30A-037 City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111, S 150A.
Address of the work:
The debris will be transported by: r
el
The debris will be received by:
Building permit number:
Name of Permit Applicant �"� r l
r �
Date Signature of Permit Applicant
City of Northampton
Massachusetts ti ct 4
i (
DEPARTMENT OF BUILDING INSPECTIONS xi
212 Main Street • Municipal Building
�y y Northampton, MA 01060
INSPECTOR
Louis Hasbrouck Chuck Miller
Building Commissioner Assistant Commissioner
HOME OWNER EXEMPTION ACKNOWLEDGEMENT
The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her
construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which
he/she resides or intends to be, a one or two family dwelling, attached or detached structures
accessory to such use and/or farm structures. A person who constructs more than one home in a two-
year period shall not be considered a home owner."
The building department for the City of Northampton wants any person(s)who seek to use the home
owner exemption, to act as their own construction supervisor, to be aware that by doing so you
become responsible for compliance with state building codes and regulations. The inspection
process requires that the building department be called to inspect work at various stages, which include
foundation/footings (before backfill), sonotube holes (before pour) a rough building inspection
(before work is concealed), insulation inspection (if required) and a final building inspection
The building department requires these inspections before the work is concealed, failure to secure
these inspections can result in failure to obtain a certificate of occupancy until the work can be
inspected.
If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be
responsible to make sure that the trades hired secure their proper permits in conjunction to the building
permit issued, and that they get their required inspections. Failure of the individual trades to secure
the permits and inspections as required can DELAY the project until such time as the proper permits
and inspections are made
1, understand the above.
(Home owner/resident's signature requesting exemption)
I will call to schedule all required building inspections necessary for the building permit issued to me.
Date
Address of work location
The Commonwealth of Massachusetts
Department of Industrial Accidents
! . Office of Investigations
600 Washington Street
Boston, MA 02111
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual): �`1TL=-�� �
Address:
City/State/Zip:F/0/°, r lr�- Phone #: l `'
Are you an employer? Chec the appropriate box: Type of project (required):
1.❑ I am a employer with 4. ❑ I am a general contractor and 1 6. ❑ New construction
employees (full and/or part-time).* have hired the sub-contractors
2. I am a sole proprietor or partner- listed on the attached sheet. 7. Remodeling
ship and have no employees These sub-contractors have 8. ❑ Demolition
working for me in any capacity. employees and have workers' 9 ❑ Building addition
[No workers' comp. insurance comp. msurance.T
required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs
insurance required.] t c. 152, §1(4), and we have no
employees. [No workers' 13.❑ Other
comp. insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: --
Policy#or Self-ins. Lie. #: Expiration Date:
Job Site Address: City/State/Zip:
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
Signature: Date: f// 4f
Phone# �
Official use only. Do not write in this area, to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone#:
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable £
Name of License Holder:
/�' License Number
JLl!✓.
Addr —% �— � ' / Expirati Date
Sig�n=re Te ephone
9.Registered Home Improvement Contractor:' , Not Applicable £
7r` 617n l6/ Z6
Comp v Namd Registration Number
Address //�// Expir ion to
Te pho e)
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes.t,,�. £ No...... £
11: Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature.
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House ❑ Addition ❑ Replacement Wipdows Alteration(s) ❑ Roofing ❑
Or Doors V
Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [C] Siding[O] Other[I]]
Brief Des - do f oposed
/ � l i �� u�c yS Work: �o� Z— laul r e e �
Alteration of existing bedroom Yes JZ No Adding new bedroom Yes �--No
Attached Narrative Renovating unfinished basement Yes 2-1 No
Plans Attached Roll -Sheet
sa. if-New house and olr addition to existing..housing, complefe the followinC
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No .
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
, as Owner of the subject
property
here y authorize
to ct on my al i all ters relati rk autfiafized by this building permit application
Signature of Own r Date
as Owner/Authorized
Agent declare that the statements a6d' formation on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of erjury.
X S �'
Print Nam
Signatu of Agent Dat
_
Section 4. ZONING AR Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This coluinn to be filled in by
Building Department
Lot Size
Setbacks Front
Rear
Building Height
Bldg.Square Footage
Open Space Footage %
(Lot area minus bldg&paved F-7 7 1
#of Parking Spaces
(volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
x�� �~�
NO �m� DON7KNOYY �~� YES �~�
|F YES, date ioued: �
IF YES: Was the permit recorded at the Registry nfDeeds?
NO �� DUNlKNOW YES
�_/
IF YES: enter Book Page and/or Dncument#
�� ��
��
B. Does the site contain abrook, body of water orwetlands? NO ��' DONTKNOVY �~� YES �_�
IF YES, has permit been or need to be obtained from the Conservation Commission?
Needs to be obtained �=� Obtained «-� Date Issued:
��' �~� ' �
C. Do any signs exist on the property? YES 0 NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? Y[3 0 NO xT��
IF YES, describe type
' ' { ............._---_-_-____ ...._____--J
E. Will the construction activity disturb(clearing, grading on.or filling)over 1 acre oriod part ofa common plan
that acne? YES K ) NO Q�>
' `�/ ~cx
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
�.- � x;__ � Department use only
of Northampton Staus,ofPermrt
(
By Iding Department curt,Cut/Driue�vayPermlf
I ;
Z�I� 12 Main Street Sewer/Septic�kvaifa6il�ty
U
Room 100 WaterlWeliAvaila5111ty
fort ampton, MA 01060 Twa sets of 5tructurai Plans
F .r i nc
0805 7-1240 Fax 413-587-1272 Plof/Slte
,
Other 5,pecify
z .
APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE.INFORMATION
1.1 Property Address: Thls section to be completed by office
Map Lot Unit
, Z /
:Zone ': Overlay D►sYrrct
Elm St District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
i
1ee->1
Na e(Pri / Current Mailing Address:
Telephone
[ I �JL
vX
Signature
2.2 Authorized Agent:
ri Current Mailing Address:
at re Telephone T
SECTION 3 -ESTIMATED CONSTRUCTION COSTS.
Item Estimated Cost(Dollars)to be Official Use Only
completed by ermit applicant
1. Building ,$� ® (a)Building Permit Fee
r
2. Electrical (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection
6. Total=(1 +2+3+4+5) Check Number
This Section For Official'Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner/Inspector'of Buildings Date
323 RIVERSIDE DR BP-2015-0293
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 30A-037 CITY OF NORTHAMPTON
Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: windows replaced BUILDING PERMIT
Permit# BP-2015-0293
Project# JS-2015-000561
Est.Cost: $5000.00
Fee: $35.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: C & T CONSTRUCTION 062884
Lot Size(sq. ft.): 3179.88 Owner: SHEA PATRICIA O
Zoning: URB(100)/ Applicant. C & T CONSTRUCTION
AT. 323 RIVERSIDE DR
Applicant Address: Phone: Insurance:
15 Fairway Drive (413) 586-4965
FLORENCEMA01062 ISSUED ON.911612014 0:00:00
TO PERFORM THE FOLLOWING WORK.INSTALL REPLACEMENT WINDOWS & 2 ENTRY
DOORS
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 9/16/2014 0:00:00 $35.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner