Loading...
43-155 (3) .1 STORAGE SPACE /CLOSET Demolition: Remove the plywood boa covering the stairway, remove the door threshold. Framing: Frame new smaller weight bearing boat, to cover the stairway Pad up existing floor framing and sub floor to match adjacent bedroom floor. Frame knee walls one at each end of the closet. Replace collar ties with raised ceiling joist. Heating: Install Kompak baseboard heat to closet. Hot water heat loop to be piped off existing piping in adjacent bedroom. Electrical: Using the existing electrical we will install new lighting fixture. (Owner to supply decorative fixture) Insulation: We will install continuous proper vent to the rafter bays. Install r-30 kraft faced insulation to rafter bays and ceiling area. Install r-19 kraft faced insulation to exterior walls. Sheetrock: 1/2"gypsum board applied to walls and ceiling,fastened with 1"1/4 screws,taped, coated (3) applications, sanded to a paint ready surface. Interior Painting: Walls and ceiling to be painted with one coat primer and two coats finish. Base board, casing and door to be painted with two coats finish. Interior Finish: Base and case to be colonial style primed and fingered jointed pine. (To Match Existing) Build new insulated door and jamb to access Attic. Flooring: Install new carpet and pad to match adjacent bedroom. Closet shelves: Install new white wire shelving to the walk-in closet. Closet shelves to be figured out and installed after painting is complete. Miscellaneous: Install carpet and pad to second floor bedrooms, closets, hallway and stairs. Install (1) new 1 gallon per flush toilet to first floor'h bath. Install new rot iron hand rail to front steps. Interior Painting: Paint one wall and ceiling with one coat primer and two coats finish. Paint all trim,wood base,case and sills with one coat primer and two coats finish. Paint wood walls with 3 coats urethane. Interior trim: All trim, base, case and sills to match existing house interior trim. Underlavment• Install 5/8" ulc underlayment plywood to top of the porch sub floor. Flooring: Porch finish flooring to be 12"VCT square tiles gluded to the underlayment. EXISTING MASTER BEDROOM,BATHROOM& CLOSET Demolition• Remove the carpet from the second floor and stairway. Remove the 4' shower stall,partial wall finishes,framing,base and cabinetry from the bathroom. Remove wire shelving from the master bedroom closet to paint. (Wire shelving to be Re-installed) Framing: Frame new, 3'-2" shower valve wall for a new 5' shower stall. Plumbine• Install (1) new Aker#ACSH-3P-60 white acrylic 3- piece with right hand seat, (1) new shower valve. Owner to supply fixtures. She trot : 1/2 99gypsum board applied to partial bathroom walls and ceiling, fastened with 1"1/4 screws, taped, coated (3)applications,sanded to a paint ready surface. Interior Painting: (Master Bedroom,bathroom& closet) Prime new sheetrock with one coat of primer. Paint walls with two coats finish. Paint Ceilings with one coat flat white paint to match existing. Flooring: Master Bathroom area: Fasten a masonry wire over the existing vinyl flooring, add thin set, ceramic tile and grout. Add new marble threshold. Install new carpet and pad to replace existing. Finish Work: Re-install wire shelves to the walk-in closet. Finish off the right side of the existing vanity cabinet. Install new glass shower sliding doors. (Material by owner) Install new painted colonial base to the bathroom area. Install owner supplied towel bar to new shower wall. . Roofing: Shed roof only. We will install a 5"white drip edge around perimeter of roof. Apply one rows of ice and water barrier to eaves. Apply 151b felt over remaining roof surface. 25 year Architectural shingles applied over the entire roof surface. (Shingles to match the existing house roof) Gutters: We will install new heavy duty white seamless aluminum gutters and downspouts to the new roof area. There will be approximately 26' of gutter and 20' of downspout with (2) drops. Windows: (8) New Primelok2, sliding,vinyl windows with screens and low E glass will be inserted into the new framed window openings. (3) FS 308 Velux fixed skylights and fleshings installed to roof framed openings. Exterior Doors: We will supply and install. (2)Anderson 6068 atrium French swinging doors installed to new porch gable ends. (2) Larson 3068 full lite self storing storm doors installed to two front doors. Siding: We will install tyvek house wrap to new exterior walls. We will install new cedar shakes to side the new exterior walls. Exterior Trim: Soffit and facia will be covered with primed and fingered jointed pine material. Windows, doors and corners will be trimmed with primed and fingered jointed material. Exterior Stairs: One set of stairs will be built using pressure treated stringers and 5/4x6 PT treads. (Stairs do not include risers or railings.) PORCH INTERIOR Electrical: Using the existing 200 amp electrical service, we will install circuits, switches, plugs, fans and lighting as per code.We will wire for electric heat. (Owner to supply decorative fixtures) Insulation: Floor and ceiling area to have R-26 fiberglass insulation installed. All exterior walls on new addition will have 6" fiber glass insulation (R-19) installed with a poly vapor barrier. We will install fiber glass insulation around window and door units. Sheetrock: 1/2"gypsum board applied to house wall and ceiling, fastened with 1"1/4 screws, taped, coated (3)applications,sanded to a paint ready surface. Wood Wall Finishes: 1x6#wp-4, Tongue and groove,V groove, Pine applied to three new walls. PROPOSAL Harlow Builders 336 Coles Meadow Rd. Northampton ,Ma 01060 (413) 586-0465 Submitted to: 10/22/08 Ed and Pilar Gale 29 Hauthorn Terrace (413)458-3205 Northampton,Ma 01060 Page 1 of 5 The scope of this project is to replace 333 sq. ft. of existing deck with a new Screened-in porch. Located at the rear of the house. To renovate 1 existing bathroom and one existing storage space into a closet. We hereby submit specifications and estimates for the work to be performed. All materials and labor to complete.All permits obtained by Harlow Builders. All debris caused by construction removed by Harlow Builders. See attached drawings for details on framing and placement of fixtures. Drawing By: Scott Harlow Dated: 10/21/08 NEW PORCH AREA Demolition: Remove Partial existing Deck, railings and 8" Piers as needed to install new porch. Remove partial shake siding on the existing rear wall as needed to install porch. Excavation: Remove, (6) existing 8"concrete Piers. Dig for, (6) new 10" piers, 4' in the ground as per code. Grade dirt to pitch away from the house. Excess dirt to be spread on property. Concrete piers: We will pour(6) new 10"sonatubes and big foot footing,using 3,000 lb. psi mix. We will place a '/2"x 8"galvanized anchor bolt into concrete as an anchor. Framing: We will bolt 4x4 post anchors to the piers, install 4x4 pressure treated posts, (2) 2x10 used for beam, 2x10 floor joist 16" O.C. 1/2" cdx plywood will be fastened to the underside of the floor joist to protect the insulation.'/a" advantec panel, tongue and groove will be used as sub floor and be glued and fastened to the top side of the floor joist. 2x6 studs 16"O.C. used for exterior walls. Wall sheathing to be %z" cdx plywood. Roof rafters supporting sheetrock will consist of 2x10's, 16" O.C.. Roof sheathing to be%z" cdx plywood.We will double up framing around three skylights. All framing necessary as per drawings for a complete job. Decking: Existing deck and railings to remain. We will patch in decking and railing to the new porch Material to match the existing. z _ , t +» r fit.: LMLJ f g 3 Y 4 C�Y s �L 04 31�7 k_3cok RbiT _ �st 4 V,c ij X THIS PLAT IS COMPILED FROM DEEDS, PLANS AND OTHER SOURCES AND IS NOT TO BE CONSTRUED AS AN ACCURATE SURVEY AND IS NOT TO BE RECORDED. BUILDING LOCATION ACCURACY IS NOT GUARANTEED A PORTION OF THE PREMISES IS LOCATED WITHIN A 100 YEAR FLOOD ZONE (ZONE A), THE STRUCTURE IS NOT LOCATED WITHIN THIS FLOOD 70NF ' 7 LOT #34 fo OOK 8827, PAGE 230 9 LOT #33 10' WIDE UTILITY EASEMENT co HAWTHORNE LOT #32A LOT #32 TERRACE TO: FLORENCE SAVINGS BANK & CONNECTICUT ATTORNEYS TITLE INSURANCE COMPANY TO THE BEST OF MY INFORMATION, KNOWLEDGE AND BELIEF I HEREBY REPORT THAT I HAVE EXAMINED THE PREMISES AND BASED ON EXISTING MONUMENTATION ALL VISIBLE EASEMENTS, ENCROACHMENTS AND BUILDINGS ARE LOCATED ON THE GROUND AS SHOWN AND THAT THE BUILDINGS ARE ENTIRELY WITHIN THE LOT LINES, EXCEPT AS NOTED. I FURTHER REPORT THAT THE PROPERTY IS LOCATED WITHIN A FLOOD PRONE AREA AS SHOWN ON FEDERAL FLOOD INSURANCE MAPS FOR COMMUNITY #250167 THIS PLAT FOR MORTGAGE LOAN PURPOSES ONLY SURVEYOR-�4--O AND DOES NOT CONSTITUTE A PROPERTY SURVEY Of —M!QRTGAGE LOAN INSPECTION PLAT- RANDALL ' NORTHAMPTON, MASSACHUSETTS I E. PREPARED FOR IZER CHARLES M. & ELIZABETH, A. MAGUIRE #35032 SCALE: 1"=100' FEBRUARY 27, 2008 SUR HAROLD L. EATON AND ASSOCIATES, INC. REGISTERED PROFESSIONAL LAND SURVEYORS HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines"Homeowner" as, "Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a home owner." The building department for the City of Northampton wants person(s) who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour) a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing& gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections.Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts - =- Department of Industrial Accidents Office bf Investigations 71, 600 1d'ashington Street Boston, MA 02111 www.inass.trov/dia Workers' Compensation Insurance Affidavit: Builders/ContractorsTlectricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Indivi dual): Address: '3`3 ( �..: City/State/Zip: Phone #: J ©� Are you an employer?Check the appropriate boa: Type of project(required): L LI I am a employer with 1 4. I am a general contractor and I 6 21-New construction employees (full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. '['Remodeling ship and have no employees These sub-contractors have g. [7 Demolition working for me in any capacity. employees and have workers' 9. I Building addition [No workers' comp. insurance comp. insurance.t required.] 5. 7 We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.F71 Plumbing repairs or additions myself. [?v o workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] � c. 152, §i(4},and we have no employees. [No workers' 13.❑ Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. *Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. _ Insurance Company Name: i C Policy#or Self-ins.Lic. #:y,C�r_,: ��n� Expiration Date: Job Site Address: � 1Tc�� S� AA"NSR \V Al �r13NCity/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains 'nd Depalties o perju zat t e information provided above is trye and correct. Signature: - S Date: Phone#: &CM- 1 D,ficial use only. Do not write in this area,to be completed by city or town official Citv or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: J�r' License Number t��� C,,�1 �� \��°�.\r.:...•may ��" � ��° / � 1 `[ ��� c Address Expiration Date Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ i ,> Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application, Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ 11. -:Home';Owne&e�,i m ,ii' The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-vear period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition 2r Replacement Windows Alteration(s) FRI Roofing Or Doors Accessory Bldg. ❑ Demolition N� New Signs [0] Decks [M Siding[ ] Other[O] Brief Description of Proposed ` Work 4 k�'ct. :,3^^ 'ri ���� ri e�,. `'Z. S '� SLG�ntry , Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet Ga. If New house and or addition to existing housing, complete the following: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? N e d. Proposed Square footage of new construction. Dimensions (� x`�S-1 e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I / _ . as Owner of the subject property C hereby authorize / L v u �U'� to act on my half, in all matters lative o work authori ed b this building permit applicatio . �,-/a ' Signature of Owner Date I, S \' R"r\U'i-1 R `A"'r ��_'A )-4 S , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: L ..., .._.r R:, ,S 2�.. Rear Building Height ' Bldg. Square Footage o•.o % r Open Space Footage _.._ _. % (Lot area minus bldg&paved t'3 #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW 0 YES 0 IF YES, date issued:'; IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 Y IF YES: enter Book Page` and/or Document#! B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued:�. C. Do any signs exist on the property? YES NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES l NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. 'Department use on City of Northampton Status,of Permit: Building Department Curb.C6V.Dnve"y Permit 212 Main Street Sew4lSepticAvailabil#ty' h Room 100 Water%Well Availability Northampton, MA 01060 Two Sets:of,Structural Plans phone 413-587_-124£ Fax 413-587-1272 Plot(Site''Piaris. Outer Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map Lot Unit Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT ,t 2.1 Owner of Record: Q rl/ Name(Print) Current Mailing Address: Telephone Signature 7 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing (� '� S �D Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) '�C�,`A Check Number This Section For Official.Use Only Building ermit Number: Date g Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2009-0456 APPLICANT/CONTACT PERSON HARLOW BUILDERS ADDRESS/PHONE 336 COLES MEADOW RD NORTHAMPTON (413) 586-0465 PROPERTY LOCATION 29 HAWTHORNE TERR MAP 43 PARCEL 155 001 ZONE SR(100)//WP/WSP II THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildinp,Permit Filled out Fee Paid Tvpeof Construction•_DEMO PO TION OF DECK&CONSTRUCT 14 X 25 ENCLOSED PORCH,RENO BATH&FINISH STORAGE SPACE New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 052460 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON ,PRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay � � �0 3v Ors Signature of Building Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. ��a j ad BP-2009-0456 GIs#: COMMONWEALTH OF MASSACHUSETTS ON Moto*W CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PERMIT Permit# BP-2009-0456 Project# JS-2009-000615 Est. Cost: $30000.00 Fee: $180.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: HARLOW BUILDERS 052460 Lot Size(sq.ft.): 91911.60 Owner: MAGUIRE CHARLES M&ELIZABETH A C/O EDWARD R GALE Zoning: SR(100)//WPAVSP II Applicant: HARLOW BUILDERS AT. 29 HAWTHORNE TERR Applicant Address: Phone: Insurance: 336 COLES MEADOW RD (413) 586-0465 Workers Compensation NORTHAMPTONMA01060 ISSUED ON:1013112008 0:00:00 TO PERFORM THE FOLLOWING WORK.-DEMO PORTION OF DECK & CONSTRUCT 14 X 25 ENCLOSED PORCKRENO BATH & FINISH STORAGE SPACE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 10/31/2008 0:00:00 $180.009311 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo