Loading...
17C-214 (23) ! 3 FLORENCE SAVINGS BANK May 11, 1992 Frank Sienkiewicz, Building Inspector City of Northampton 212 Main Street Northampton, MA. 01060 Dear Frank: Thanks for taking the time to visit us t As you know, we have negotiated an agreement witV lexand„ 5 for about fifteen parking spaces for the next four years. Rest assured, we will have something in place before the expiration of the lease so we may continue our normal operation. Enclosed is an architect's drawing of the top floor which you toured today. The only part we want to complete at this time is the Board/Conference Room inside the yellow markers. It will be used for our Board meetings and occasional staff meetings. We do not plan any additional renovations of that area at this time. Since 1y, JJ Edward A. Morin President EAM/jw Enclosure 85 Main Street L� Florence,Massachusetts 01060 / (413) 586-1300 �-` P' s r r J r l r f „ r n. �P , 1 i o. s Is C Eat JU 71979 H J DEPT,OF BUILDING INSPECTIONS NORTHAMPTON. MA.010U) i r c C CITY OF NORTHAMPTON ZONING PERMIT APPLICATION ± JUN � Map No. / 7�- Lot � � 7 �� 71979 Zoning Ordinance Section 10.2 eceived: I No. C; 90 l� Plan File / N RTHAMPTON, MA 01050 Owners „ z 4� �ti�� Applicant � ���,. Address -7 Address Telephone �' �� Telephone This section is to be filled out in accordance with the "Table of Dimensional and Density Regulations: (Z.O. ARTICLE VI) Zoning Use Lot Front Depth Setbacks Max. Bld. Min. Op. District Area Width Front Side Rear Cover Space Past Existing Present Proposed,Irl Mark the appropriate box to indicate the use of the parcel: ❑ Non-Conforming Lot and/or Structure. Specify ❑ Residential El Single Family Unit ❑Multi-Farr ❑ Duplex i Other �� YBusiness ❑ Individual ❑ Institutional El Subdivision ❑ Regular ❑ P.U.D. ❑ Cluster ❑ Other ❑ Subdivision with "Approval-Not-Required"-Stamp: ❑ Planning Board Approval: ❑ Zoning Board Approval (Special Permit 10.9: Variance) ❑ City Council (Special Exception S. 10.10) Watershed Protection District Overlay: (Z.O. Sect. XIV) ❑ Yes ANo Parking Space Requirements: (Z.O. Sect. 8.1) Required Proposed ll2� 7 Loading Space Requirements: (Z.O. Sect. 8.2) Required Proposed Signs: (Z.O. Art. VII) Yes O No Environmental Performance Standards: (Z.O. Art. X1 1) ❑ Yes N!o l�"tV Plot Plan Yes ❑ No Site Plan ❑ Yes o (S. 10.2) (S. 10.2 and 10.11 Waiver Granted: Date ❑ This section for OFFICIAL use only: Approval as presented: ❑ Modifications necessary for approval: ❑ Return: (More information needed) ❑ Denial: Reasons: Signa a of Applicant Date Sign ure LnfAdmin. Office bate