment Wz 0.21 in^3
CL
Resistance moment Wy 0.24 in^3
Cross section area 0.55 in^2
yield stress 21.2 ksi
Modulus of elasticity 10100.0 ksi
Load
Rail Stress Deflection',under load (% A=L/60) Length Load capacity
Roof area (%yield) Rail Cantilever Cantilever Attachment
Field 4.2% 0.7% 4.5 in 12.2%
Edges 4.2% 0.7 % 0.0 in 12.2 %
Comer 4.5% 0.7% 0.0 in 13.1 %
The system was successfully verified.
Notes
• Only the statics of the solar substructure are analyzed.The rails are designed as multi-box girders with
cantilever, and uniform load distribution
• The values for material durability are taken from the technical manual of the manufacturer.
Developer: Page 6 of 9
Date 12/15/2015 MS Version 2.0.34.0
mounting
systems
Module field layout
Module manufacturer Jinko Module length 65.0 in
Module type JKM260P Module width 39.0 in
Module power 260.00 Watt Frame height 1.6 in
Number of modules 9 Modul weight 41.90 Ibs
Module orientation Landscape Overall power output 2.3 kWp
m
s
CL
4 w.
u
ai19 SJ i
Developer: Page 5 of 9
Date 12/15/2015 MS Version 2.0.34.0
` 161WWw
mounting
systems
Load combinations (ASD)
LFK1: Ed=D
LFK2: Ed=D+L
LFK3: Ed=D+(L,or S or R)
LFK4: Ed=D+0.75* L+0.75*(Lr or S or R)
LFK5: Ed=D+(0.6*W or 0.7* E)
LFK6a: Ed=D+0.75* L+0.75*(0.6*W)+0.75*(L,or S or R)
LFK6b: Ed=D+0.75* L+0.75*(0.7*E)+ 0.75*S
LFK7: Ed=0.6* D+0.6*W
LFK8: Ed=0.6*D+0.7*E
max action [lb/ft']
Roof area Pressure Pressure Suction Suction
orthogonal parallel orthogonal parallel
Field 20.870 8.859 -6.885 0.569
�o
s
Edges I 20.870 8.859 -14.200 0.569 °'
Corner I 20.870 8.859 -22.420 0.569
max action per unit length of rail [Ib/ft]
Roof area Pressure Pressure Suction Suction
orthogonal parallel orthogonal parallel
Field 67.850 28.800 -22.380 1.850
Edges 67.850 28.800 -46.150 1.850
Corner 67.850 28.800 -72.890 1.850
Developer: Page 4 of 9
Date 12/15/2015 MS Version 2.0.34.0
mounting
systems
Loads
Snow load
Importance factor II: 1.00
Ground snow load pg= 40.000 Ib/ftZ
Shape factor C,= 0.723
Snow load-flat Pf= 28.000 Ib/ftZ
Snow load-sloped ps= 20.250 Ib/ftZ
Wind load
Basic wind speed v= 100.00 mph
Terrain category B: Urban and suburban areas,wooded areas,or other
terrain with numerous closely spaced obstructions
having the size of single-family dwellings or larger.
Wind Gust Velocity Pressure q= 15.230 Ib/ftZ
t
C.
Roof areas a
Distributed Wind Loading per Base Rail
Pressure [lb/ft] Suction [lb/ft]
Field 24.758 -44.565
Edges 24.758 -84.178
Corner 24.758 -128.743
Dead load
Module area Ati,= 17.60 ftZ
Modul weight GN,= 41.90 Ibs
Dead load gm= 2.427 Ib/ftZ
Developer: Page 3 of 9
Date 12/15/2015 MS Version 2.0.34.0
`,4WE
mounting
systems
Building data
Site data
Country USA IBC 2012
Terrain height 0 ft
Building specifications
Roof type Gable roof
Building length 56 ft 0.00 in
Building width 25 ft 4.52 in
Building height 20 ft 0.00 in
Roof specifications
Roofing Composition shingle Rafter width 2.0 in
Roof pitch 23° Rafter height 6.0 in
Rafter spacing 16.0 in c
a
•c
I �
o-
h
I
c I',
'L
ti
Developer: Page 2 of 9
Date 12/15/2015 MS Version 2.0.34.0
s
mounting
systems
Project Information
Contact
Name 4749023
Street address 54 Burncolt Rd,
City,State,ZIP Florence,MA,01062
Phone
Email
s
CL
Q
°f
� i f
i
Developer: Page 1 of 9
Date 12/15/2015 MS Version 2.0.34.0
DC Safety Switch Notes:
Rated for max operating condition of inverter
NEC 690.35 compliant
"opens all ungrounded conductors U
C A
Notes: SE380OA-US-U Inverter Specs:
CEC Efficiency 98% fnQ
ALL CONDUCTORS AC Operating Voltage 240V Q Egz
Continuous Max Output 16A m-2 Z
SHALL BE COPPER DC Maximum Input Current 13A (D .2
Solar Edge Optimizer Specs: a
CU
P300 DC Input Power 300W
DC Max Input Voltage 8-48V
Design Conditions: DC Max Input Current 12.5A
DC Max Output Current 15A
ASHRAE 2013 Max String Rating 5250W
Highest Monthly 2%DB Design Temp 32.5°C. Module Specs:
9 PV MODULES PER INVERTER=2340 WATTS STC Lowest Min.Mean Extreme DB -22.8°C
1 STRING OF 9 PV MODULES VOC Temp coefficient V/°C Jinko JKM260P-60
Short Circuit Current(Isc) 9.11A
Open Circuit Voltage(Voc) 37.8V o
System Specs: Operating CUrrent{#np} _ 8.4
Max DC Voltage 500V Operating Voltage(Vmp) 30.7V C a
0 0' 8 9 Nominal DC Operating Voltage 350V Max Series Fuse Rating 15A +�
Max.DC Current per String 15A STC Rating(Pmax) 260W /� o
Nominal AC Current 16A Power Tolerance -0/+3% •r'
_ Integral Revenue Grade Meter Compliant
SOLAREDGE with ANSI C12.1-2008
P300 OPTIMIZERS L1 L2 N
SOLAREDGE
SE3800A-US-U g m o v
INVERTER
vO f
K
U
Si°me #LNF222R Z M =
SOLAREDGE 30N240V UNFUSED 200A Z j
DC SAFETV ti * NEMA3 >Z w
SWITCH M OREQUIVALENT It U) y
W W Z 0]
Q K
20A Z Z p
EXISTING SHEET
240V/200A AC NAME:
iL
LOAD-CENTER ?
1 VISIBLE WITH 1-2 POLE 20A M
KN FE 11C ^ SOLAR BREAKER
2 DISCONNECT
L SHEET
NUMBER:
0 PV WIRE IN FREE AIR INTO THWN-2 IN 1"PVC CONDUIT.
KEEP UNDER 2%VOLTAGE DROP.MINIMUM 10 AWG CU O MINIMUM 10 AWG CU WIRE(RATED 90 DEG C)IN 1"PVC
1
WIRE EACH(RATED 90 DEG C).6AWG BARE COPPER EGC CONDUIT.LI,L2,AND NEUTRAL;8 AWG GROUND WIRE.KEE �
OR 8AWG INSULATED COPPER EGC IN CONDUIT. UNDER 1.5%VOLTAGE DROP.
LU
s
U rn
PV MODULE,TYP.MOUNT O c m
TO RAFTERS,PARALLEL
fn ¢�
WITH PLANE OF ROOF o o
L-FOOT WITH CONNECTION m C
O=
FLASHING WITH LL 0
WATERPROOF SEALANT U¢
3 MOUNTING
PV4.0 DETAIL
MID CLAMP DETAIL a
T! STAI.NLE F-
NOT TO SCALE 4 111"MINIMUM
SS STEEL LAG SCREW
=13t2 R-Ibs.
e
v.�-.^w•rc
4W
PV ARRAY TYP. ELEVATION LED 0 0
NOT TO SCALE ® LEVELING FOOT ON COMP MOUNT r
rl
NOT TO SCALE
END CLAMP DETAIL
•ar
NOT TO SCALE
m
w
PERMITTED LEVELING L-FOOT WITH CONNECTION rn
FOOT SPACING J
END CLAMP
m
N
V
J FRAMING BELOW SHOWN ND CLAMP
' DASHED FOR CLARITY
V e
1 I I I PHOTOVOLTAIC MODU LE pV4.0 Of �
I I I I I I END CLAMP V) = y
I I I I I I I I I I I I I F- W
I 1 I I 1 1 I I I I I I PHOTOVOLTAIC MODULE
I I I I I I I I I I
CANTILEVER=L/3 L=PERMITTED SPACING j Z y
OR LESS
I I I I I I I I ul
LU z M
W J Z m
J J V Z
I I I I I I I
I I I I I I I I I I I I I U)NAME:y J
I 1 I I I I I I I I I I ?
SHEET
? z o
I I I I I I I I I I I I
I I I I I I I I I
I I I I I I
I 1 I I I I I I I I I I I ROOF FRAMING U)
H J_
I
L-1 OT WITH MID CLAMP
I I I I i CONNECTION e L-FOOT WITH CONNECTION Z Q
PERMITTED LEVELING PV4.0 o I,LI
MID CLAMP FOOT SPACING L
PORTRAIT MODULES USING SHARED RAILS PV SYSTEM MOUNT DETAIL SHEET
NUMBER:
NOT TO SCALE
MODULES IN PORTRAIT/LANDSCAPE °
It
NOT TO SCALE >
a
m
z
0
0
wm
wm
m
m
o�
A
C
o(n
m Z
O
U)it
°o g O
DO
IN-M
tNa C(U
.50
40,O
N�
n
2
3
O
m
v
U)
x
z
0
m
co
D
C
r
m
C/)
�
OD
I.
m
o
�
O
O
m
D
Z
Z m
r m
z n
INSTALLER:VIVINT SOLAR
'
"
Payne Residence
INSTALLER NUMBER:1.877,4044129
/
P V 2.0
m m
m
ROOF
A m
~
MA LICENSE:MAHIC
m
PLAN
170848
FbrenBcenMA01062
DRAWN BY:KA S-4749023
Last Modified:12/15
015
UTILITY ACCOUNT NUMBER:90693-16015
�w 1—l—,e6
City of Northampton ��� � Q
worwRepartment _ - - v
p, plan fwv
'V 212 Main Street
:2
Northampton, �
hampton, MA 01060 o
I 1 s��
Z
I �m��
„Z
etal —0
I I C LL¢
JUNCTION BOX ATTACHED TO
ARRAY USING ECO HARDWARE TO I
PLUMBING VENT(S) KEEP JUNCTION BOX OFF ROOF 1
I
C! I
PV SYSTEM SIZE:
2.34 kW DC
80'OF 1"PVC CONDUIT I
I FROM JUNCTION BOX TO ELEC PANEL
1 I +f
I Roof Section 1 N
Roof Azimuth:175 n
PV INTERCONNECTION POINT,INVERTER, Roof TiH:23
LOCKABLE DISCONNECT SWITCH,
&UTILITY METER LOCATION I c
TIE INTO METER#63331904
OMP.SHINGLE
1 (9)Jinko JKM260P-60 MODULE 1 J
I V STRING#1: I
t 9 MODULES
I w
\\--CHIMNEY a
I II
uj U N
Z m Q
I I > z
I W W W m
I Z
H H �
54 Burncolt Rd„ Florence MA 01062
SHEET
NAME:
L—————————————————————————— W Z
- — J
SHEET
NUMBER:
PV SYSTEM SITE PLAN °.
SCALE: 3/32"= 1'-0" a
Page 2 of 2
B. Loading Criteria
10 PSF = Dead Load (roofing/framing) 40 PSF = Live Load (ground snow load)
3 PSF = Dead Load (solar panels/mounting hardwarEO
Total Dead Load= 13 PSF
The above values are within acceptable limits of recognized industry standards for similar structures and in
accordance with the 2009 International Residential Code with Massachusetts Amendments. Analysis performed on
the existing roof structure utilizing the above loading criteria indicates that the existing members will support the
additional panel loading without damage, if installed correctly.
C. Roof Structure Capacity
1. The photographs provided of the attic space and roof rafters show that the framing is in good
condition with no visible signs of damage caused by prior overstressing.
D. Solar Panel Anchorage
1. The solar panels shall be mounted in accordance with the most recent "Mounting System Inc.
Installation Manual", which can be found on the Mounting System Inc. website (usa.mounting-
systems.info/en/solar-mounting-systems-company). If during solar panel installation, the roof
framing members appear unstable or deflect non-uniformly, our office should be notified before
proceeding with the installation.
2. The solar panels are 1 '/2'thick and mounted 4 1/2'off the roof for a total height off the existing roof
of 6". At no time will the panels be mounted higher than 6"above the existing plane of the roof.
3. Maximum allowable pullout per lag screw is 205 Ibs/inch of penetration as identified in the Nation
Design Standards (NDS) of timber construction Specifications for Spruce-Pine-Fir assumed. Based
on our evaluation, the pullout value, utilizing a penetration depth of 2 '/2", is less than the maximum
allowable per connection and therefore is adequate.
4. Roof Section 1: Considering the roof slopes, the size, spacing, condition of the roof, the panel
supports shall be placed at and attached no greater than every fourth roof member as panels are
installed perpendicular across members and no greater than the panel length when installed
parallel to the members (portrait). No panel supports spacing shall be greater than four (4) spaces
or 64"o/c, whichever is less.
5. Panel support connections shall be staggered to distribute load to adjacent members.
Based on the above evaluation, with appropriate panel anchors being utilized the roof system will adequately
support the additional loading imposed by the solar panels. This evaluation is in conformance with the 2009
International Residential Code with Massachusetts Amendments, current industry standards and practice, and the
information supplied to us at the time of this report.
Should you have any questions regarding the above or it you require further information do not hesitate to contact
me.
V truly yours, ��N OF
s
y
.�� SUN
VIL
Scott E. Wyssling, P No SD507
MA License No. 5 7 O9oF9FC/STEA
FSS/pNAI�N6
Vivant.
41 0
vivin t 3301 North Thanksgiving Way, Suite 500
Structural Group Lehi, UT 84043
P: (801) 234-7050
Scott E. Wyssling, PE
Senior Manager of Engineering scott.wyssling @vivintsolar.com
December 16, 2015
Mr. Dan Rock, Project Manager
Vivint Solar
3301 North Thanksgiving Way, Suite 500
Lehi, LIT 84043
Re: Structural Engineering Services
Payne Residence
54 Burncolt Rd, Florence MA
S-4749023
2.34 kW
Dear Mr. Rock:
Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of
the above referenced home:
1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site
information including size and spacing of members for the existing roof structure.
2. Design drawings of the proposed system including a site plan, roof plan and connection details for
the solar panels. This information was prepared by the Design Group and will be utilized for
approval and construction of the proposed system.
3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar
system.
4. Photographs of the interior and exterior of the roof system identifying existing structural members
and their conditions.
Based on the above information we have evaluated the structural capacity of the existing roof system to support the
additional loads imposed by the solar panels and have the following comments related to our review and evaluation:
Description of Residence:
The existing residence is typical wood framing construction with the roof system consisting of the following:
• Roof Section 1: Roof section is composed of 2x6 dimensional lumber at 16" on center with 2x4
collar ties every 48" and a single layer of roofing. The attic space is unfinished and photos indicate
that there was free access to visually inspect the size and condition of the roof members.
All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard
construction components. The existing roofing material consists of composite shingle. Our review of the photos of
the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying
members.
Stability Evaluation:
A. Wind Uplift Loading
1. Refer to attached MSI calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings
and other Structures, wind speed of 90 mph based on Exposure Category B and 23 degree roof
slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure B, Zone 3 per (ASCE/SEI
7-10).
2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the
dwelling.
■ •
' ® DATE(MMIDD/YYYY)
ACCC)II CERTIFICATE OF LIABILITY INSURANCE 10/31/2014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER NAME'ME:
MARSH USA INC.
122517TH STREET,SUITE 1300 AIC No Ext: FAX No):
DENVER,CO 80202-5534 E-MAIL
Attn:Denver.certrequest @marsh.com,Fax:212.948.4381 ADDRESS:
INSURERS AFFORDING COVERAGE NAIC#
462738-STND-GAWUE-14-15 INSURER A:Evanston Insurance Company 35378
INSURED INSURER B:Zurich American Insurance Company 16535
Vivint Solar,Inc:
Vivint Solar Developer LLC INSURER C:American Zurich Insurance Company 40142
3301 North Thanksgiving Way INSURER D:
Suite 500
Lehi,UT 84043 INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: SEA-002455551-03 REVISION NUMBER:1
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE ADDL SUER POLICY NUMBER MM/DCDIYYYY MM DDY� LIMITS
LTR
A GENERAL LIABILITY 14PKGWE00274 11/01/2014 11101/2015 EACH OCCURRENCE $ 1,000,000
X
DAMAGE T RENTED 50,000
COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $
CLAIMS-MADE IT]OCCUR MED EXP(Any one person) $ 5,000
X $5,000 Ded.BI&PD PERSONAL&ADV INJURY $ 1,000,000
GENERAL AGGREGATE $ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000
POLICY X PRO- LOC $
AUTOMOBILE LIABILITY BAP509601500 11/01/2014 11i01/2015 EOadenSINGLELIMIT $ 1,000,000
X ANY AUTO BODILY INJURY(Per person) $
ALL OWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS AUTOS
X X NON-OWNED PROPERTY DAMAGE $
HIRED AUTOS AUTOS Per accident
A UMBRELLA LIAB X OCCUR 14EFXWE00088 11/01/2014 11101/2015 EACH OCCURRENCE $ 5,000,000
X EXCESS LIAB CLAIMS-MADE AGGREGATE $ 5,000,000
DED RETENTION$ $
C WORKERS COMPENSATION WC509601300 11/01/2014 11101/2015 X wC STATU- OTH-
B AND EMPLOYERS'LIABILITY WC509601400 11/01/2014 11101/2015 1,000,000 I ER
ANY PROPRIETOR/PARTNER/EXECUTIVE YIN E.L.EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? r NIA
(Mandatory in NH) E.L.DISEASE-EA EMPLOYE $ 1,000,000
If yes,describe under 1,000,000
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT I $
A Errors&Omissions& 14PKGWE00274 11/01/2014 11101/2015 LIMIT 1,000,000
Contractors Pollution DEDUCTIBLE 5,000
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required)
CERTIFICATE HOLDER CANCELLATION
Town of Northampton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
212 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Northampton,MA 01060 ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
of Marsh USA Inc.
Kathleen M.Parsloe 1Jr• Beals-e-
@ 1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD
Massachusetts-Department of Public Safety
Board of Building Regulations and Standards
Construction Supervisor.
License: CS-070940
John AJalbert
591 ELM STREET
WEST SPRINGFLf'E
Expiration
Commissioner 0=512017
+iIJF 61(,+
Mee of Consumer Ait;stlrs&Business RegalWas
ME IMPROVEMENT CONTRACTOR
Registration: MW Type
Expiratlaw j4=16 Supplement
VIVINT SOLAR DEVELOPER I.I.C.
JOHN JAL.BERT
4931 NORTH 300 WEST
PROVO,UT$4004 Undersecretary
ISE110IG-ID99049
4W UC SalnD9ego I Extension
INTERNATIONAL SAFETY EDUCATION INSTITUTE RSEII
This card certifies that
JOHN JA .BERT
has completed a it?-Hour OSHA Hazard Recognition Training
for the Construction Industry
� � _•—� �f ��--- _ 01125/2014
Director Scott MacKay Traine':Taylor Sikes grad.Date.
The Commonwealth of Massachusetts
Department of IndustrialAccidents
Office of Investigations
I Congress Street,Suite 100
Boston,MA 02114-2017
www.mass.gov/dia
Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant information Please Print Leeibly
Name(Business/Organization/Individual): Vivint Solar Developer, LLC
Address:3301 North Thanksgiving Way,Suite 500
City/State/Zip:Lehi, LIT 84043 Phone#:801-377-9111
Are you an employer?Check the appropriate box: Type of project(required):
1.1 lam a employer with 214 4. ❑ I am a general contractor and I 6. ❑New construction
employees(full and/or part-time).* have hired the sub-contractors
2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. E] Remodeling
ship and have no employees These sub-contractors have g• ❑Demolition
working for me in any capacity. employees and have workers' 9. ❑Building addition
[No workers' comp. insurance comp. insurance.t
required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs
insurance required.]t c. 152,§1(4),and we have no Sol Installation
employees. [No workers' 13.❑ Solar aon Other
comp. insurance required.]
*Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information,
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
:Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:Zurich American Insurance Company _
Policy#or Self-ins.
��L,,iic.#:WC 5096013000/ Expiration Date:11//1/2015
Job Site Addresf�7.� r� 0 C'CY� ! d _City/State/Zip:
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct
11/4/2014
Sip-nature: ® G�-�---`-� Date:
Phone#: 801-2296459
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: John A Jalbert CS070940
License Number
150 Padeette St Unit B Chico nee. MA 0 1022 03/25/2017
AddreWl 011 Expiration Date
//,/,/ IA�t� 413-331-0769
Sig re 7 Telephone
8.Realstered Home Improvement Contractor. Not Applicable ❑
Vivint Solar ,yelQper/,iohn A Jalbert 170848
Company Name Registration Number
3301 N Thanksgiving Way 9500 Lehi,UT 84043 1/5/2018
Address Expiration Date
Telephone 413-331-0769
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(8))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... ❑ No...... ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CM 780, Sixth Edition Section 108.3,5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one horde in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION b-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House Addition Replacement Windows Alteration(s) El Roofing ❑
Or Doors ❑
Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [Q Siding[0] Other[C3]
Brief Description of Proposed (�
tt frrk: Installation of roof mounted Dhotovoltai solar systems#of modules ��
Iteration existing bedroom m es 1 n o Adding�new bedroom�,v�e� . No W7
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll -Sheet
ea.If New house and or addition to existing housing, complete the following:
a_ Use of building:One Family Two Family Other
b_ Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance, Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft.of wetlands? Yes _No. Is construction within 100 yr_ floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No.
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
1, as Owner of the subject
property
hereby authorize
to act on my behalf,in all matters relative to work authorized by this building permit application.
Signature of Owner Date
i, Vivint Solar Developer as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Savina Cervone
]Print Si Owner/Agent Date
JAN 1 2016
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size
Frontage
Setbacks Front
Side L: R: LL—R:_
F
Rear
Building Height
Bldg.Square Footage
Open Space Footage %
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
(volume&Location
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO 0 DONT KNOW 0 YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DON'T KNOW 0 YES 0
IF YES: enter Book Page. and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW 0 YES
IF YES, has a permit been or need to be obtained from the Conservatibn Commission?
Needs to be obtained 0 Obtained 0 ;,.Dote I;sued',;
C. Do any signs exist on the property? YES 0 NO 0
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO 0
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing,gradingj,excavation,or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES O NO '0
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
i
A Department use only
--c"ity Of Northampton Status of Permit:
E uildog Department Curb Cut/Driveway Permit
1 21�Main Street Sewer/Septic Aveilablllty
u Boom 100 WaterlWell Availability
Northampton, MA 01060 Two Sets of Structural Plans
=' phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans
: - Other Specify
APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Pro a Address: n�J This section to be completed by office
r �f I� Map Lot Unit
Fl o mn Cep ► M Zone Overlay District
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Name(Print) J Curr n s
Telephone
Signature
2.2 Authorized Assent:
Savina Celvone 150 Padgette St, Chicopee, MA 01022
Name(P' Current Mailing Address:
AA_Q 413-331-0769
Signa Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
complete by ermit applicant
1. Building �k (a)Building Permit Fee
2_ Electrical (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection s
6. Total=0 +2+3+4+5) Check Number
This Section For Official Use Only
Building Permit Number: Issued:
Signature:
Building Commissioner/Inspector of Buildings Date
File#BP-2016-0892
APPLICANT/CONTACT PERSON VIVINT SOLAR DEVELOPER LLC
ADDRESS/PHONE 150 PADGETTE ST UNIT B CHICOPEE01022(413)331-0769
PROPERTY LOCATION 54 BURNCOLT RD
MAP 12C PARCEL 027 001 ZONE RI(100)/URA(100)/WSP(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT 44 4
Fee Paid
Building Permit Filled out
Fee Paid
Typeof Construction: INSTALLROOFMOUNTED2.34KW SOLAR ARRAY
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 070940
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFOR ION PRESENTED:
pproved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolitio a
Sig ure o ui ing Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
54 BURNCOLT RD BP-2016-0892
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map:B►ock: 12C-027 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR PANELS BUILDING PERMIT
Permit# BP-2016-0892
Project# JS-2016-001509
Est. Cost: $5148.00
Fee: $75.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: VIVINT SOLAR DEVELOPER LLC 070940
Lot Size(sq. ft.): 11630.52 Owner: PAYNEJOAN
Zoning: RI(100)/URA(100)/WSP(100)/ Applicant: VIVINT SOLAR DEVELOPER LLC
AT. 54 BURNCOLT RD
Applicant Address: Phone: Insurance:
150 PADGETTE ST UNIT B (413) 331-0769 WC
CHICOPEEMA01022 ISSUED ON.1/1112016 0:00:00
TO PERFORM THE FOLLOWING WORK.INSTALLROOFMOUNTED2.34KW SOLAR
ARRAY
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType• Date Paid: Amount:
Building 1/11/2016 0:00:00 $75.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner