Loading...
30A-032 (19) City of Northampton Mail - Re: Building 8 Brewery https://mail.g000le.com/mail/u/0/?ui=2&ik=39211afc3d&view=pt&se... Sent from my iPhone On Oct 21, 2014, at 5:56 PM, Tristram Metcalfe <twm3 @metcalfe-architecture.com> wrote: Sorry chuck, Ive not heard from him recently so its gets pushed behind pressing squeaky wheels,,,. I'll call him tomorrow and Tris On Oct 21, 2014, at 1:34 PM, Charles Miller wrote: Hi, I'd like to get this off my desk. Is the ramp and stair being done? Plans? Also, 2nd exit changes? Plans Are the baths existing? no changes? No seating in the Company Store? Chuck Miller Assistant Building Commissioner City of Northampton Town of Williamsburg (City of Northampton E-mail is a public record except when it falls under one of the specific statutory exemptio 3 of 3 4/24/2015 3:39 PM �ity of Northampton MaiI - Re: Building 8 Brewery https://mail.google.com/mail/u/0/?ui=2&ik=39211 afc3d&view=pt&se... r 1-114 to 1-112" � 1-1l2" 6'-2„ Y �n rb° SXSFT LAN DING f HAND RAIL DETAIL ' 48" clear � Ps.... .___.__ tt 18" NEW ADA 0 RAMP 12:1 RAMP SECTION r, slope DETAIL NTS a �Fl. 48 t � set grade for 12:1 slope ACCESSIBLE ACCESS 00 FE EXISTING PS EXIT RAILINGS ELEVATION & PLAN 0 1 2 3 4 6 10 ft Begin forwarded message: Subject: Burner Flue & Steam Vent From: O'Brian Tomalin <obct9 @yahoo.com> Date: April 16, 2015 at 10:32:48 AM EDT To: Tristram Metcalfe <twm3 @metcalfe-architecture.com> Tristram- as far as our brew kettle is concerned we have to vent the burner with a 12" B-vent out the roof and wt something we may need a drawing for. Same goes for the steam vent, however we are waiting to hear back fror Thanks OB 2 of 4/24/2015 3:39 PM ;ity of Northampton Mail - Re: Building 8 Brewery https://mail.g000le.com/mail/u/0/?ui=2&ik=3921 lafc3d&view=pt&se... f © - d3 � Charles Miller<cmiller @northamptonma.gov> Re: Building 8 Brewery 1 message Tristram Metcalfe <twm3 @metcalfe-architecture.com> To: Louis Hasbrouck <cmiller @northamptonma.gov> Cc: O'Brian Tomalin <obct9 @yahoo.com> Hi Chuck, This project is progressing well now with need to install an insulated flue. Below I pasted O'Brian Tomalin's request which I'll answer to you since I have visited the site and resolved it with h We will be attempting to exit the two 12" B flues between existing truss purlin rafters staying min 2" form all wood r optimized for the 2 plumb insulated vents then we will cut out the 4x6 rafters at flues and head off using two sets of There is an old still remaining dead sprinkler pipe which may need cutting away but so far no operational sprinkler is removed in the reception area improves coverage back to its original design. Attached is the ramp railings design FYI. Sincerely Tris I of 3 4/24/2015 3:39 PM