17C-211 (13) Apr-24-02 08: 52 p_O2
1
BEAM CALCULATIONS
Beam Calculation Pro am for Uniforrnly Loaded Beam
Project name: Florence avin s Bank-Main Office
Beam location/Number Stair#4-Landing
Span in Feet: 8 equals 96 inches
Load on Beam; tribut area x( sf)divided by length of beam
First Floor
Second Floor
Attic
Roof 0
Wall
Other 600
Total Load 600 tbs per foot equals 50 tbs./inch
Moment 57.6 inch/kips
Section Modulus Re uired:
Sx for Steel Beam 2.4 inches cubed
Sx for Microlam Bcair 20.5714 inches cubed
Sx for Wood Beam 57.6 inches cubed
Beam Chosen
Deflection Check: Maximum Allowable Deflection V360) = 0.26667 inches
E(steel) 2.9E+07
Ix from chart 48 it41 fl% P
Deflection 0.03972 inches
E(microlam) 2000000
Ix from chart 800
Deflection 0.03456 inches
E (wood) 1200000
Ix from chart
Deflection I #D1V/0! linches
Seem c cs Undarm load
4/242002 1 of 1
Apr-24-02 08: 52 P_O1
. l 7e-all
ENROYAL
FES16NNEWILDERS
incorpomwd I 9
Facsimile
To: Tony Patillo Fax: (413) 587-1272
From: Paul H. Bourbeau, AIA Date 4/24/2002
Director of Architectural Services
Re: Florence Savings Bank- Main Pages: 2
Office
CC:
® Urgent RI For Review ® Please Comment 8 Please Reply
Tony,
Please find enclosed a beam calculation sheet for the modified landing beam in Stair!#4 .
The beam is actually a W 12 x 14. T have used the section modulus of a W8 x 13 for
calculation purposes. I have also used a loading on the beam of 1.50 PSF, well above the
actual loading. Total calculated deflection is .04" over 8'-0". Total allowed deflection for
8'-0" is .27". As you can see, we are well under the acceptable limit. If you have any
other questions, please call.
Thanks,
Paul
82 Tide Mill Road ❑ Hampton, NH 03$42 ' ' ' ' ' ' ' 'phone(603)928-4533 fax(903)929-5907
,ray-17-02 11 : 22 P.02
ROYAL
DESIGNOBUILDERS
May 17, 2002
Mr. Anthony Natillo
Florence Building Commissioner
City of Northampton
212 Main Street
Northampton. MA 01060
Re: Florence Savings Rank
Bear Tony.
We request an extension of our temporary occupancy permit for the lower
basement and existing second floor.
the. installation of the architectural stairs has delayed the occupancy for the I"
and 2nd floors. Schedule to occupy is June l0`"and we will schedule final inspection with
you soon.
Thank you for your cooperation. Tf you have any questions, please don't hesitate
to call me.
Sincerely,
James C. Schwartz ,
VP Operations
JCS/pmc
82 Tide Mill Road Hampton, NH 03842 Phone (603) 926-4533 IN Fax(603)926-3507 ■E-mail mail(drroyaldesignbuiders com
www.rnyaldeskgnt)uilders.coni
P.01
May-17-02 11 : 22
MAY 2 1
.,, .■
DESIGN ■ 6UILDERS
Facsimile
To: Mr. Anthony Patillo Fax: 413-587-1272
Florence Building Commissioner
From: James C. Schwartz Date: May 17, 2002
VP Operations
Re: Florence Savings Rank Pages: 2 Including Cover
Main Office —
CC:
® Urgent O ForRcview ❑ Pk!svC'ommcnt ❑ P1eawReply
Tear Tony.
Request li►r an extension of our temporary occupancy permit to lifiiaw.
Please call if you have any questions.
Sincerely,
Jim
82 Tide Mill Road 0 Hampton, NH 031342 .p h �(603)928-4 533 fax'(803 k2 -s907