31B-173 NOT FOR CONSTRUCTION o�F Gl i _S 32 Taugwonk Spur,Al2 Stonginton,CT 06378 Phone(860)535-3370 F"(413)683-2225 GRID-TIED PHOTOVOLTAIC SYSTEM WARNING 3.860kW DC @ STC I FLECIRIC SHOCK HAZARD ARE PRESENT AT THIS LOCAL ION: IF GROUND FAULT IS INDICATED 1.UTILITY C RID CAINE,ELIZABETH NORMALLY GROUNDED CONDUCTORS 2.PHO1OVOLTAIC 26 BARRETT PLACE MAY BE UNGROUNDED AND ENERGIZED NORTHAMPTON,MA 01060 NEC Article 690.64(B)(4) Project#10243459 &705.10 NEC Article 690.5(C) Val lonescu Mike Morrison 2015-03-10 PI IOTOVOLTAIC DISCONNECT REVISIONS Every 19 on all conduit,j-boxes,& # By Data Notes NEC Article 690.14(C)(2) raceways CEC Article 690 z WARNING 3 I 4 ELECTRIC SHOCK HAZARD A CONNECTION DO NOT RELOCATE 3 DO NOT TOUCH TERMINALS - It RMINALS ON BOTH THE FINE AND NEC Article 690.64(B)(7) 1111 OPEN POSILHON NEC Article 690.17 &705.22(4) MAXIMUM AC OPERATING CURRENT: 14,0 A MAX SYS FEM VOL FAGE: 46.1 V 4 S X MAXIMUM A(OPERATING VOLTAGE 240 V SHORT CFR(UIT CU P RENT: 11.98 A 8 System Specifications System Specifications o NEC Article 690.54 NEC Article 690.53 Not to Scale SIGNAGE PV-GOB NOT FOR CONSTRUCTION ,iw R,G,s MODULE SPECIFICATIONS TEMPERATURES Solarworld Pkis SW 275 Mono Black Ambient Low Temperature: -32-C ................... --.................................................*........... STC Rating: 275 W Height: in. Ambient High Temperature: 35°C 32 Tauirwonk spur,Al2 .................Ofd- : Stonginton,CT 06378 ing: 240 W Width: 39.4 in. Temp.Rise for Voltage Calculations: 31°C ........................................................................................I............................ .............. ................................................................................. Phone(860)535-3370 ...............................V..m.P.:.-3.1,.0Y.............................Depth: 1:22.in:....... Temp.Rise for Exposed Conduit on Roof: 22-C Fax(413)683-2225 I MP: 8.94 A Area: 18.0 ft' ........................................................................................ —................ SYSTEM LABELING SPECIFICATIONS GRID-TIED ...............................V.2c.: 3.9..4V............................Weight:....-3.9.�5 lbs ftage(-32'C): 46.1V PHOTOVOLTAIC SYSTEM .:..&6 Max:.DC Vo Current: 11.98 A I sc: 9.58 A Max.Fuse: 16. K ...........I........... .................. DC Operating Voltage: 0 V- Current: 8.94 A 3.85OkW DC @ STC %!°C ........................ ..............Ad.Nominal Vobge: FF�s I CAINE,ELIZABETH 26 BARRETT PLACE MA INVERTER 1 SPECIFICATIONS INVERTER I CURRENTS INVERTER I LABELING SPECIFICATIONS NORTHAMPTON,Project#102434 01060 59 Enphase Energy M250-60.2LL-S22 DC Max.Current: MODULE Isc x 1.25 Max.DC Voltage(-32*C): 46.1 V DC Max.Current: Val lonescu Nominal V Ac: 240 V 9.5BA x 1.25 = 11:98 A in 31:0 V g-durre ......................4........................................... .......................................................................... .................................I...................I....... .................................... ............................. ........................ Mike Morrison Max,W oc: 300 W DC Operating Current: MODULE Imp AC Nominal Voltage, 740 V Max.AC Current: 14.0 A I — ................ ..........iZw— 8.94A._= 8;94 A 2015-03-10 Voltage:... ...... ........ Vo '�i�........... Eazi-s-c-x 1....2..5.x—f.-2-5............................................. ... .................... INVERTER I VOLTAGES Startup...............................I i.................. DCMax.Voltage MODULE Voc x TEMP DELTAx TEMPCOEFVoc REVISIONS Min.V MP: 16 V 9.58A x 1.25 x 1.25 = 14.97 A (-32'C): 39AV x 57 x 0.003 46.1 V .......................Max.I......................I................ ...................................................................................................................................................................... # BY Date Notes V MP: 48 V OutputCurrentlAc: INVERTER lacx INVERTER QTY x 1.25 ..................................................................................................................................................... ... ..... ...... ..............1-41;x V..Dc: 48..V 1A x 1.25 x 14 17.50A DC Operating MODULE Vmp ......—.1....................................................... Voltage: 31V = 31.0 V 2 Max. 15 A —3 Max.I Ac. .................... CEC Efficiency: . 1.00A ............................................................... 96.5% 4 0 Not to Scale ELECTRICAL CALCS PV-E02 NOT FOR CONSTRUCTION WIRE SCHEDULE WIRE SIZING VOLTAGE DROP Notes: G Ground 90°C berated Amapacity 75°C ✓''_ 1. AN conduit to use water-tight expansion fittings. Tag Qty Conductor Size&Type Size&Type Conduit (Allowable Amps x Temp Derate x Fill Derate) Ampacity Length V.Drop 2. All Rooftop conduit to be a minimum of 1"above the roof surface. A 1 #12 AWG ENGAGE CABLE #6 AWG BARE Cu FREE AIR 30A X 0.77 ;23.10A 25.00 A WA 0.62% ..................................................................................................-...................................... .... 5................................................................... 3. PV Connection into Load Center shall be positioned at B 3 i #10 AWG THWN-2 #8 AWG THWN-2 314"EMT 40A X 0.77 X 1 = 30.80 A 35.00 A 50 Ft 0.72% ...............:................:........................................................._....................................... ...... ........ ..... _ ... _ ................. ... .......................................................................... the opposite end from the Utility Input feeder C 3 #10 AWG THWN-2 _ #8 AWG THWN-2 3/4"EMT 40A X 1.05 X 1 :42.00 A 35.00 A 10 Ft 0.14% location.(Where applicable) ......... ........ ................................................... ................................. .......................... ..................................... ... ............. ............... ......... 32Taugwon Spur,06 ... ....... ....:... ...:.... ....?... ... ... ... ... ........... Stong(nton,Cr 06378 4. AN equipment to be rated NEMA-3R unless otherwise Phone(860)535-3370 DC ----...._.... Fax(413)683-2225 noted. .......................:............... 5. Lowest expected ambient temperature based on AC 1.49% GRID-TIED ASHRAE min.mean extreme dry bulb temperature for PHOTOVOLTAIC SYSTEM ASHRAE location most similar to installation. 6. Highest continuous ambient temperature based on 3.850kW DC STC ASHRAE highest month 2%dry bulb temperature for CAINE,ELIZABETH ASHRAE location most similar to installation. 26 BARRETT PLACE 7. All conductors to be copper unless noted otherwise. NORTHAMPTON,MA 01060 8. Conductor sizing shall limit Voltage drop to 2%DC& SYSTEM LABELING SPECIFICATIONS Project#10243459 1.5%AC(2%for Enphase Systems). Max.DC Voltage(-32°C): 46.1 V DC Max.Current: 11.98 A "ER Val lonescu 11 DC Operating VoNage: 31.01i DC Operating Current: 8.94 A R�,e A Mike Morrison �. AC Nominal VoHa 240 V Max.AC Current 2095-03-10 MAIN SERVICE PANEL REVISIONS INTERCONNECTION # By Date Notes 120%Rule-705.12(D)(2) Utility Feed + Solar Backfeed 200 A + 20 A = 220 A 2 Buss Rating x 120% s 200 A x 120% = 240 A 4 6 _---------—___� ;EXTERIOR (N)Enphase ) a Envoy a � r K 120V S (Nf)Locus L-Gate 120 14 Solarworid Plus SW 275 mono black Modules with 14 Home Owner Enphase Energy M250.60-2LLS22 Micro-Invertet5., PV Production Meter Branch of 14 J-Box 4x4x4 240VAC M (NI)20A - -- COMBINE EXISTING BREAKERS TO MAKE ROOM FOR PV •°•" Not to Scale BACKFEED BREAKER ELECTRICAL DIAGRAM A B PV-E01 Rooftop Electrical i------------Int_Basement NOT FOR CONSTRUCTION Roof Zones for Enclosed Buildings 2 Su ested Bill of Materials Im"IF- NOTE:UMtenals Listed below are subject to change during final Installation. PART DESCRIPTION I PART NUMBER QTY 32Taugwonk Spur,Al2 ................................................. ....................;: - - ......... ... Storginton,CT 06378 ............. ........... SOIARWORtD Plus SW 2]5 mono black Plus SW 2]S mote bkck Phone(860)535-3370 .................... Fax(413)683-2225 h ..................................................................................................... ......................... ........... ....................... INVERTERS ........................ ................................ M25030-2L4522---.-- -- -................................................... GRID-TIED Design Wind ftomum Walls&Roofs ...............EnDhasa Energy .................... .............................. .......... .................. ............ m ......................... PHOTOVOLTAIC SYSTEM MONRORING............................................ ............ ........................ ......................................................................... 3,850kW DC @ STC ...................................................................................... ..................... .................................... V.- :.- ........... E,,WCo,�;�;t,w�,WiFiAd,pt,,,120V,c ........... CAINE,ELIZABETH ..............*.............*.............. ................. ..........................................-'-............. 26 BARRETT PLACE ........ .......... E..t.h..a ...L ................-It20 or g.. ......8 d W....0..A..S..H. ......................................................................................................1........... NORTHAMPTON,MA 01060 Project#102434%- ROOF MOUNT.......................... ............................................................................................................................. ................... ......................................................................... n-t Val Ionescu ................................ ..................................... ....................................... 310168D .......... Mike Morrison ............ ............................i6i�i'i6 SM ENDCLAM�'i'i;W�� ...................... ............................ .......... 2015-03-10 W2027D .... ........ ................................................. i�i�ii6........... .......... ................................................ .................. REVISIONS V�4'i'�*,'-B k.......................... ........... ............................... ............it�iwi6 ................... ................ ......................................... L-FOOT SERRATED W1 T-BOLT,DRK 28 By Date Notes .... ....... ............................ ........................................ Flat Roof Hip Roof(70 <0 27') ........... .............................. ....................1011023 ..........:.1 4ISS ..........?!.......... ............................................ ............................ !/ii&'iW;'E'M-ERWA HER SST ��118FS 28 ............ ........................................ ........................ 2 ANC14OR ... ........ . ECO-CP-S Q-S�..... 28 ­...................8'... .............. ............................. ........................ .- FLASHING-Ern-Fast n F1..hJr. .12'-At!Ti Matta Bock ECO�FI-BLK0812 . 3 ........................ ................................... .......................................................................................!.......... .......... .........................................................................................................................................*................... VIT, .........................*...............**.................... ...........................--................... M.km-1—rtrA-IImrIes ...............................I.............................. - . (%. In -1 ETIO-24001 ................................................................................................ ............ .......... .......... P ......................... ................................. ET S*E'A-L-0-1 ....................... .........................!.!c P _2 i......... ............ In.......................................................................... Cable WI �4� --i.................... .... 1/4-20 Sarrsted fl-p Nut S/S 0129150 14 .................................... .............. ....................... .......................... ?Rnl 14 ...................... ................. .................................................. .......... ..................I........................................................................................................... .......... (0!5 7-) Gable Roof(70<0:�450) ................. m"`oAx..................... .................... ..................... Gable .......... ...................................................... ........... ........... ...............- ................e........................ GROUNDWEEUUG#1(980011) E I n ew Zones End zones Comer Zones ..................................................... .......................--............. ............................................. ............................................... .................................. .............. .................................. ........................................................................................................................................................ t........................ ................................................................................ ................................................................................... ................................................................................................................................................................ ........... ..................................--................................... ...........................**..............."*"*"*............................................. 0 .................................................................. .............................-...............I.................... ............................................................................................................ .................................... ....................... ....................................................I.............................................. ........................................... ................. .............................................................................................................. ............... ................................................. ..................................................... ............................................... ........................................................................ ...................................................... ............................ ......................................................................... ............................................................................................................ ......................- ................................- ..................................... ........... ................... .......................................... ........................ ...................................................................... ..................................................................................................... ................................................................................ ................... ......................... ......................................... Not to Scale ................ ............................................... .................................. .................... ........................ ............................................................. ................*............... ....................................... ........................ MATERIALS ................................................................ ............................ .........................I............................................. .......................................................................I..........I.............................................. ................................... .............................................................. ...................................... ............. .............. ...............- ........................................................................................................................................................................................ ....................................................-...................................................................................................................... PV-A04 .................................................................................................-.......... .................................................. ................ ..............................................................................................................: ..................................................1-............... NOT FOR CONSTRUCTION -a�/�o Ground WEEB& Module Clamp R( S - 1 Unirac Solannourn g\aoX Rail w/L-foot YJ2�6M000 ,— 32Taugwonk5pur,Al2 Eco-Fasten QAASS y� � Ve 1, Green-Fasten With CP-SQ-Slotted Stongmron,CT 06378 Phone(860)535-3370 `aGooip• Module(TYP.) -- Bracket And Aluminum Flashing Fax(413)683-2225 t O g C Rooftop = J 5/16"x 3.5"S.S.Lag Bolt GRID-TIED e w/2.5"Minimum Penetration PHOTOVOLTAIC SYSTEM 2 F. @ 16 Cl G Sealed w/Approved Sealant 3.850kW DC @ STC �fte� CAINE,ELIZABETH 2X6 26 BARRETT PLACE NORTHAMPTON,MA 01060 Project#10243459 1 Attachment Profile 2 Attachment Detail Val lonescu Scale:3/4"=V-0" Scale:1"=1'-0" asmenEa Mike Morrison 2015-M-10 20"Max 1.22 m, REVISIONS l-- --I Roof Framing PV Module Rail Overhang �i- 39.4 in. # By Date Notes i r rnoumw,a Landscape:WA Roof Anchor A z —� Portrait:-13.0 in. &Flashing j f T ' Solarworld a I it 11�I, �� Landscape:WA 1 Plus SW275 i Anchors located ;1 ! Portrait:-40.0 in. 65.9 in.I ! mono black I s on alternate roof framing members it it it it r y �f j , I A 1. J� _ � �i Y 48'Max -_ SolarMount Rail — T nc or Spann Staggered Attachment Detail �� 3 Distance from Module Corner Not to Scale Minimum I Maximum Long Side,A 94m. 16.5 in. Short Side-,81 N/A N/A "TO6C/amps CANNOT be used on the Short Skies or the hhdule 20"Max 5 UL A roved Mounting Locations o Rail Splice \\\Rail Overhang Not to Scale WEEBLug j SS Washer T Module Frame ® / &Nut Ground Wire –� / SS Bolt Bolt i /� Unirac Rail A SS a 1 _ _ Nib Unirac \ 1 VARIES UGC-1 Stagger splice locations Min of 2 supports within the each row of modules on either side of splice s5 Flat ss Bolt DETAILS Washer with a max spacing of 60" Unirac Rail 4 Rail Splice Detail 6 Grounding Clip&Module Grounding Lug & Rail PV-A03 Not to Scale Not to Scale Not to Scale NOT FOR CONSTRUCTION PV ARRAY 1-MECHANICAL LOADS Array Area:1 254.3 ft= Total Photovoltaic Dead Load: 2.98 pst !'i.G. S Array Weig Jht t:1 756.4lbs I Avg.Dead Load per Anchor: 27.0 Ifs Anchor Oty.: 28 32 Taugwonk Spur,Al2 Design Values by Roof Zone: Corner Egde Interior Stonginton,CT 06378 Max.UniRac Rail Span: 60 in.O.C. .60 in.O.C. 60 in.O.C... Phone(860)535-3370 ..........._............ .. ............_............. Fax(413)683-2225 Max.UniRac Rail Cantilever: 20 in.O.C. 20 in.O.0. 20 in.O.C. ........................................................................... Adjusted Anchor Span: 48 in.O.C. 48 in.O.C. 48 in.O.C. GRID-TIED ............................................................................ Downforce Point Load: 374.41bs 374.4 Ibs 374.4 Ibs PHOTOVOLTAIC SYSTEM ....................................................................... Uplift Point Load: -274.6 lbs -165.7 Ibs -111.8 Ibs 3.850kW DC @ STC Minimum Anchor Strength: 707 Ibs CAINE,ELIZABETH Average Safety Factor: 5.26 26 BARRETT PLACE NORTHAMPTON,MA 01060 Project#10243459 Val lonescu a Mike Morrison �a a 2015-03-10 31-1 REVISIONS 1, 7.2" 23,-6„ # By Date Notes i 2 3 12'-11" Roof Specifications: Roof 1: Asphalt/Comp.Shingle Unili SolarMount Mounting Notes: o • Total Quantity of Attachments=28 2(xt 6"Rafters @ 16" • Roof Zones are defined by dimension,a=3.0 ft. O.C. • Maximum Allowable Cantilever for UniRac Rail is Y3 the Maximum Rail Span Pitch:23" j Azimuth:190° • Racking and Attachment:UniRac SolarMount with Eco-Fasten Green-Fasten Array Size:14 Modules with CP-SOSlotted Bracket and Aluminum Flashing attached with 5/16'x A • 3-1/2"Lag Bolt,Hex Head,18-8 SS s • All Dimensions shown are to module edges,including 1 in.Spacing between Modules required when using the Top Clamp Method. • The SolarMount Rails will extend 2-12 in.beyond the Module Edge in order to support the End Clomps. 3/16"=140" • UniRac requires one thermal expansion gap(6 in.)for continuous sections of rail greater than 40'in length N MODULE LAYOUT • Array Installed according to the UniRac SolarMount Code-Compliant Installation Manual ver.227.3,Pub 110616-icc,June 2011 g • Attachment Locations,If shown,are approximate.Final adjustment of W attachment location may be necessary depending on field conditions.All PV—A02 attachments are staggered amongst the framing members. 3 NOT FOR CONSTRUCTION 4 o �v�evo� City of Northampton f;S Building Department 2613ARRETTpLACE Plan Review 32Taugwonk Spur,Al2 212 Main Street Stonginton,53-375 /��/► Phone(86Q)535-3370 Northampton MA 01 0W Fax(413)653-2225 GRID-TIED PHOTOVOLTAIC SYSTEM (E)Driveway •� 3.860kW DC @ STC 1 CAINE,ELIZABETH ~ 26 BARRETT PLACE NORTHAMPTON,MA 01060 Project#10243459 Val lonescu Mike Morrison t Basement: 1 (E)Main Service Panel-P.O.I. ( 2015-03.10 1 (N)PV Production Meter-Locus 120 ' REVISIONS (E)Property Line ' # By Date Notes Ext.Wall: (E)Utility Meter W 3 o i 4 6 f f S 1 i (N)PV Array 14 Solarworld Plus SW 275 Mono Black Modules . 14 Enphase Energy M250-60-2LLS22 Micro-Inverters -_J 1/16"=11-0" Asphalt/Comp.Shingle Roof 2'X 6"Rafters @ 16"O.C. Pitch:23° N SITE PLAN Azimuth:190° W E s PV—A01 NOT FOR CONSTRUCTION Grid-Tied Photovoltaic System °y�/�c.,� DC Rating: 3.850 kW RIGS Caine,Elizabeth 3 26 Barrett Place Stongf� 2 on,Cr 06378 Northampton,MA 01060 Phone(483)653-3370 Jurisdiction: City of Northampton GRID-TIED Sheet List PHOTOVOLTAIC SYSTEM 3.860kW DC @ STC Scope of Work: General Notes: Sheet No. Sheet Title CAINE,ELIZABETH RGS Energy shall install a 3.850 kW Griddied Photovoltaic("PV')System 1. System follows any/all Fire Code Setbacks per Ordinances of the City PV4= COVER 26 BARRETT PLACE totaling(14)Solarworld Plus SW 275 Mono Black Modules with(14)Enphase Of Northampton. PV A01 SITE PLAN NORTHAMPTON,MA 01060 Energy M250-60-2LL-S22 Micro-Inverter(s).The Modules shall be flush 2. All projects will comply with the Ordinances of the City of Project#10243459 mounted on the asphalt/comp.shingle roof and interconnected via load side Northampton. PV-A02 MODULE LAYOUT Val lonescu breaker connection. 3. Construction Hours:7am-8pm Monday-Friday,9am-8pm Saturday, - No time on Sunday or legal Holidays. PV-A03 DETAILS Mike Morrison Equipment Specifications: 4. Product Data Sheets shall be included. PV-A04 MATERIALS Re R 2015-03-10 Module:(14)Solarword Plus SW 275 Morro Black 5. Rooftop penetrations shall be completed and sealed per code by a licensed contractor. PV-E01 ELECTRICAL DIAGRAM REVISIONS Inverter 1:(14)Enphase Energy M250-60-2LLS22 6. All Photovoltaic modules shall be tested and listed by a recognized Racking:UniRac SolarMount laboratory. PV-E02 SYSTEM CALCS # By Date Notes Attachment Flashing:Eco-Fasten Green-Fasten with 7. Certifications shall include UL1703,IEC61646,IEC61730. PV-G01 SIGNAGE CP-SQSlotted Bracket and Aluminum Flashing 8. A continuous ground shall be provided for the Array and for all 2 Photovoltaic Equipment. , 9. DC Wiring shall be run in metal conduit or raceways within enclosed Roof Specifications: spaces in a building. 9 Roof 1: 10. Conduit,Wire systems and Raceways shall be located as close as s possible to ridges,hips,and outside walls. i Asphalt/Comp.Shingle h (Single Layer) 11. Conduit between Sub Arrays and to DC Combiners/Disconnects shall 7'x 6"Rafters @ 16" use guidelines that minimize the total amount of conduit by taking the O.C. shortest path. Pitch:23" l Azimuth:190• 12. Space Requirements for electrical equipment shall comply with NEC Array Size:14 Modules Article 110. 13. Equipment grounding shall be sized in accordance with Table Site Specifications: 250.122. € Occupancy:11 14. Connectors that are not readily accessible and that are used in the Design Wind Speed:90 MPH circuits operating at or over 30V AC or DC shall require a tool for Exposure Category:B opening and are required to be marked"Do not disconnect under Mean Roof Height:25 ft load"or"Not for current interrupting",per 690.33(c)&(e). Ground Snow Load:40 PSF 15. All signage to be placed in accordance with local building code. Adj.Roof Snow Load:30.8 PSF 16. Signs or Directories shall be attached to the electrical equipment or ' located adjacent to the identified equipment. 0 All Work to be in Compliance With: 17. Signs should be of sufficient durability to withstand the environment. 2014 National Electrical Code(NEC) 18. Any plaques shall be metal or plastic with engraved or machine _.....,..._ 2009 International Residential Code QRC) printed letters,or electro-plating,in a red background with white 2009 International Building Code(IBC) lettering,a minimum of 3/8"height and all capital letters. 2012 International Fire Code(IFC) 2012 Uniform Mechanical Code(UMC) 2012 Uniform Plumbing Code(UPC) MA 780 CMR,8th Editron ^^°^ -including 214111 revisions to Tables R301.2(4)&R301.2(5) Not to Scale ASCE/ANSI 7-05 Minimum Design Loads for Buildings and Other Structures COVER As amended and adopted by City of Northampton PV-000 Apri121. 2015 To: Building Department/ Construction Official From: James A. Marx. Jr. P.E. Re: Engineer Statement for Caine Residence, 26 Barrett Place, Northampton, MA Solar Roof Installation I have verified the adequacy and structural integrity of the existing Garage Roof 1 (one layer shingles) - 2" x 6" rafters (a 16" c-c and having a roof slope distance of 12'-11" with rafter span 10'-6", pitch 2'3 deg.; for mounting of solar panels and their installation will satisfy the structural roof framing design-loading requirements of the Massachusetts building code— 780 CMR Residential Code 8th Ed. For the installation of the solar mounting, the linirac Solannount rails with EcoFasten Green-Fasten with ECO-CP-SQ Bracket will be perpendicular to the rafters with L-foot supports at 48" max. and securely fastened with 5116" dia. x %" SS lag screws. All attachments are staggered amongst the framing members. The Photovoltaic system and the mounting assembly complies with the loading requirements of roof-mounted collectors and roof penetrations. The roof structure is adequate to support self-weight of roof. PV panels (weight less than 3.0 psf) and snow loading conditions and wind pressures. The design is based on wind speed of 90 mph, exposure B and ground snow load of 40 psf. Thereby, I endorse the solar panel installation and certify this design to be structurally adequate. Sincerely. James A. Mary, Jr. P.E. Professional Engineer ' MA 36365 10 High Mountain Road Ringwood, NJ 07456 cc: RGS Energ} City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: j7 ,4 AKAw 7` z��I, r/G +�- The debris will be transported by: sv,,,XErd4,7- The debris will be received by: Building permit number: Name of Permit App icant G� Date Signature of Permit Applicant City of Northampton Massachusetts {` �Y DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building 2Jj� ba Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s) who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations, The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lelzibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone #: Are you an employer? Check the appropriate box: Type of project (required): 1.2 I am a employer with 1 4. ❑ I am a general contractor and I 6 ❑ New construction employees (full and/or part-time).* have hired the sub-contractors 2.F1 am a sole proprietor or partner- listed on the attached sheet. 7. E] Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' 9 ❑ Building addition [No workers' comp. insurance comp. msurance.t required.] 5. ❑ We area corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.['Other SoL J�2 comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: i ,�,e i�.,� d�✓s L �.1 d Policy#or Self-ins. Lic. #: AU 6- � 315 —3.6 d/Ff — o Expiration Date: Job Site Address: 62,4 J'�t 4wr7r PA Z4A " City/State/Zip: 4gld,1(&7 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalWdes ofperjury that the information provided above is true and correct. Si atur o Date: _ e.,k/G O �^ Phone# Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: A Not Applicable £ Name of License Holder: License umber o. .3D1 ��7 l'h,eS�r -:,c/O /11�, o�y�� 42 , Address Expiration Date ky A. Signature Telephone 9.Re4istered Home Improvement Contractor: Not Applicable £ Company Name Registr tion NLmber Address Expiration Date Telephone 4111-21-7— SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes.. .. £ No...... £ 11 Home Own,ner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks (C] Siding [0] Other[Qr-, =r Brief Description of Proposed Work: 1ns� ,/ (- ,94 �knC�f y�o /�✓ lysfs... Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa. if-New house and or addition to existing houslng; complete the 6ii6w,inct: a. Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT /V as Owner of the subject property _ hereby authorize to act on my b half, i�matters relative to work authorized by this building permit application.eza"- . , — ig ture of Owner f Date S as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Tw, / )"P e.4 I Print Name �- ..�/, �; 105 Signature of Owner/Agent Date LIZ . ` Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning. Tliis colinnn to be filled in by 'i Building Department Lot Size Setbacks Front Rear I Bldg.Square Footage Open Space Footage % (Lot area minus bldg&paved of Parking Spaces A. Has a Special Permit/Variance/Finding ever been issued for/on the site? ~� �~� YY �_� x~�� NO «+/ DON7KNO YES �~� IF YES, date issued:' IF YES: Was the permit recorded at the Registry of Deeds? NO � 1 D �� 0- IF YES: enter Book Pagef and/or Document# �� �� B. Does the site contain a brook, body of water nrwetlands? NO �~��� DONT KNOW �~� YES t�� IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs tubeobtained �~� Dbtained �~� Date � �_/ �_� ' C. Do any signs exist on the property? YES �~� NO 0 IF YES, describe size' type and location: D. Are there any proposed changes toor additions of signs intended for the pnoperty7 YES 0 NO — IF YES, describe size, type and location: E. VW||the construction activity disturb(clearing, grading, excavation,orfi(|inO)over 1 acre orisit part ofa common plan ' that will disturb over 1acre? YES NO 0 IF YES,then a Northampton Storm Water Management Permit from the DPW is required. ' � - k of Northampton FWS s ofPermrt ` ding Department 2 Main Street i Room 100 r/VitellAyailabillty Lj�Electric, F --�rth mpton, MA 01060 Two,Sefs of Structural Plans Northam p,o hone.4 " '$ -1240 Fax 413-587-1272 'P 81 Plans OtherSpemfy APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE.INFORMATION 1.1 Property Address: Thls section to be'completed by office UR ,T P4 nit JlAp�- Ki•�.�0}��1 /�, 61D6v Zone Overlay District Elm St,District `:i CB District ` SECTION 2.-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Print) C/r I ilir�g/A¢{ir �d h n �((� r k Sign ture Tele �n ,`_ 2.2 Authorized Agent: L� 7oi� �a.0, ,� GBH�NG� Gvt.�Kp /e- �U OR a�7 c`ias�PLFilp��Nlti Name(Print)) Current Mailing Address: t9/0�Z 4113- a g 7_,f1 d q Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building ov (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of 7dV Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) 6�,�. ''� Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: _ Building Commissioner/In.spector'of Buildings Date File#BP-2015-1273 APPLICANT/CONTACT PERSON THOMAS DOLAN ADDRESS/PHONE P O BOX 297 CHESTERFIELD01012(413)585-0612 Q PROPERTY LOCATION 26 BARRETT PL MAP 3 1 B PARCEL 173 001 ZONE URC000V THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildiniz Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED 3.85 KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 039281 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: roved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management o on De y //V Signature uilding Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 26 BARRETT PL BP-2015-1273 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 3 1 B- 173 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2015-1273 Project# JS-2015-002336 Est.Cost: $9625.00 Fee: $55.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: THOMAS DOLAN 039281 Lot Size(sq. ft.): 16160.76 Owner: CAINE THOMAS P&ELIZABETH S zoning:URC(100)/ Applicant: THOMAS DOLAN AT: 26 BARRETT PL Applicant Address: Phone: Insurance: P O BOX 297 (413) 585-0612 () Workers Compensation CHESTERFIELDMA01012 ISSUED ON:611212015 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ROOF MOUNTED 3.85 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/12/2015 0:00:00 $55.00 212 Main Street, Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner