Loading...
17C-211 (13) Apr-24-02 08: 52 p_O2 1 BEAM CALCULATIONS Beam Calculation Pro am for Uniforrnly Loaded Beam Project name: Florence avin s Bank-Main Office Beam location/Number Stair#4-Landing Span in Feet: 8 equals 96 inches Load on Beam; tribut area x( sf)divided by length of beam First Floor Second Floor Attic Roof 0 Wall Other 600 Total Load 600 tbs per foot equals 50 tbs./inch Moment 57.6 inch/kips Section Modulus Re uired: Sx for Steel Beam 2.4 inches cubed Sx for Microlam Bcair 20.5714 inches cubed Sx for Wood Beam 57.6 inches cubed Beam Chosen Deflection Check: Maximum Allowable Deflection V360) = 0.26667 inches E(steel) 2.9E+07 Ix from chart 48 it41 fl% P Deflection 0.03972 inches E(microlam) 2000000 Ix from chart 800 Deflection 0.03456 inches E (wood) 1200000 Ix from chart Deflection I #D1V/0! linches Seem c cs Undarm load 4/242002 1 of 1 Apr-24-02 08: 52 P_O1 . l 7e-all ENROYAL FES16NNEWILDERS incorpomwd I 9 Facsimile To: Tony Patillo Fax: (413) 587-1272 From: Paul H. Bourbeau, AIA Date 4/24/2002 Director of Architectural Services Re: Florence Savings Bank- Main Pages: 2 Office CC: ® Urgent RI For Review ® Please Comment 8 Please Reply Tony, Please find enclosed a beam calculation sheet for the modified landing beam in Stair!#4 . The beam is actually a W 12 x 14. T have used the section modulus of a W8 x 13 for calculation purposes. I have also used a loading on the beam of 1.50 PSF, well above the actual loading. Total calculated deflection is .04" over 8'-0". Total allowed deflection for 8'-0" is .27". As you can see, we are well under the acceptable limit. If you have any other questions, please call. Thanks, Paul 82 Tide Mill Road ❑ Hampton, NH 03$42 ' ' ' ' ' ' ' 'phone(603)928-4533 fax(903)929-5907 ,ray-17-02 11 : 22 P.02 ROYAL DESIGNOBUILDERS May 17, 2002 Mr. Anthony Natillo Florence Building Commissioner City of Northampton 212 Main Street Northampton. MA 01060 Re: Florence Savings Rank Bear Tony. We request an extension of our temporary occupancy permit for the lower basement and existing second floor. the. installation of the architectural stairs has delayed the occupancy for the I" and 2nd floors. Schedule to occupy is June l0`"and we will schedule final inspection with you soon. Thank you for your cooperation. Tf you have any questions, please don't hesitate to call me. Sincerely, James C. Schwartz , VP Operations JCS/pmc 82 Tide Mill Road Hampton, NH 03842 Phone (603) 926-4533 IN Fax(603)926-3507 ■E-mail mail(drroyaldesignbuiders com www.rnyaldeskgnt)uilders.coni P.01 May-17-02 11 : 22 MAY 2 1 .,, .■ DESIGN ■ 6UILDERS Facsimile To: Mr. Anthony Patillo Fax: 413-587-1272 Florence Building Commissioner From: James C. Schwartz Date: May 17, 2002 VP Operations Re: Florence Savings Rank Pages: 2 Including Cover Main Office — CC: ® Urgent O ForRcview ❑ Pk!svC'ommcnt ❑ P1eawReply Tear Tony. Request li►r an extension of our temporary occupancy permit to lifiiaw. Please call if you have any questions. Sincerely, Jim 82 Tide Mill Road 0 Hampton, NH 031342 .p h �(603)928-4 533 fax'(803 k2 -s907 one