Loading...
17A-184 (7) a > a i T i o i � v 3 c c > ., Z � � 5 � Z Z rn r; "'► 7C O Zoning Miscellaneous Additions,Repairs,Alterations,etc. Tel.No. Alterations NORTHAMPTON, MASS. 19 Additions APPLICa ATION FOR PERMIT TO ALTER Repair Garage 1. Location l S ✓n �/.!► r f Lot No. 2. Owner's name �^✓:� ,�'��ai C Address 3. Builder's name I>iS%'i-�'G?i✓�*' / u-�crF C��xXC's ^Address Z�� 41-4A Mass.Construction Supervisor's License No.��/i ` �D fr �(� Expiration Date �>� 4. Addition 5. Alteration 6. New Porch 7. Is existing building to be demolished? 8. Repair after the fire 9. Garage No.of cars Size 10. Method of heating 11. Distance to lot lines 12. Type of roof 13. Siding house 14. Estimated cost;u ,00- tt / The undersigned certifies that the above statements are true to the best of his. her �`04 knowledge and belief. Signature of responsible app,icant Remarks 25-7k'l - �'�' ..�` 5 —14e -"4 &��a - if,60.G'C�v ' �✓rd�' �f't�� Date Filed 3 File No. ZONING PERMIT APPLICATION (SIO. 2) 1 . Name of Applicant:1�/ i � , �•x-� -r- mss . Address : -*2e ri ti�G.-v ;'; rccr;`�. Telephone: 2 . owner of Property riT.'f C Address : ' mss._ : a _,T1_till-- Telephone: 3 . Status of Applicant: owner contract Purchaser Lessee other (explain: ) 4 . Parcel Identification: Zoning Map Sheet# 011 Parcel# Zoning District(s) (include overla ) W - street Address i �( > I t Required 5. Existincr Proposed by Zonin Use of Structure/Property (if project is only interior work, skip to #6) Building height %Bldg. Coverage (Footprint) Setbacks - front - side L: R: L: R: - rear Lot size Frontagre. Floor Area Ratio aOpen Space (Lot area minus building and parking) Parking Spaces Loading Signs Fill (volume & location) 6 . Narrative Description of Proposed Work/Project: (Use additional sheets if necessary) �T�� ��.z i,�s �f ?�,�' �� ,, /�'��zs Gva��,. S;l�/Z, 7. Attached Plans: Sketch Plan Site Plan 8 . Certification: I hereby certify that the information contained herei is true and accurate to the best of my knowledge." Date: Appl icant s S ignature: THIS SECTION FOR OFFICIAL USE ONLY: Approved as presented/based on information presented Denied as presented--Reason: Special' Permit and/or Site Plan Required: Re ed• variance Requ red• f' r gnatu e u ldin Ixetor to NOTE: issuance of a zoning porn$does not reliove an applicant's burden to comply with all zoning rdquird'ments and obtain all required permits from the Board of Health,conservation Commission,Dopattment of Public Works and other applicable permit granting authorities. Ic•9')_ PERMIT APPLICATION CHECK LIST P A G .. k � c YES NO DATE 1 . ZONING R �l. 2 .� M (r 3 . OWNER OCCUPANT STATEMENT 4 .LLQj IF NOT - 4 . 3 SETS OF PLANS OT PLAN 5 . NEW CONSTRUCTION 6 . CURB CUT 7 . WATER AVAILABILITY FORMS 8 . REMODELING INTERIOR 9 . ADDITIO 10 . ACCESSORY STRUCTURE 11 . SIGN / AWNI 12 . PERMI EE — ONLY — MONEY ORDER b 13 . SPECIAL PERMIT REQUIRED WITH DEED IF APPLICABLE 14 . UNDER SECTION 127 - CMR 780 15 . FORM A 16 . FILL COMMENTS : 1 rL `11—f City of Northampton REQUIRED INSPECTIONS 1. Footings and Walls BUILDING DEPARTMENT 2. Structural Components in Place* 3. Complete Building* No. 827 Office of the Building Inspector Zoning Form No. 003204 Date 8/24/94 Fee $20 Check# 2028 Page, 17A parcel 184 Zone URB Section 127 ❑ Yes ® No BUI]LDINGPERMIT * Plumbing and Electrical Inspections required THIS CERTIFIES THAT Distinctive House Coverings before Building Inspections has permission to strip & reshingle roof Inspection on Site—Foundations situated on 181 North Maple Street Inspection of Plumbing—Rough provided that the person accepting this pen-nit shall in every respect Inspection of Plumbing—Finish conform to the terms of the application on file in this office, and to the Gas Inspection provisions of the Statutes and the Ordinances relating to the Construction, Inspection of Wiring—Rough Maintenance and Inspection of Buildings in the City of Northampton. Any violation of any of the terms above noted is an immediate revocation Inspection of Wiring—Finish of this penTAL Expires six months from date of issuance,if not started. Building Inspection—Rough Note:A certificate of occupancy will be issued by this office upon return Insulation Inspection of this card signed by the Plumbing,Wiring and Building Inspectors. ** Install per Manufacturers information: windows, vinyl siding, Building Inspection—Finish roofs and woodstoves. Smoke Detectors(Fire Department) Other THIS CARD MUST BE DISPLAYED IN A CONSPICUOUS A O THE PREMISES Certificate of Occupancy 1` Building Ins «— �. l