31B-199 (2) I f r E r E i i f r i r f r I f i i i { V( i JUL-17-2001 12:03 RE DINNEEN ARCHITECTS 617 227 1870 P.08/0B Sessions Annex Renovation Construction Meeting#08 [held on July 12] page 7 of 7 ITEM 0 ITEM ACTION 11.9 Exhaust Fain Basement EF can hang from Ceiling. New p.T.wood platform is needed. 11.10 Condensate Pad C.Moran regneated a nwv cone.pad for the condensate pump. 11.11 Basement Lower L&S wiff review'size. A proposed BS window will need to become a louvered ep mag. The opmW will need to be larger than existing. 11.12 Condensate Line II WAngelo will coUtUt C.Moran for exterior wall exit of Condensate hue- 11.13 Door Shipment W111 noted that the C.of O. The doors ace scheduled to be shipped on depends on doors being Aug.200 fvm some corgi in b9mumri. hmmg. The next meeting to be held on July 19,2001 at 1 OOPM at the Physical Plant office. Submitted try: Gabriel Zavala,RA sc: attendees Anthony Patillo,Building Commissioner Ralph Dinneen,REDAP Gabriel Zavala,REDAP TOTAL P.OB i f i i t i t i Ir I I I i I JUL-17-2001 12:03 RE DINNEEN ARCHITECTS 617 227 1870 P.07/08 Sessions Annex Renovation Construction We*#08 [held on July 121 page 6 of 7 ITEM# ITEM ACTION New Business 11.1 Spriulder Coverage The eu&W and Moran There appeared to be a discrepanry about will re-cbeck required the required number of heads in Bathroom coverage. 300T. 11.2 ]L.R Double Doors WBLwid refinme as New jamb and bender flaming is required required to support doors. to support the new arched doors. The esisting framing is bowed and inadequate. 11.3 security Wiring Two#IS wires(I 10V)An seeded for future security entry card devices at HC NO rear entry. 11.4 East Exterior Door WBi was imtrueted to The exterior door turned out to be a poelot modify the door and make it ~-' door alter the trim was remove& a swAnging door. 11.5 Snowguards WBI wag imtrocted to add An additional quantity(approx.6-8 LF)will this. be required to protect the bulWsead qty - 11.6 Wainscot WBI win review possibility An additional quantity of wainscot is of as d ft symmetrical required at the door infiU in the MOST panels. entry. 11.7 New Plaster WBI will price. Additional plastering will be needed. 11.8 300T Toilet Partition The go"mounted pilasters will have to go to the cdft here. The right pilaster wig be shipped wider and acribed to the wall i i i i i V i i i I !� V i i ft I `� iI I e 1 i i i i i w i i i !I i I f f� __ f JUL-17-2001 12:03 RE DINNEEN ARCHITECTS 617 227 1870 P.06i08 Sessions Annex Renovation Construction Meeting#08 [held on July 121 page 5 of 7 ].I.EM N ITEM ACTION 7/12 The FP submittal dare being B.Spekdiog(P"asked reviewed by the engineer. Smith's insurer IAS to review past dorm (nil)tbioks this dorm is elaaaifled pr+ojeeta am issue Smith a "ol'anar,y,1%,z"" meow on the viabrkity of The engineer notes that NFPA 13 deftoatea designating tbb done dorms sa"I.gbt Board." "I CM 1jazrd"also. 8.01 RoofFhanieg Work approved by Smith. The third floor roof structure needs support Wright Builders to prepare and part of the plaster ceiling needs to be pricin& removed for access. 6/28 The structural engineer was called to the site Approved by Smith for advise.He suggested adding cripples from the new beam to the existing roof joists for added support - 7/05 WBI is Preparing pricing. 7/12 WBI will bave tbet price Waded in a !afore C.O. 9.01 Bextieg Lines Heating lines to approximately 6 areas(tad &3rd floors)will need to be fed through the floor,rather than the wall due to space available.The pipes will need to be painted. 7/12 WBI will have the painting cost Waded in a!stare C.O. 10.2 Soldering The puddied soldering on the flat seam copper seems overly wide. WBI to ask roofer if this can be reduced for aesthetic improvement. 7/12 This detail is standard practice when using a 314"lap seam to have structural integritY. i i i i f I `� e i E f E r i i I i r I i I V I i I i I E i I i f i r I i� I JUL-17-2001 12:03 RE DINNEEN ARCHITECTS 617 227 1870 P.05i08 Sessions Annex Renovation Construction Meeting#08 [held on July 121 page 4 of 7 ITEM# ITEM ACTION 5.13 M"o®ry Mason can proceed but B.Benoit pointed out the need for adding eliminating repainting at 1 feathered masonry infill at the bulkhead. chimney may offset cost. 6/07 B. Spalding asked WBI to havc�a price for B.Benoit will show mason masonry repair work identified. the exposed area needing repair to have a price prepared. 6/14 Wright Builders is pricing this item. B. See Item 7.08. Spalding also asked for a Unit Price for masonry- 6/21 Wright Builders will have pricing at 6/28 �.' meeting. 6/28 Wright Builders is waiting for pricing. 7/05 WBI is awaiting pricing from sub. 7/12 WBI will have that pace mdedW is a fates C.O. 7.02 Fim Pretectim The,drawings will be C.Moran noted that while the product submitted to LdtS and the submittals had been received back he needed building department. to check on the status of the design drawings for submittal. 6/21 Design drawing to be issued to Wright Copy REDAP Builders today 6/28 Design drawing to be issued to Wright Copy REDAP Builders today 7105 Copies haven't been distributed yet to engineer Heads to be reviewed against for review. as-buih spaces. U JUL-17-2001 12:02 RE DINNEEN ARCHITECTS 617 227 1870 P.04/08 Sessions Annex Renovation Construction Meeting#08 [held on July 12] page 3 of 7 ITEM# UEM ACTION 6/14 Wright Builders is waiting for M&S Elect.To See Item 7.08. complete their pricing of the porch fixtures. 6/21 Wright Builders will have pricing at 6/21 meeting. 6/28 Wright Builders waiting for pricing. 7/05 Credit on 1 "L"fixture is owed Smith. M&S Elect. is pricing the credit to give to WBI. 7/12 Addidomd credits should be expected for 1 REDAP wM sehtct a WRV type"B"fltm deleted at the sutry. One souaoe. additional fixture was added today,an exterior wall scunoe outside the HC entry. 5.69 Mnphm Brick The fireplace in Living Room 100LR2 will have tiles removed and mason will look at brick. 6/07 The exposed brick w0I be acid cleaned. Some "DAP will review the repointing is required. hearth the submittal for a selection. 6/14 The tiles were reviewed for hearth floor pavers WBI was instructed to use in 100LR2 and Bedroom 204_ Tiles are 6"x American Olean BA02 6"with 3 'h"x 12"(cut to match paver joints). Monzone Blend(unpolished). See Item 7.08. 6/21 The tiles at the hearth and fi ebox surround Approved by Smith and will be replaced with"Crow's Foot"stone in REDAP. slab form.the floor of the firebox will have used brick. 6/28 Wright Builders is waiting for pricing. 7/05 WBI is awaiting pricing from sub. Price expected by 7/12. 7/12 The pricing is included is C.O.iii. i i i I I i i I i i i i i I i E I i i E JUL-17-2001 12:02 RE DINNEEN ARCHITECTS 617 227 1870 P.03i08 Sessions Annex Renovation Construction Meeting#08 (held on July 121 page 2 of 7 ITEM ITEM ACTION 2.08 )E"Iria m/Elechrial/TeL Data Architect to select"B"and The following changes arc requested to drawing E1.2: IM"factures and notify I. The existing chandelier in Stairway Lindgren of selections for 10051 shall become a a e"M" revised drawings. fixture with 24"long stem. 2. 3. Ali"M"pendant fixtures shall be Lindgren shall look again at cpeoed with a top lease to prevent the existing porch fixture bug stuff locations. There is one 4_ The two"B"fixtum in 14C Acocss directly over the entry. Do 100SIA shall become surface matroted, not add or move. 5. Delete the"B"fixture in Stairway 1005I. (. The switch omtrolling the deleted "B"fixture should oontrol the outlet on the west wall under the stairs(for temporary lighting). 7. Add 1 eel.data outlet next to the power outlet on west wall under the stairs. 9. The"L".parch fixture to be revised. 9. The locations of the"L"porcb Sxtums to be lo®ted in existing plam- 5/17/01 MAP to issue the memo with fixture catalog numbers to Lindgren for the Revision. Item 7:Smith requested the existing surf:Mtd. Wiremould be removed and a standard recessed power outlet be installed. 5/24 Changes are reflected on reissued drawings. WBI and Smith copied 5/31 Buster w/M&S is pricing this. 6/07 Buster distributed his pricing changes. M&S Electric will check the pricing of 3(versus 4 original)porch fixtures and revised type. I r i i i i I I ii I f I !� iI I i t f 3 4 i 1 j I i 3 t i I 1 4 r I i I i i JUL-17-2001 12:02 RE DINNEEN ARCHITECTS 617 227 1870 P.02i08 Sessions Annex kenovation D L5 C E Q � E Construction Meeting#0$ ' [held on July 12] ;I page 1 of JUL 1 " I I R>EPQIRT OF MEETING DEPT OF BUILDING INSPECTIONS NORTP�OT,),N''Y.; (iiu.G DATE: 16 July 2001 PROJECT NAME: Sessions Annex Renovations Smith College 105 Elm Street Northampton,MA PROJECT NO._ REDAP No.: 00166.32 Wright No.: 01 -426 SUBJECT: Comtructioe Meeting #118 jheld on July 12] ATTENDEES: Barbara Sp*Wn,Smith College Art Pichette,Linda Gaudreau,Bob Benoit,Wright Builders Nicole Weiss Lindgren&Sharples Chad Moran,MJ Moran Gabriel Zavala,REDAP This report represents the Architect's understanding of the matters discussed and agreements reached Corrections and modifications to these minutes will be reflected in the next meeting minutes. i f i f i i r i j i �.. � i i i i I E i i I I i i i s i r i _ JUL-1?-2001 12:02 RE DlNNEEN ARCHITECTS 617 227 1R70 P.01/08 ���� � FAX ��v ' �/��� ~�u�«-� ���=� ��������u�m�m ���m� -I LA- ~~ � « � Dam;: 17 July%W01 No. of Pages Following Cover 7 86o� -...--_--- ..'.---...--..... ........ To: Mr.Anthony Patillw To: -'---'-------`~'----'^ -------'----------`-''--- Building Commissioner -'----------''-''''--'-'' ------------'---------' Fix No.; 413)5W7' 1272 FAX No.' -......................... ................... .� Tw To: R.F.DUNMEEN -''--'----------'—' R.. ....... Fax No- Fax No. ARCHITECTS & --------'-----'---' PLANN6RS,)NC. DEFT Of BUILDING INSPECTIONS To: To: I NORTHAMPTON,MA 01060 ....................................... ........... ........................................ --'__-._-.--_--~--_._-- _----'_--- ..................... Fax No: ���m�� ����..........`�..........'�����. .................... ................................ FROM: R.Gabriel Zavala,RA ....................................................... ................ .................................. —.___--._--'----___-'__-'.-__—_---__' PROJECT NA882: �ma�mmAnnmx Rmnwvm6mn ... Smith Coilege, -----'-'—'-'-----''-~---~'----'---^'--^''~^-' PROJECT#. 00166.32 ..---_-.-'--- ..................... American&,mw, REMARKS: Per the rm�w�mf Wr�hxBm���and Smith CoUcp please ----'------ ................................................................................. qfx^hx*u futdmnwhed the meeting minutes for Construction Meeting#08, 6*erm,'"vwfInxri* --~--''''-^--`-^'--~---'-'''-'---`-----'-'-'~'--`-'--^-~`--''~'^-^---' /*sigpx""u"=° ............................... ........... ---------................................................................................ ................................ ...... ........................... ........................................................................... .......................... ........... -_-------.____-----_---_'_-----_--_--'-___-_---_- -- ............... ..............................................................................................................-- ..................... ................... ............................................ ............ ................ ........................................_--.-...................................-.......... ...................... -__.................................................................................................................................. ���������� .............................................................................................. ................. cc: w0ject Bile .......... - ............ ............................................................--........................ ------............ 1,100 160warth11,iii6"kqmoSrwv umm*/1assuchmeo02114'2143 rdmr2277;77 .fix mro7, /xn`