17C-211 (11)
i Y t Planning Board - Decision City of Northampton File No.: PL-2001-0018 Date: September 27, 2000 continued presence of the bank was absolutely essential to the overall vitality of the downtown Florence area. Particularly with the_ parking lot the agreements worked out with the neighbors were really acceptable;it was a good process,and he thought most people were happy with the result, Ghiselin remarked. Ghiselin said there was an idea that if striping was allowed on Keyes Street, there would be handicapped accessibility there. He asked if that was still part of the plan? The consultants indicated it was. Ghiselin commented that it would be a really big benefit since there was presently no handicapped parking there. Growhoski noted that the bank had gone to considerable expense. It certainly was the intent to reserve two spaces there for handicapped parking,he confirmed. Yacuzzo asked if anyone wished to speak in opposition? No one spoke. Misch said she thought the applicant had addressed the concerns the DPW had submitted,and those were the only outstanding issues. She reminded that there should be follow-up on the transportation study's recommendation of a stop sign[at the exit of the new bank parking lot]. Isaza moved to close the hearing. Neal seconded. The motion passed unanimously 6:0. Jodrie moved to grant the request by Florence Savings Bank for a Site Plan Special Permit for the construction of a two-story addition with full basement to the north of the existing bank located at 85 Main Street,Florence. Diemand requested that a condition be included to require proper on-site management during construction to minimize the impact on residential areas. Yacuzzo raised Misch's suggestions that if the City Council approved striping the spaces,FSB incur the cost and not the city,and that they put a stop sign at the exit to the parking lot on Depot Street. Jodrie agreed to the amendments to his motion. Isaza seconded. The amended motion passed unanimously 6:0. John Heaps said he was proud to be involved in the approval process, which he saw as a model for the community in terms of excellent site plan review,input from the neighbors,etc. GeoTMS®1998 Des Lauriers&Associates,Inc. ' Planning Board - Decision City of Northampton File No.: PL-2001-0018 Date: September 27, 2000 They would not remove the sewer line on the present house site,he said _ Regarding the issue of an easement in favor of Jasinski,Schwartz said this was being worked out with an easement agreement,so there would be access to the Jasinski property. The landscaping will be relocated,and the driveway will be extended in the middle,he presented. They will apply for permits for new sewer and water tie-ins at the time of construction,he confirmed. Schwartz described proposed lighting as five fourteen-foot-high pole lights with high-pressure sodium fixtures. They also have five bollard-type fixtures in the pedestrian walkway. They were in compliance with the zoning regulations with regard to setbacks,lot area,depth,maximum building height,coverage, parking and open space,he asserted. At Yacuzzo's request, Schwartz reviewed compliance with the parking requirement. There are one hundred and twenty(120)parking spaces,and they are proposing a reduction to one hundred and nineteen spaces,he reported. Required parking is ninety-six(96)spaces based on the square footage of the existing building less the cellar area,he advised. Member Questions. Neal asked if the easement to the Jasinski property would remain open? Growhoski informed members that the existing easement had been the subject of contention. They had reached an agreement whereby the right-of-way would be relocated to the center of the parking lot. Part of that agreement involved the re location of plantings. At this point there was no discussion of it being closed,he advised Growhoski submitted that the project met all the requirements of the Zoning Ordinance. He reviewed the criteria for granting a Special Permit,stating affirmatively that the project met each one. Regarding whether it promoted a harmonious relationship with existing buildings, etc.,he pointed out that they were somewhat tied to what the existing building looked like,but an effort had been made to design it in keeping with other buildings in downtown Florence. He confirmed that the use promoted city planning objectives. Regarding additional requirements in Section 10.11.6,he confirmed curb cuts were minimized and that pedestrian and bicycle traffic were separated on site to the extent possible. [Acting City Engineer]George Andrikidis assured them the city storm drain system could accommodate projected discharge from the project with no adverse effects, he shared. Catch basins have four-foot sumps,he volunteered. Growhoski requested approval,submitting that the project was good for downtown Florence and good for Northampton. Diemand asked if there was a way to manage construction so that heavy vehicles would not be going through Keyes Street but would be directed through Depot Avenue? He indicated it would be advisable to keep them away from residential areas for safety reasons. Consultants said that wouldn't be a problem. Jim Czach, Traffic Engineer with Fuss&O'Neill,said they had done traffic counts at bank driveways and at some of the adjacent intersections that would be impacted and also obtained accident reports from the Police Department. They did projections of future traffic with the project in place and looked at the evening and morning commute periods,he advised. The purpose was to give existing employees more room,but they took into account additional employees that would be working there,he affirmed. There were no accidents reported at any of the bank driveways,but there were some at[nearby]intersections,he related. Most of the nearby intersections operated at Level of Service(LOS)A;two were at B,and one was at C,Czach advised. During peak commute times,that was excellent They did projections of new site traffic based on employees and customers. They anticipated there would be an additional sixteen trips during the morning peak hour and evening peak hour,primarily new employees. When they did a build capacity analysis, the LOS was constant at all intersections,he presented. (The delay increased maybe a second,he said.) Based on that they didn't see any problems at all,he concluded. Their recommendations included moving one of the parking spaces in front of the ATM as well as striping along Keyes Street, he added. Yacuzzo confirmed they were only projecting ten additional employees by 2005. Diemand asked who would grant permission for space removal? Yacuzzo said it was the City Council. They could condition the permit to require that the bank incur the cost if the City Council grants permission for striping of the spaces along Keyes Street,but they couldn't condition the permit on removal of the space, Yacuzzo clarified. Public Comment. Yacuzzo asked if anyone would like to speak in favor? Alex Ghiselin, Ward V City Councillor,said he would like to speak very strongly in favor. He said he attended the hearing held by the bank,and at least thirty people were there,including most of the immediate neighbors and most of the businessmen. There were objections to details but overwhelming support for the project itself,he related. Ghiselin said he thought the consensus was that the GeoTMS®1998 Des Lauriers&Associates,Inc. Planning Board - Decision City of Northampton File No.: PL-2001-0018 Date: September 27, 2000 On September 14,2000 at 8:02 p.m., Yacuzzo opened the Public Hearing on a request by Florence Savings Bank for a Site Plan Special Permit for the construction of a two-story, 16,785 s.f.addition with full basement to the north of the existing bank under Sections 10.10 and 10.11 of the Zoning Ordinance for property located at 85 Main Street Florence,also known as Assessor's Map 17C,Parcel 211. The project will include the relocation of an existing 24-space parking area to a lot formerly occupied by a two-family residence and a lawn mower repair shop and the addition of utilities,stormwater management structures,lighting and landscaping. Yacuzzo read the legal notice. Thomas Growhoski, Esq. of 60 State Street opened the presentation by informing members that Florence Savings Bank was founded in 1873 and had been providing banking services to the Florence community since that time. Growhoski explained the organization of the bank-that it was a mutual savings bank with no shareholders. Corporate officers are all committed to preserving what's best for Florence,he commented. The bank believes it is an important asset for Florence not only for providing banking services and employment for Florence but also as an active member of the business community. Growhoski reported that they had held a neighborhood meeting to get their input,and the response was overwhelmingly favorable. Some expressed concerns,and plans were revised in terms of landscaping and parking to address those concerns,he advised. There were a few neighbors whose concern seemed to be that Florence Savings Bank was changing the character of downtown Florence by removing not necessarily pretty buildings and replacing them with parking and landscaping,he related. Growhoski noted that over the last several years,Florence Savings had opened five branch banks,implemented 24-hour telephone service and recently,Internet banking,reducing the number of customers who needed to come to the bank. Growhoski continued by submitting that the bank is a vital part of the business district. He noted that they had considered having people at other locations but had concluded that the bank works best and functions best when everyone is in the same location. They were a fortunate city in having two vibrant and alive business districts,he commented. He noted that there had been tremendous changes in banking. He reminded members that he had come before them in 1995 and stood up and said the bank had no plans to make any changes at its Florence office. However,since then,[due to]changes in banking and consolidation,[plans had changed.](Every time one of the smaller,regional banks was taken over by a national bank,FSB enjoyed enormous growth in customers seeking local services,he related.) The growth hadn't occurred at the main offices;it had been at its branches,he observed. They were seeking permission to provide the space not for more employees but for the backroom operation to support that growth. The addition is mainly to provide more space to operate efficiently,he concluded. Growhoski introduced Ted Vrettos and Jim Schwartz of Royal Design Builders,John Heaps, the President of Florence Savings Bank, Cathy Porter of Ford Gillen Architects,Inc.and Jim Czach and Jon Dietrich of Fuss&O'Neill. Schwartz described the project as a sixteen thousand seven hundred and eighty-five square-foot(16,785 s.f.)addition to project from the existing bank in a northerly direction. It will be a two-story addition with a full basement he presented. As proposed, the existing twenty- four car parking lot will be eliminated,and a new sixteen-car parking lot will be constructed on an adjacent lot following removal of the wooden structure presently on the property. He pointed out a landscaped area and pedestrian walkway shown on the plan. Schwartz reviewed the Special Permit application. With regard to drainage,he said the parking lot would be sloped,and he pointed out the location of catch basins to be tied in to the drainage manhole on Depot Avenue. There will also be a landscape drain tied into a drywell and connected to this manhole. With regard to buffers,Schwartz said landscaping would provide buffers. Existing trees(Honeylocusts)will remain with one new one added,he presented. The two-story addition is in keeping with adjoining buildings on Main Street. Minimum open space is presently at twenty-eight percent(28%)and will remain at 28%,he advised. Schwartz drew attention to the bike rack shown on the plan. Regarding traffic impacts,Schwartz said they anticipated the proposed use would not generate much more traffic to the bank;they had submitted a traffic study and trip reduction plan,he noted. He showed the location of the existing curb cut to be eliminated and of the proposed new driveway entrance. Regarding access for emergency vehicles, the driveway is twenty feet wide,he said. He also showed the location of the sixteen new spaces,including a handicapped space. Regarding whether the requested use promoted a harmonious relationship with existing buildings and the natural landscape,he pointed out that the landscaping plan was a continuation of what the bank had done in the past. The new addition blends in with the existing architecture,he commented. They had used a gable roof,in keeping with some of the other gable roofs in downtown Florence,he pointed out. DPW Concerns. Schwartz addressed comments from the Department of Public Works(DPW). Regarding concerns about stormwater management,he said the bank would try to use reduced amounts of sand on the parking lot. He referred to an Operation&Maintenance Plan which had been submitted and read excerpts from the plan. He confirmed the existing sewer line and water lines into the building would be used. They were adding a new line for an automatic fire sprinkler protection system. Schwartz noted that they would like to eliminate one of the parking spaces on Main Street in the area of the ATM,since it was a hazard. They also would like to strip parking spaces along Keyes Street,he said. He said they would petition the City Council on that matter. GeoTMS®1998 Des Lauriers&Associates,Inc. c Planning Board - Decision City of Northampton _ File No.: PL-2000- Date:September 14,2000 Pursuant to Massachusetts General Laws(MGL),Chapter 40A,Section 11,no Special Permit,or any extension,modification or renewal thereof,shall take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have elapsed after the decision has been filed,or if such an appeal has been filed that it has been dismissed or denied,is recorded in the Hampshire County registry of Deeds or Land Court,as applicable and indexed under the name of the owner of record or is recorded and noted on the owner's certificate of title.The fee for such recording or registering shall be paid by the owner or applicant.It is the owner or applicant's responsibility to pick up the certified decision from the City Clerk and record it at the Registry of Deeds.(Please call the City Clerk prior to picking up the decision.) The Northampton Planning Board hereby certifies that a Site Plan Special Permit has been GRANTED and that copies of this decision and all plans referred to in it have been filed with the Planning Board and the City Clerk. Pursuant to Massachusetts General Laws,Chapter 40A,Section 15,notice is hereby given that this decision is filed with the Northampton City Clerk on the date below. If anyone wishes to appeal this action,an appeal must be filed pursuant to MGL Chapter 40A,Section 17,with the Hampshire County Superior Court or the Northampton District Court and notice of said appeal filed with the City Clerk within twenty days(20)of the date of that this decision was filed with the City Clerk. Applicant: Florence Savings Bank-85 Main Street,Florence DECISION DATE: September 14, 2000 DECISION FILED WITH THE CITY CLERK: September 27, 2000 r r' " CERTIFICATK OF SERVICE Pursuant to M.G.L. Chapter 40A, Section 11, I, Laura Krutzler, Board Secretary, hereby certify that I caused -copies of this-decision to be mailed, postage—prepaid, to the applicant and owner on September"27 2000. Planning Board - Decision City of Northampton File No.: PL-2001-0018 Date: September 27, 2000 defined in City master or study plans adopted under M.G.L. Chapter 41,Section 81-C and D. _ In addition,in reviewing the Site Plan,the Planning Board found the requested use complies with the following technical performance standards: 1.Curb cuts onto streets are minimized because an existing curb cut is being eliminated and replaced with a new driveway entrance. 2.Pedestrian,bicycle and vehicular traffic are separated on site to the extent possible. 3.The project will discharge into a City storm drain system which the Planning Board found can accommodate the expected discharge with no adverse impacts. Catch basins incorporate sumps of a minimum of three(3)feet. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 8124100 917100 9128100 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 8131100 11/1/00 9114100 9114100 10/17/00 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 8131100 9114100 9114100 9127100 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 917100 8:00 PM 1130101 1130101 MEMBERS PRESENT: VOTE: Alton Neal votes to Grant Orlando Isaza votes to Grant M.Sanford Weil,Jr. votes to Grant Paul Diemand votes to Grant Daniel Yacuzzo votes to Grant Kenneth Jodrie votes to Grant MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Kenneth Jodrie Orlando Isaza 6 Approved with Conditions MINUTES OF MEETING: GeOTMS®1998 Des Lauriers&Associates,Inc. Planning Board - Decision City of Northampton File No.: PL-2001-0018 Date: September 27, 2000 APPLICATION TYPE: SUBMISSION DATE-] Major Project--Site Plan Special Per 8128100 J �i f T OF oRfl tt;TlriEa�� Applicant's Name: Owner's Name: s Name: NAME: NAME: COMPANY NAME: Florence Savings Bank Florence Savings Bank ADDRESS: ADDRESS: ADDRESS: P O Box 60700 P O Box 60700 TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: FLORENCE MA 01062-0700 FLORENCE MA 01062-0700 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: (413)586-1300 (413)586-1300 EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS: Site Information: STREET NO.: SITE ZONING: 81 MAIN ST GB TOWN: SECTION OF BYLAW: NORTHAMPTON MA 01060 55 MAP: BLOCK: I LOT: MAP DATE: ACTION TAKEN: 17C 211 001 Approved With Conditions NATURE OF PROPOSED WORK: Site Plan Special Permit for construction of a two-story, 16,785 s.f.addition with full basement to the north of the existing bank. Project includes the relocation of an existing 24-space parking area. HARDSHIP: CONDITION OF APPROVAL: 1) The construction site must be managed so that truck traffic is directed toward Main Street and away from residential streets. 2) If the City Council approves striping the spaces along Keyes Street as recommended by the traffic study,Florence Savings Bank shall incur the cost of such striping and not the City. 3) As recommended by the traffic report,the applicant shall put a stop sign at the exit to the new bank parking lot on Depot Avenue. FINDINGS: In Granting the Site Plan Special Permit the Planning Board found. A.The requested use(a 16,785 s.f addition to an existing bank)protects adjoining premises against seriously detrimental uses because it will not change the use of the property as a bank,which is an allowed use in the General Business district. The applicant has made provision for buffers(additional landscaping)and for handling stormwater as depicted on plans and information submitted with the application. B.The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and minimize traffic impacts on the streets and roads in the area. The addition is not expected to generate substantial additional traffic,according to the consultant's traffic report. The projected increase in traffic will not change the level of service of nearby intersections and will result in only modest increases in the volume of traffic on adjacent streets. Representatives of Florence Savings Bank have stated their intention to petition the City Council for the removal of a parking space on Main Street in the area of the ATM machine to enhance traffic safety. C.The requested use promotes a harmonious relationship of structures and open spaces to the natural landscape,existing buildings and other community assets in the area because the addition has been designed to be in keeping with the existing bank and existing architecture in the downtown Florence area. D.The requested use will not overload the City's resources,including the City's water supply and distribution system,sanitary and storm sewage collection and treatment systems,fire protection,streets and schools. E.The requested use meets all special regulations set forth in the Zoning Ordinance under Section 10.11. (See below for additional criteria.) C.The requested use bears a positive relationship to the public convenience or welfare and will not unduly impair the integrity of character of the district or adjoining zones. The use is not detrimental to the health,morals,or general welfare and is in harmony with the general purpose and intent of the Ordinance. D.The requested use will promote City planning objectives to the extent possible and will not adversely affect those objectives,as GeoTMS®1998 Des Lauriers&Associates,Inc. r ROYA L NoBUILDERS CD T 7 'ttal Memorandum ..............I................ ...... .. ................................ 'To_,.__._NOrthampton Building Department 212 Main St. Room 100 Northampton, Ma 01060 From: Larry, Ziner; Sr. Project Manager Date: 12/18/00 Re: Florence Savings Bank, 85 Main St., Florence Attached: 3 sets Site Drawings C-1 — C-9, dated 8/24/00 Foundation S1.1 dated 10/12/00 Building Permit Application Permit Fee Memo: Dear Sir, Enclosed please find an application for building permit along with three sets of site drawings and engineer foundation drawing. At this time, we are requesting a foundation permit. Complete sets of stamped architectural, structur mechanical, and electrical drawings will follow. If you have any further questions, please do not hesitate to contact myself or Jim Schwarts at 603-926-4533. Respec, fully L r nce N. Ziner Sr' roject Manager 82 Tide Mill Road Hampton, NH 03842 *phone (603)926-4533*fax(603)926-5907*e-mail larry@royaldesignbuilders.com . ROYAL� .DESIGN ■ BUILDERS Interoffice Memorandum . ............ To: Jim Schwarts CC: From: Larry, Ziner; Sr. Project Manager Date: 12/18/00 Re: Florence Savings Bank Job: 529 Job Cost Code: 20001 Building Permit Fee: Basement: 5,280 sf @ .10/sf= $ 528.00 1 st Floor: 5,260 sf @ .40/sf= $2,104.00 2nd Floor: 5,248 sf @ .20/sf= $1.049.60 Total Permit Fee = $3,681.60 82 Tide Mill Road Hampton, NH 03842 phone (603) 926-4533 fax(603) 926-5907 e-mail royaldesign @rcn.com �•�1tAMP�. �o oy g Grit 1 f7f Nart4aill f ell � 6 �asaxclittarifa DEPARTMENT OF BUIL ANG INSPECTIONS 212 Main Street ' Municipal Building Northampton, Mass. 01060 WORKER'S COMPENSATION INSURANCE AFFIDAVIT (licensec/permittee) with a principal place of business/residence at: 4�-� -�ic��. �1�� ��. �1c. .•. on vy�\ 01Wy-J (phone#) (street/ci ty/state/ri p) do hereby certify, under the pains and penalties of perjury, that: �) I am an employer providing the following worker's compensation coverage for my employees working on this job: (Insurance Company (Policy Number) (Expiration Date) ( ) I am a sole proprietor, general contractor or homeowner (circle one) and have hired the contractors listed below who have the following worker's compensation policies: (Name of Contractor) (Insurance Company/Policy Number) (Expiration Date) r. (Name of Contractor) (Insurance Company/Policy Number) (Expiration Date) (Name of Contractor) (Insurance Company/Policy Number) (Hxpiration Dale) (Name of Contractor) (Insurance Company/Policy Number) (Expiration Date) (attach additioml shod ifneocniry to include information pertaining to au cow odors) ( ) I am a sole proprietor and have no one working for me. ( ) I am a home owner performing all the work myself. NOTE:please be aware that while homeowners who employ pare=to do mAhAcnatxe,cmsLVctiou or mpair work out dwelling of not more than throe touts in which the homeowner sides a oa the groin appurtenant thettto are not Scn= y oomidcr ed to be employ—under the worircr ration Ad(GL152,ss 1(5)�application by a homeowner for a license or pa-mit may evidcooe the legal status of an employer uader the Workeet Compomation Ace. I understand that a copy of this r atemm2 may be forwarded to the Dtpartmca of Kiel A=d—&Ofliec of Iaxusaoe for the cov=gc verification and that failure to sccz re coverage under section 25A of MGL 152 can lead to tho impitiou of criminal penalties oomisti ng of a fine Of up to 11,300.00 and/of'imprisoameai of up to one year and civil pcn&Wcs is the form of a Stop Work order and a &m of 5100.00 a day against me For&Put m--�uao only ? Permit Number S / Map,4 Lot# ;. ofLicanseelPe 'txec e/ Version 1.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(7801CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes......❑ No..... SECTION 11 - OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR'CdNTRACTOR APPLIES FOR,BUILDING PERMIT I, f,occ nQ, •+�. s as Owner of the subject property hereby authorize %--2'C"4-A Oe s�._.� 3.,��ec�, to act on my behalf, in all tters r lative to work auth ed by this building permit applica 'on. J Signature of Ow r Date as Owner/Authorized Agent hereby de tare that the s atements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. //610pD2C; L. 67TO-S Print Name Signature of Owner/Agent Date SECTION 12 -CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder : ` rwttr%Le _ �)• `Z�r�O�� G S e 60?3 3 1 License Number Address ExpAtio. Date o3- 6- (/t'33 Signat re Telephone SECTION 13 -WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c, 152,§256(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes......"M No...... ❑ t ` ! �lfffl�litttf DEPARTMENT OF BUIL.DD$G INSPECTIONS INSPECTOR 212 Main Strtet • Municipal Building Northampton,MA 01060 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional EngineerdArehitects responsible for only portion of a controlled project) Project Title: -)& Date: I Z-— rj" �t7 Project Location: T- Map: Parcel: Zone: Scope of Project' �. 6p90 s-� 1 ; 4-�o v In accordance with the sixth+edi�tion�Massachusetts State Building Code,780 CMR SECTION 116.0: I, R�A1J S, ±TE L-1,LJ Mass.Registration.NumbAr 3-7 Being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: (]Fire tion (J ArcSuvctural {J M04ALcal [J Eical {j Other(specify) Nv-A� for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable enginecrieg practices and all applicable law,for the proposed project. Fltttlwrtnore,I understand and AGREE that I shad perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approvcd for the building permit. Upon completion of the work, I shall submit a final report as to the satisfactory completion of the above- mentioned portion of the work. Signature and Seat of registered professional: ���11% OF RYAN S. yp HELt_w!G BYRUCrURAL H No. 37300 - �FG'tSTFRE� FSS1pNAt E�Gt� Fax 413-587-1272 -phone 413-587-1240 t Q„(t1AMP�. Crit� of Wort4a tpton $ � �4lassschusctte Z � I DEPARTMENT OF BUILDING INSPECTIONS / INSPECTOR 212 Main Street • Municipal Building °�4 5�•' Northampton, MA 01000 CONSTRUCTION CONTROL DOCUMENT (for professional Engineers/Architects responsible for Entire Project) Project Title: f 1 t,^q, Date: 11 Od Project Location:5rt -o S 1. \ Map: Parcel: Zone: Scope of Project: /L ?Trf- csta into r In accordance with the sixth edition Massachusetts State Building Code, 780 CMR SECTION 116.0: I, ?0 ,v� 30Q r\c�,%Cc,0 , f df i Mass. Registration Number�Q � Being a registered professional En=gineeerr/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Entire Project for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit and shall be responsible for the following as specified in section 116.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction documents as submitted for the building permit,and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. I shall submit periodically, in a form acceptable to the building official,a progress report together with pertinent comments. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory completion and readiness of the project for occupancy. Signature and Seal of registered professional: 'RED A oR'C Qe No.8068 o � HAMPTON BEACH o N.H. Fax 413-587-1272 -phone 413-587-1240 F9�r� OF Masi' Nov-20-00 11 :27A P .02 Versiuel.7 Commercial Building Permit May 15, 2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES- FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35.()00 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: ^ — -_ -- Not Applicable O Nirri;:rRcg'istrart`.;: — �} Registration Number I �r� "Tr�C. �t t� 1�c1. �P w m�1 v n �'�_ 0��`�•�- _ 1 Address _ }I Y� Expiration Date �3 Signature Telcpt,onc 92 Registered Prafessiunal Engineer(*)—_ Name Area of Responsibility Address Number yf $ign.ilure Telephony. Expiration Date 7 ere IJarnc Area of Respurrs bility r;ticires ' Registration NLmbcr L, -onr Tale i EtpiraG cn Date N:rrc --- Area of Responartiility - ------ Address -- -___ - Registration Number sirrature - - Telephone — Expiration Datc fa:�;rtr Area of Pesp(,rsi!)ility Address Registra.ion Ntjmhcr Sipr.aturr: _ - Telephone Expiration Llate 9.3 General Contractor ...� S mot"� C rI,, %�C . -- N�ai At•,p'�ic3'nic C-J W r,onsil]la In Chorge of(-. strL0101l 7-n- 'T; �� !i,lam_4� �.;1:�+ �.f-1. 4127-/:' i Address Versionl.7 Commercial Building Permit May 15,2000 SECTION 9- PROFESSIONAL I?ESIGN;AND CONSTRUCT ION;SERVICES - FOR BUILDINGS AND'STRUCTURES SUBJECT ) CONSTRUCTION CONTROL PURSUANT TO 780''CMR 116(CONTAINING :MORE THAN 35,000 C.F. ditNCLOSED SPACE) 9.1 Registered Architect: 11 ;� Not Applicable ❑ Name(Registrant): 7l Registration Number ae 1 wZ lon wit 0 re s Expira i Date �0 3.46- YS-33 n nature Telephone 92 Registered Professional Engineer(s): _ V a G � L• Nam Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility W X 01"I Address Registration Number Signature Telephone Expiration Date r irt Pc If 1On Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor / deSAI 4 AT u i�l�ih r Not Applicable ❑ Comp ny Name: z1 w rBn e-t JV. -'r�ro,'Pc 1 .�n a na rc Responsible In Charge of Construction 1_ Address ` Signatur Telephone 11/10/LtICJCI 1U.41 0/Cl UKUWHUbV l L., k ALLAHAN HAUE U2 OC1-2400 11:11:42 Ka+epshire County Registry of Deeds Receipt No: 135383 Marianne L. Donohue, Register of Deeds 33 King Street Northampton, MA 01060-3298 me: GROYHO5KI, CALLAHAN. KUNDL 8 KUZMESKI Addr: 60 STATE STREET NORTHAMPTON. MA 01060-0000 KATHY ceipt Type: OR Payment otai Pages: 0003 Fees Taxes Fee: E 10.00 Cash: $ 0.00 S 0.00 Tax: $ 0.00 Check: $ 10.00 S 0.00 Misc: S 0.00 Charge: $ 0.00 Charge Code: Comment: FS8 SITE PLAN DECISION Lceipted By. DIANE Status. PAID DOCUMENT5: 992022898 to 992022898 ---------------------------------------------------------------------------------------------------------------------------------- ie Page Doc %ref Considers Record Fee Excise Tax Stat Misc fee Record Date Document* Book/No/Page Status -- ---- --- ---- ----------- ----------- i3 003 0001 0000 0.00 10.00 0.00 0.00 23-OCT-2000 11:11 992012898 OR /6048/0220 INIT Page 0001 of 0001 Version 1.7 Commercial Building Permit May 15,2000 7.Water Supply(M.G.L. c. 40, § 54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public 19 Private ❑ I Zone: Outside Flood Zone A I Municipal On site disposal system ❑ 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size 1.`t' 0 6 0 0 6© C Frontage Setbacks Front O Side L: 0 R: 0 L: R: _ Rear Building Height Bldg. Square Footage ;O % Open Space Footage % (Lot area minus bldg&paved Q rJ parking) #of Parking Spaces ( 7 // Fill: volume&Location a rw_ A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW YES IF YES, date issued: d 00 IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES V IF YES: enter Book 6 °Yu Page 0.224 and/or Document # B. Does the site contain a brook, body of water or wetlands? N0� DON'T KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained Date Issued: C. Do any signs exist on the property? YES _ NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ?YES No IF YES, describe size, type and location:__ • Versionl.7 Commercial Building Permit May 15,2000 SECTION 4'-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations Existing Wall Signs Existing Ground Signs Additions ❑ Roofing ❑ ❑ ❑ Exterior Alterations Demolition❑ New Signs [ ] Change of Use [ ] Other [ ] ❑ Accessory Building[ ] Repairs [ ] k�. t 6 0 a Glpllat /Llr1LD7� tl tu.� SECTION 5 . USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly 10 A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business 2A ❑ E Educational ❑ 2B I ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR.CHANGE IN USE Existing Use Group: Q`s+..+5s Proposed Use Group: R stgS Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): 3 SECTION 6 BUILDING HEIGHT'AND AREA ti O E LXs BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION s, Floor Area per Floor(sf) 3� t5t l �Yb 2" S a60 4th 3rd b 1 I b� Srii a 4 t v � Total Area (sf) 3 y3 Total Proposed New Construction (sf) Total Height(ft) y2 Total Height ft .. .yam.---.-- Version 1.7 Commercial Building Permit May 15, 2000 wCity of Northampton � ... EG g Building Department 212 Main Street Sewer Se�tcity R Room 100 r�lllVell� !� fy Northampton, MA 01060 Two dts of Srct�lra' !'iat ' phone 413-587-1240 Fax 413-587-1272latlate 460'0 edi APPLICATION TO CONSTRUCT, REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -.SITE INFORMATION This section to be completed-by,office 1.1 Property Address: S, Map Lot ON Unit - Zone Overlay District Elm St. District CB District '? SECTION 2 PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Pri Current Mailing Address: Y/3- S'y7- 172 .6 Xgn,t Telephone 2.2 A horized Agent: - L 1���.. q. lifny�oA�ova , ►J 0-3 till Name(Print) r� Current Mailing Address: �— r—T i 4 (� CIO Signature Telephone SECTION 3'- ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars) to be Official Use Only completed by ermit applicant 1. Building (a) Building Permit Fee Soc� n� C) 2. Electrical (b) Estimated Total Cost of /SO 0 m CJ Construction from 6 3. Plumbing Building Permit Fee S' a 4. Mechanical (HVAC) ( SO�o d Q, 5. Fire Protection n o CA 6. Total = 0 + 2 + 3 + 4 + 5) /S` d b0 Check Number a This Section For Official Use Only Building Permit Number: d� `�� Date Issued:_ Signature: _ ---- Building Commissioner/Inspector of Buildings Date File#BP-2001-0584 APPLICANT/CONTACT PERSON ROYAL DESIGN BUILDERS INC ADDRESS/PHONE 82 TIDE MILL ROAD (603)926-45-e-� PROPERTY LOCATION 85 MAIN ST MAP 17C PARCEL 211 ZONE GB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: CONSTRUCT(2)STORY ADDITION&INTERIOR RENOVATIONS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 06033 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION: Approved as presented/based on information presented. Denied as presented: ✓ Special P it and/or Site Plan Required under: P NNING BOARD ZONING BOARD Received&Recorded at Registry of Deeds Proof Enclosed Finding Required under: § w/ZONING BOARD OF APPEALS Received&Recorded at Registry of Deeds Proof Enclosed Variance Required under: § w/ZONING BOARD OF APPEALS Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Co sion Permit from CB Architecture Co ittee Signature of Building O ' 1 Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. 85 MAIN ST BP-2001-0584 cis#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 17C-211 CITY OF NORTHAMPTON Lot:-001 Permit: Building Category:alteration-addition BUILDING PERMIT Permit# BP-2001-0584 Project# JS-2001-1050 Est.Cost:$1915000.00 Fee: $3681.60 PERMISSION IS HEREBY GRANTED TO Const.Class: Contractor., License: Use Group: ROYAL DESIGN BUILDERS INC 060333 Lot Size(sq.ft.): 25482.60 Owner. Florence Savings Bank zoniny,:GB Applicant. ROYAL DESIGN BUILDERS INC AT. 85 MAIN ST Applicant Address: Phone: Insurance: 82 TIDE MILL ROAD (603) 926-4533 Workers Compensation HAMPTONNHO3842 ISSUED ON:112 1010:00:00 TO PERFORM THE FOLLOWING WORK.*FOUNDATION ONLY - CONSTRUCT (2) STORY ADDITION & INTERIOR RENOVATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Inspector of Buildings Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Rough Frame: Gas Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy sisnature: Fee Tyne: Receipt No: Date Paid: Check No: Amount: Building 12/21/00 0:00:00 31590 $3681.60 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo moon 11 `85 MAIN ST BP-2001 -0584 GIs #: COMMONWEALTH OF MASSACHUSETTS 'Map:Block: 17C-211 CITY OF NORTHAMPTON Lot: -001 Permit: Building � Category: alteration-addition 1.J T IL-11-y"hIN P--ERMIT Permit 9 BP-2001-0584 Proiect# JS-2001-1050 Est. Cost: $1915000.00 Fee: $3681.60 PERMISS r ON IS HERE,BY GRANT,D TO: Const. Class: Contractol': License: Use Group: ROYAL DESi,�N BUILDERS INC 06. 0333 Lot Size sc. ft. : 25482.60 Owner: Florence Savings Bank L011 Lm"'-QB 7fICCIFII: _�'l�i��� n fir_^Ii iv �� I�� r -mac n��r i LS •'�. �v It v AT. 85 MAIN ST Applicant Address: Phone: Insurance: 82 TIDE MILL ROAD — — --, 603) 926-4533 -kcrs ('otllpensation HAMPTONNHO3842 ISSUIsI) 0A1:5/24,0J 0:00:00 TO PERFORM THE FOLLOffING TI'ORK:CONSTRUCT (2) STORY ADDITION & INTERIOR RENOVATIONS - SECTION 1 1 6 POST THIS CARD SO IT IS VISIBLE FROM TUE STREET Inspector of Plumbing Inspector of Wiring 1).1).W. Inspector of Buildings Underground: Service: )\leter: Footings: Rough:// "Y/,.f/cl>r2 Rough: Ilouse# Foundation: Final: Rough Frame: ANC Gas hire Deparhnent Fireplace/Chimney: �e wt f''✓vc�vt� Q k� L� Rough: Oil:Oil: Insulation: Final: Smoke: Final: °30 DAY TEMPORT OCCUPANCY — Lower Basement ONLY — Expires 4/4/02 THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLA ION OF ANY OF ITS RULES AND REGULATIONS. ` Certificate of Occupancy C i r Si Tnatur Fce Type: Receipt No: Date Paid: Check No: Ainount: Building 5/2-1;01 0.00:00 31590 $3681.60 212 Main Street, Phone (4 13) 537-1240, Fax: (413) 587-1272 Building Commissioner- Anthony I'atillo to [3i 1 ® i �- i 1 � - c, -nee c s%�,12 �, , Sr',OAQ �a ©� C-, �'�le�..� f�0�u,Cn oaw, Cam _ -t-. 3a Q� �r•�c-r Pays + Cr gp* 3/M/O 2, z 27 IA7 2. (4A� _ 1`' F-i NIsif u K.. o(c. To ►' -Cjvc j - to1£3 62 T2� i# 85 MAIN ST BP-2001-0584 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 17C-211 CITY OF NORTHAMPTON Lot: -001 Permit: Building Category: alteration-addition BUILDING PERMIT Permit# BP-2001-0584 Project# JS-2001-1050 Est.Cost: $1915000.00 Fee: $3681.60 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: ROYAL DESIGN BUILDERS INC 060333 Lot Size(sq.ft.): 25482.60 Owner: Florence Savings Bank r.�^4-. ni ni air r.r�C I�,Ir Zoning: GB Am icant: F'i0`,'" DESIGf . AT: 85 MAIN ST Applicant Address: Phone: Insurance: 82 TIDE MILL ROAD (603) 926-4533 Workers Compensation HAMPTONNHO3842 ISSUED ON:51241010:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT (2) STORY ADDITION & INTERIOR RENOVATIONS - SECTION 116 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Inspector of Buildings Underground: Service: Meter: Footings: 0 Rough:,/, Rough: House# Foundation: Q K 'S' Final:�� .� �,.� anal: 3.+.. �,s�t`lr{Jr% Z' e Rough iL F J rame: y_ X eZA Ck. -fa move Gas Fire Department Fireplace/Chimney: - e"'I ftV Vv G kj y Rough: Oil: 3bf(( Z Insulation: Final: / ��^�' Smoke: 0- Final: 0 k /P THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLA ION OF ANY OF ITS RULES AND REGULATIONS. '0 Certificate of Occupancy si nature: Fee Type: Receipt No: Date Paid: Check No: Amount: Building 5/24/010:00:00 31590 $3681.60 212 Main Street,Phone(413) 587 1 240,Fax: (413)587-1272 Building Commissioner-Anthony Pa.tillo