30A-085 FOR CONSTRUCTION --
n
Ground WEEB&
Module Clamp
.G,.r
Unirac Solarmount
Sop Rail w/L-foot
GS6p 2 Green Fasten Flashing: 32 Taugwonk spur,Al2
Stonginton,CT 06378
ECO-GF1-BLK-812 With
Sh�rO�e Phone(860)535-3370
/pspra��Go�p rk" OG Rooftop
— ECO-CP-SQ Compression Bracket Fax(413)683-2225
bets @2 - 5/16"x 3.5 S.S. Lag Bolt GRID-TIED
a w/2.5" Minimum Penetration PHOTOVOLTAIC SYSTEM
2"X 10 2Q Sealed w/Approved Sealant
10 Raets @ 6.00kW DC @ STC
Z"X O G• VESEL, PAUL
3 HIGH MEADOW ROAD
FLORENCE, MA 01062
Project# 10104883
1 Attachment Profile Attachment Detail DESIGNER MJR
REVIEWER: CR
VERSION DATE. 2014-05-28
20"Max 20" Max REVISIONS
Roof Framing PV Module Rail Overhang
Rail Splice Rail Overhang # By Date Notes
x
Roof 2
Attachment „ s
4
Anchors located
I
aon alternate roof
framing members Installer Signature
I ; Sign each page and send to RGS
Stagger splice locations Min of 2 supports Energy after you have verified that the
within the each row of modules on either side of splice
�� system will fit as proposed. If changes
Anchor Max SolarMount Rail with a max spacing of 60" are needed, draw what will work on
page and return.
3
Staggered Attachment Detail T 4 Rail S lice Detail I have verified that the design
8 NTS NTS proposed by RGS Energy for this
project will fit as drawn with no
changes that will affect price,or
energy production from changing a
m panels tilt or orientation.
d
m SolarMount Rail PV Module
LL WEEBLug SS Washer
CREW LEAD
Q Module Frame Ground Wire &Nut _ ___ 7"7
Rapid Shutdown DATE
SS Bolt V_JJ Unirac Rail Roof �;,
DC Disconnect
SS Bolt Framing NEMA 4 Rated
Nib
OJ I r
Unirac I ;
Q
0
UGC-1
„ I
II I ,
SS Flat SS Bolt
Washer ; ; ^'� VARIES
Roof
Unirac Rail Attachments DETAILS
5 Grounding Clip & Module G Groundin Lu & Rail � Ra id Shutdown Detail
PV-A03
Scale: N.T.S. V Scale: N.T.S. NTS
FOR CONSTRUCTION
PV ARRAY 1 -MECHANICAL LOADS
Array Area: 426.2 ft- Total Photovoltaic Dead Load: 2.92 psf
Array Weight: 1242.7 Ibs Avg. Dead Load per Anchor: 22,2 Ibs
Anchor Qty.: 56
32 Taugwonk Spur,Al2
Design Values by Roof Zone: Corner Egde Interior Stonginton,CT 06378
Phone(860)535-3370
Max. UniRac Rail Span: 60 in. O.C. 60 in. O.C. 60 in. O.C: Fax(413)683-2225
Max. UniRac Rail Cantilever: 20 in. O.C. 20 in. O.C. 20 in. O.C.
........................... ............................................... . .
Adjusted Anchor Span: 48 in. O.C. 48 in. O.C. . 48 in. O.C. GRID-TIED
........................... .. PHOTOVOLTAIC SYSTEM
Downforce Point Load: 340.5 Ibs 340.5 Ibs 340.5 Ibs
........................... ........................... ...........................
Uplift Point Load: -148.8 Ibs -148.8 Ibs -121.9 Ibs 33' 6.00kW DC @ STC
Minimum Anchor Strength: 707 Ibs VESEL, PAUL
Average Safety Factor: 5.37 16'-3" 2'-7" 3 HIGH MEADOW ROAD
FLORENCE, MA 01062
Project# 10104883
8
DESIGNER: MJR
�- REVIEWER: CR o
- VERSION DATE. 2014-05-28
REVISIONS
I i
# By Date Notes
14-2,. z
I
3
21'-9" s
4
o Installer Signature
Sign each page and send to RGS
Energy after you have verified that the
10'-10° system will fit as proposed. If changes
_— -
FOR CONSTRUCTION
4
32 Tau wonk Spur,Al2
g P
v Stonginton,CT 06378
Phone(860)535-3370
1 Site Plan S stem La out Fax(413)683-2225
Scale: 1" = 75' Scale: 1" = 15' GRID-TIED
PHOTOVOLTAIC SYSTEM
6.00kW DC @ STC
VESEL, PAUL
(E) Property Line 3 HIGH MEADOW ROAD
FLORENCE, MA 01062
Project# 10104883
DESIGNER. MJR
Equipment Located on Exterior Wall: REVIEWER: CR
(E) Utilty Meter
Equipment Located in Basement: VERSI°"°ATE 2014-05-28
(E) Main Service Panel REVISIONS
(E) Subpanel- POI
(N) PV Production Meter # By Date Notes
(N) Fronius IG Plus A 6.0-1 UNI Inverter 1
2
a 3
3 4
Lo
a°
b � Installer Signature
Z
(N)EMT Conduit-On Roof&Under Eaves Sign each page and send to RGS
Energy after you have verified that the
system will fit as proposed. If changes
are needed, draw what will work on
page and return.
N
I have verified that the design
g proposed by RGS Energy for this
--- Equipment Located on Roof:
X — – (N) Rapid Shutdown DC Disconnect Project will fit as drawn with no
o changes that will affect price,or
energy production from changing a
m
panels tilt or orientation.
! (N) PV Array:
co
24 Canadian Solar CS6P-250P CREW LEAD
D, Asphalt/Comp.Shingle Roof
Q (E) Driveway 2"X 10"Rafters @ 24"0.C. DATE J
zAzimuth:zimth:178°
e
0
0
(E) Single Family Dwelling
(E) Pool
s �E Varies
N SITE PLAN
W E
PV-A01
S
FOR CONSTRUCTION
s
Grid-Tied Photovoltaic System �� �
DC Rating: 6.00 kW
Vesel, Paul
3 High Meadow Road 3Stongnton,kCT063782
Florence, MA 01062 Sheet List Phone(860)535-3370
Fax(413)683-2225
Sheet No. Sheet Title
Jurisdiction: City of Northampton PV-000 COVER GRID-TIED
PHOTOVOLTAIC SYSTEM
PV-A01 SITE PLAN 6.001kW DC @ STC
Scope of Work: General Notes: PV-A02 MODULE LAYOUT VESEL, PAUL
RGS Energy shall install a 6.00 kW Grid-tied Photovoltaic("PV") System 1. System follows any/all Fire Code Setbacks per Ordinances of the City PV-A03 DETAILS 3 HIGH MEADOW ROAD
totaling(24) Canadian Solar CS6P-250P Modules with(1) Fronius IG Plus A Of Northampton. FLORENCE, MA 01062
6.0-1 UNI String Inverter(s). The Modules shall be flush mounted on the 2. All projects will comply with the Ordinances of the City of PV-A04 MATERIALS Project# 10104883
asphalt/comp. shingle roof and interconnected via load side breaker Northampton. PV-E01 ELECTRICAL DIAGRAM DESIGNER MJR
connection. 3. Construction Hours: 7am-8pm Monday-Friday, 9am-8pm Saturday,
No time on Sunday or legal Holidays. PV-E02 SYSTEM CALCS REVIEWER: CR
Equipment Specifications: 4. Product Data Sheets shall be included. PV-G01 SIGNAGE VERSIONDATE 2014-05-28
5. Rooftop penetrations shall be completed and sealed per code by a
Module: (24)Canadian Solar CS6P-250P licensed contractor. REVISIONS
Inverter 1: (1) ols IG Plus A 6.0-1 UNI 6. All Photovoltaic modules shall be tested and listed by a recognized
Racking: UniRac ac SolarMount # By Date Notes
laboratory.
Attachment Flashing: Eco-Fasten Green-Fasten with 7. Certifications shall include UL1703, IEC61646, IEC61730. '
CP-SQ-Slotted Bracket and Aluminum Flashing 8. A continuous ground shall be provided for the Array and for all z
Photovoltaic Equipment. `
9. DC Wiring shall be run in metal conduit or raceways within enclosed a
Roof Specifications: spaces in a building.
Roof 1: 10. Conduit,Wire systems and Raceways shall be located as close as 5
Asphalt/Comp. Shingle possible to ridges, hips, and outside walls.
o
(Single Layer) 11. Conduit between Sub Arrays and to DC Combiners/Disconnects shall _ Installer Signature
sign each page and send to RGS
2"x 10" Rafters @ use guidelines that minimize the total amount of conduit by taking the Energy after you have verified that the
24"O.C. shortest path. system will fit as proposed. If changes
Pitch: 45° I Azimuth: 178° 12. Space Requirements for electrical equipment shall comply with NEC are needed,draw what will work on
Array Size: 24 Modules Article 110. Y.:a page and return.
13. Equipment grounding shall be sized in accordance with Table
250.122. ' 1 have verified that the design
o Site Specifications: = proposed by RGS Energy for this
Occupancy: II 14. Connectors that are not readily accessible and that are used in the project will fit as drawn with no
" Design Wind Speed: 90 MPH circuits operating at or over 30V AC or DC shall require a tool for = changes that will affect price,or
opening and are required to be marked"Do not disconnect under „F energy Exposure Category: B p g q rv' production from changing a
Mean Roof Height: 20 ft load"or"Not for current interrupting", per 690.33(c)&(e), panels tilt or orientation.
Ground Snow Load: 40 PSF(Reducible) 15. All signage to be placed in accordance with local building code. y
m Adj. Roof Snow Load: 23.7 PSF 16. Signs or Directories shall be attached to the electrical equipment or CREW LEAD
located adjacent to the identified equipment.
a All Work to be in Compliance with: 17. Signs should be of sufficient durability to withstand the environment. DATE
2014 National Electrical Code(NEC) 18. Any plaques shall be metal or plastic with engraved or machine
2009 International Residential Code(IRC) printed letters, or electro-plating, in a red background with white
2009 International Building Code(IBC) lettering, a minimum of 3/8"height and all capital letters.
2012 International Fire Code(IFC)
2012 Uniform Mechanical Code(UMC)
° 2012 Uniform Plumbing Code(UPC)
MA 780 CMR, 8th Edition
-including 2/4/11 revisions to Tables R301.2(4)&R301.2(5) F N/A
ASCE/ANSI 7-05 Minimum Design Loads for Buildings and Other
Structures
COVER
As amended and adopted by City of Northampton
PV-000
t
:"UNIRAC
. - D. . - -
SolarMount Beams
Part No. 310132C, 310132C-B, 310168C, 310168C-B, 310168D
-310208C, 310208C-B, 310240C, 310240C-B, 310240D,
410144M,410168M, 410204M,410240M
Properties Units SolarMount SolarMount HD
Beam Height in 2.5 3.0
Approximate Weight(per linear ft) plf 0.811 1.271
Total Cross Sectional Area in' 0.676 1.059
Section Modulus(X-Axis) in 0.353 0.898
Section Modulus(Y-Axis) in 0.113 0.221
Moment of Inertia(X-Axis) in 0.464 1.450
Moment of Inertia(Y-Axis) in 0.044 0.267
Radius of Gyration(X-Axis) in 0.289 1.170
Radius of Gyration(Y-Axis) in 0.254 0.502
SLOT FOR T-BOLT OR 1.728
SLOT FOR T-BOLT OR
14"HEX HEAD SCREW 1�"HEX HEAD SCREW
2X SLOT FOR SLOT FOR
BOTTOM CLIP 2.500 BOTTOM CLIP
T3.000
-TSLOT FOR
38"HEX BOLT SLOT FOR 1.385
3 " HEX BOLT
.387
.750
1.207
y Y 1.875
A A
►X ►X
SolarMount Beam SolarMount HD Beam
Dimensions specified in inches unless noted
a
amUNIRA
. - D. . - - :
SolarMount Beam Connection Hardware
SolarMount L-Foot
Part No. 304000C, 304000D
Y 0 L-Foot material: One of the following extruded aluminum alloys:6005-
T5,6105-T5,6061-T6
0 Ultimate tensile:38ksi,Yield: 35 ksi
f� Finish:Clear or Dark Anodized
L-Foot weight:varies based on height: -0.215 Ibs(98g)
• Allowable and design loads are valid when components are
Bea assembled with SolarMount series beams according to authorized
Bolt UNIRAC documents
L-Foot For the beam to L-Foot connection:
•Assemble with one ASTM F593 W-16 hex head screw and one
errated ASTM F594 Wserrated flange nut
Flange Nu • Use anti-seize and tighten to 30 ft-Ibs of torque
• Resistance factors and safety factors are determined according to part
1 section 9 of the 2005 Aluminum Design Manual and third-party test
Y results from an IAS accredited laboratory
NOTE: Loads are given for the L-Foot to beam connection only; be
X sure to check load limits for standoff,lag screw,or other
attachment method
Applied Load Average Safety Design Resistance
sx mar rtra Direction Ultimate Allowable Load Factor, Load Factor,
•"�""" Ibs(N) Ibs(N) FS Ibs(N) m
4
a¢� ' Sliding,Z± 1766(7856) 755(3356) 2.34 1141 (5077) 0.646
Tension,Y+ 1859(8269) 707(3144) 2.63 1069(4755) 0.575
Dimensions specified in inches unless noted Compression,Y- 3258(14492) 1325(5893) 1 2.461 2004(8913) 1 0.615
Traverse,X± 1 486(2162) 213(949) 1 2.28 323(1436) 0.664
OnUNIRAC
SolarMount Mid Clamp
Part No.302101 C,302101 D,302103C,3021041),
302105D,302106D
Mid clamp material: One of the following extruded aluminum
rra Bolt alloys: 6005-T5, 6105-T5,6061-T6
Mid + la a N
Clamp '�.. Ultimate tensile: 38ksi,Yield: 35 ksi
Finish: Clear or Dark Anodized
• Mid clamp weight:0.050 Ibs(23g)
• Allowable and design loads are valid when components are
assembled according to authorized UNIRAC documents
Values represent the allowable and design load capacity of a single
mid clamp assembly when used with a SolarMount series beam to
retain a module in the direction indicated
• Assemble mid clamp with one Unirac Y4"-20 T-bolt and one W-20
ASTM F594 serrated flange nut
• Use anti-seize and tighten to 10 ft-Ibs of torque
Seam Resistance factors and safety factors are determined according to
part 1 section 9 of the 2005 Aluminum Design Manual and third-
party test results from an IAS accredited laboratory
Applied Load Average Allowable Safety Design Resistance
�.00atsT,ant� - - Direction Ultimate Load Factor, Load Factor,
eemEennaoues Ibs(N) Ibs(N) FS Ibs(N) m
Tension,Y+ 2020(8987) 891 (3963) 2.27 1348(5994) 0.667
Transverse,Z± 520(2313) 229(1017) 2.27 346(1539) , 0.665
Y Sliding,X± 1194(5312) 1 490(2179) 1 2.44 741 (3295) 1 0.620
rx
Dimensions specified in inches unless noted
SolarMount End Clamp
Part No.302001C,302002C,3020021),302003C,
302003D,302004C,302004D,302005C,302005D,
302006C,302006D,302007D,302008C,302008D,
302009C,302009D,302010C,302011C,302012C End clamp material: One of the following extruded aluminum
alloys:6005-T5,6105-T5, 6061-T6
Olt Ultimate tensile:38ksi,Yield:35 ksi
• Finish: Clear or Dark Anodized
0 End clamp weight:varies based on height: -0.058 Ibs(26g)
dl
lamp Allowable and design loads are valid when components are
Serrated assembled according to authorized UNIRAC documents
Flange Nut Values represent the allowable and design load capacity of a single
end clamp assembly when used with a SolarMount series beam to
retain a module in the direction indicated
• Assemble with one Unirac'/4"-20 T-bolt and one'/4"-20 ASTM F594
Bea serrated flange nut
• Use anti-seize and tighten to 10 ft-Ibs of torque
• Resistance factors and safety factors are determined according to
part 1 section 9 of the 2005 Aluminum Design Manual and third-
Y party test results from an IAS accredited laboratory
A Modules must be installed at least 1.5 in from either end of a beam
►X
i.z Applied Load Average Allowable Safety Design Resistance
W""'" Direction Ultimate Load Factor, Loads Factor,
' Ibs(N) Ibs(N) FS lbs(N)
WITH Tension,Y+ 1321 (5876) 529(2352) 2.50 800(3557) 0.605
*+rx.«e f
Transverse,Zt 63(279) 1 14(61) 4.58 21 (92) 0.330
Sliding,Xt 142(630) 52(231) 2.72 79(349) 0.555
Dimensions specified In Inches unless noted
�
�
�` UNN~� ��
���8 0U�� � N����0
�� �~ " � nm �� ���
SoUarMount Technical Datasheet
Pub 11umm-luuv1.o August 2011
SoUarMoumtModuUe Connection Hardware.................................................................. 1
BoftonnUp Module Clip.................................................................................................1
MidClamp ....................................................................................................................2
EndClamp....................................................................................................................2
SolarMouNt Beam Connection Hardware......................................................................3
L-FoOt...........................................................................................................................3
SolarMoumtBeams..........................................................................................................4
SoUarMoKUnt Module Connection Hardware
SoUarMou0t Bottom Up Module Clip
Part No. 3O2000C
X Washer ° Bottom Up Clip material: One uf the following extruded aluminum
8oftxn alloys:8OO5-T5.01O5'T5.6O61'T8
UP Clip ~ Ultimate tensile:38kni.\io|d: 35 kai
" Finish:Clear Anodized
^
Bottom Up Clip weight;-0.031 |bo(14g)
^ AUowab|eand design loads are valid vvhencomponents am
B ��� assembled with So|ndNountooheo beams according to authorized
UN|RACdocumento
^ Assemble with one%'''2OASTyNF5A3 bolt,one%'''2OASTN1F504
serrated flange nut,and one k"flat washer
^
Use anti-seize and tighten 0m10ft-|bocftorque
^
Resistance factors and safety factors are determined according to
part 1 section Qnf the 2OO5 Aluminum Design Manual and third-
party testneouUofrom on |AS aouvuddmd laboratory
Module edge must be fully supported by the beam
�
NOTE ON WASHER: Install washer on bolt head side ofassembly.
DO NOT install washer under serrated flange nut
Applied Load Average Allowable Safety Design Resistance
Direction Ultimate Load Factor, Load Factor,
`24
Tension,Y+ 1566(6967) 686(3052) 2.28 1038(4615) 0.662
Y Transverse,X± 1128(5019) 329(1463) 3.43 497(2213) 0.441
A - ~ ,p
0.% . ^
Dimensions specified In Inches unless noted
�N�|
GREENFASTEN`M PRODUCT GUIDE - GF-I
American Wood Council Lag Bolt Pull-Out Values
� E
.Y
rq
Lag pull-out (withdrawal) capacities (lbs) in typical roof lumber (ASD)
Lag screw specifications
'i Specific
5116"shaft*
Gravity
� w � a
per inch thread depth
: n',
Qe
LU
Douglas Fir,Larch .50 266
Douglas Fir,South 46 235
3
Engelmann Spruce,lodgepole Pine .46
235
(MSR 1650 f&higher)
Hem,Fir,Redwod (close grain) .43 212
Hem,Fir(North) .46 235
t
Southern Pine .55 307 Thread
u Depth
" o Spruce,Pine,Fir .42 205
v Spruce,Pine,Fir .50 266
'A (E of 2 million PSI and higher
wA � o grades of MSR and MEL)
} y �
co
t7
N
t_
3s O0
- W
_-. ... ,_r•, .n !il ., r,neat al �2 o:
GREENFASTEN"' PRODUCT GUIDE - GF-I
Specifications
PART I — GENERAL 1.3 SUBMITTAL B. Fasteners (may be supplied by others)to be
A. Submit manufacturer's written specifications. compatible with chosen roof application and
1.1 SUMMARY B. Submit standard product cut sheets. meet specified pull out values as shown in load
A. WORK INCLUDES C. Submit installation instructions. test data.
. GreenFasten solar attachment bracket that D, Submit product specific load test data,showing C. Base flashing is.032 gauge aluminum embossed
attaches directly to the roof deck. ultimate and allowable load values. to accept EPDM bushing.
2. Provide appropriate bracket and fasteners
for the roof system. 1.4 QUALITYASSURANCE D. Bushing is EPDM.
B. RELATED SECTIONS Installer to be experienced in the installation of E. Stainless steel bonded washer is 302 stainless
r " 1.Section 07600:Flashing and Sheet Metal specified roofing material and snowguards for no less and EPDM.
2.Section 07500:Roofing than 5 years in the area of the project.
� 3.Division I:Administrative and procedural 2.3 FINISH—Mill Finish
requirements 1.5 DELIVERY/STORAGE/HANDLING A. Bracket is mill finish aluminum
4.Division TThermal and Moisture Protection Inspect material upon delivery Notify manufacturer
within 24 hours of any missing or defective items.Keep B. Base flashing(choose one)
1.2 SYSTEM DESCRIPTION
material dry,covered,and off the ground until installed. I.Mill Finish
A. COMPONENTS:
1. GreenFasten system consists of aluminum 2.Black-kynar painted
x, PART 2 - PRODUCTS
flashing with integral EPDM bushing and one 3.Dark Bronze kynar painted
t 3 bonded stainless steel and EPDM washer.
2.1 MANUFACTURER
2. Fasteners PART 3 - EXECUTION
t " EcoFasten Solar°
A.To be of metal compatible with aluminum
a 289 Harrel St.Morrisville,VT.05661
GreenFasten components.
o (877) 859-3947 3.1 EXAMINATION
B.Fasteners should be selected for www.ecofastensolar.com. A. Substrate:Inspect structure on which brackets
compatibility with p y the roof deck. are to be installed and verify that it will withstand
C.Fastener strength should exceed or be equal 2.2- MATERIALS any additional loading that it may incurred.Notify
g to that of the allowable load of the system.
A. Attachment Bracket General Contractor of any deficiencies before
i J x See test data at www.ecofastensolar.com
6000 Series Aluminum (choose one) installing EcoFasten Solar brackets.
t r = 3. Sealant(if required by roof manufacturer):
€° E B. Verify that roofing material has been installed
far fi- o to be roof manufacturer approved. F-I I I correctly prior to installing solar attachment brackets.
4. Aluminum attachment bracket 2. L- 01-3"
3. L-102-3„
" 3.2 INSTALLATION
r B. DESIGN REQUIREMENTS: 4. CP-R A. Comply ith architectural drawings and
1. Bracket spacing to be recommended by 5. CP-SQ p y g
00 project engineer's recommendations for location
project engineer. 6. SL 02 6" of system.Comply with Manufacturer's written
co 2. Install a minimum of one fastener assembly. 7. Z-101 installation instructions for installation and layout.
1 It is important to design new structures or 8. Custom
o assess existing structures to make sure that
they can withstand retained loads,
i
O
w
_ Sec.S-I
GREENFASTEN" PRODUCT GUIDE - GF-I
Bracket Options - CP-SQ
� r
.375 -.008
4-- ---
N
a l .� — —
2.000=.025 —
� F
4
elf
L p
�*i 14 � _r
v
, 2.000 -,025
0
1 ,R 4
E
g. -
;'' o .377 .010 TN4U
g Ul .875 .010 k 82 NEARSIDE
_ v
o
` w
,= Compression Plate 2" X 2" Mill Aluminum
Sec.4-4
GREENFASTEN PRODUCT GUIDE - GF-
GF I- L 812
..r
rE N
,
8.000 - .005
i- R38 082
�K
$� 3
',
---
12.00:; .125 v_.
— --
3.00- .125
§ cu
► - 1
i s ,
V
4.00 + .125 ——* -- ►- 26 .01 ►
-s- -
t r,
s
co
oo
0
v,
Finish Options
BLK= Matte Black
BRZ = Medium Bronze
Lij
MLL= Mill Finish
Sec.4-2
1
GREENFASTENr"" PRODUCT GUIDE — GF-1
.;
Exploded Product View
vrt�
?ice
#
1 .iF.
3
u>4.
-. _
3
Cc
t � 5 i
tr 7-)
'
t �
�#
t�
r
M
i'
r.
O�
co
co
J _
Q
i N
� C
-„ 4J
LL
O
Lu
*Note:Numbers correspond with B.O.M,Sec.3-1
�2 �
r 6 Sec.I-I
r
F�
TM
.s a PRODUCT GUIDE
4 &eenFasten GF I Contents
£` Exploded F'r�ductViev�%— Sec. I
#nsta#talon Instructions Sec.2
Bill of Materials—:Sec. 3
CuW!/eets ..V54.rS.a
t ' Specifications— Sec.5
I
Lag`,Ralf Pull-Out Values'--Sec. 6
n Leakiest— Sec.7
rp
S
3 F i
yy S #
r t §{. L
t 8CoF.J,',t n Solar
Committed to the SUpport of Renewable Energy
t
CS6P-220/225/230/235/240/245/250P
Electrical Data CS6P-220P CS6P-225P CS6P-230P CS6P-235P CS6P•240P CS6P-245P CS6P-250P
Nominal Maximum Power at STC(Pmax) 220W 225W 230W 235W 240W 245W 250W
Optimum Operating Voltage(Vmp) 29.2V 29.4V 29.6V 29.8V 29.9V 30.OV 30.1V
Optimum Operating Current(Imp) 7.53A 7.65A 7.78A 7.90A 8.03A 8.17A 8.30A
Open Circuit Voltage(Voc) 36.6V 36.7V 36.8V 36.9V 37.OV 37.1V 37.2V
Short Circuit Current(Isc) 8.09A 8.19A 8.34A I 8.46A I 8.59A 8.74A 8.87A
Operating Temperature -40C—+85'C
Maximum System Voltage 1000V(IEC)/600V(UL)
Maximum Series Fuse Rating 15A
Power Tolerance +5W
Pmax -0.43%rC
Temperature Coefficient Voc -0.34%/C
ISC 0.065%IC
NOCT 45C
Under Standard Test Conditions(STC)of irradiance of 1000W1m'•spectrum AM 1.5 and cell temperature of 25'C
Mechanical Data
Cell Type Poly-crystalline
Cell Arrangement 60(6 x 10)
Dimensions 1638 x 982 x 40mm(64.5 x 38.7 x 1.57in)
Weight 20kg(44.1 Ibs)
Front Cover Tempered glass
Frame Material Anodized aluminium alloy
Standard Packaging(Modules per Pallet) 20pcs
Engineering Drawings IN Curves (CS6P-25OP)
IV
TI I
i s
I I I
a I I
l
n
`Specifications included in this datasheet are subject to change without prior notice
About Canadian Solar
Canadian Solar Inc. is one of the world's largest solar Canadian Solar was founded in Canada in 2001 and was successfully
companies.As a leading vertically-integrated manufacturer listed on NASDAQ Exchange (symbol: CSIQ) in November 2006.
of ingots, wafers, cells, solar modules and solar systems. Canadian Solar is on track to expand cell capacity to 700MW and
Canadian Solar delivers solar power products of
uncompromising quality to worldwide customers.Canadian module capacity to 1.3GW in 2010.
Solar's world class team of professionals works closely with
our customers to provide them with solutions for all their
solar needs.
Headquarters 0 Riverbend D
Ontario
Tel:+1-519-954-2057
Fax +1-519-578-2097
i
CanadianSolar
220/225/230/235/240/245/250P
On-grid Module
CS6P is a robust solar module with 60 solar
cells.These modules can be used for on-grid
solar applications.Our meticulous design and
production techniques ensure a high-yield,
long-term performance for every module
produced.Our rigorous quality control and
in-house testing facilities guarantee Canadian
Solar's modules meet the highest quality
standards possible.
Key Features
• Top ranked PVUSA(PTC)rating in California for higher Applications
energy production
. On-grid residential roof-tops
• 6 years product warranty(materials and workmanship); • On-grid commercial/industrial roof-tops
25 years module power output warranty • Solar power stations
Other on-grid applications
• Industry leading plus only power tolerance:+5W(+2%)
• Strong framed module,passing mechanical load test Quality Certificates
of 5400Pa to withstand heavier snow load
• IEC 61215,IEC 61730,IEC 61701,UL 1703,
• Ultra reliable in corrosive atmosphere,verified by CEC Listed,CE,KEMCO and MCS
IEC61701"Salt Mist Corrosion Testing" • IS09001:2008:Standards for quality
management systems
• The 1st manufacturer in the PV industry certified for • ISO/TS16949:2009:The automotive quality
ISO:TS16949(The automotive quality management management system
system)in module production since 2003 • QC080000 HSPM:The Certification for
Hazardous Substances Regulations
• 18017025 qualified manufacturer owned testing lab,
fully complying to IEC,TUV,UL testing standards
A IEC j:, CC ( ®OF
www.canadiansolar.com
May 28, 2014
To: Code Enforcement Division
From: James A. Marx, Jr. P.E.
Re: Engineer Statement for Vesel Residence, 3 High Meadow Rd.,Florence,MA
- Solar Roof Mount Installation
I have verified the adequacy and structural integrity of the existing roofing Main Roof I
(one layer composition): 2" x 10" rafters at 24"o.c., having roof slope distance 21'-9"
with rafter span 15'-0"; pitch 45 deg.; for mounting of solar panels and their installation
will satisfy the structural roof framing design-loading requirements of the Massachusetts
building code—780 CMR Residential Code 8th Ed.
For the installation of the solar mounting, the Unirac Solarmount rails will be anchored to
the rafters with L-foot supports with Ecofasten Green Fasten flashing and ECO-CP-SQ
Bracket located on the center of the rafters and will be securely fastened to the rafters at
48" sp. max. with 5/16"x 3 /z" SS lag bolts. The mounting system has been designed for
wind speed criteria of 90 mph Exp. B and ground snow criteria of 40 psf. All attachments
are staggered amongst framing members.
The Photovoltaic system and the mounting assemblies will comply with the applicable
sections of the Residential Code and loading requirements of roof-mounted collectors.
Thereby, I endorse the solar panel installation and certify this design to be structurally
adequate.
Sincerely, ���p Mss',
z
J NCI.'\fi�Cu O
James A. Marx, Jr. ,�F��
Professional Engineer °FMS,IoNr\�-�4 7
MA 36365 ®��•�
10 High Mountain Road
Ringwood, NJ 07456
cc: RGS Energy
,r
GOODS
Property Consent Form
Owner: .?Lt y t.ae;
Address: 3 4t$L, Q-
Town: c e n ra
State: 1 AA
Zip: 01 c)(
Phone: t Ca q S Cho q 5
I hereby give permission to Alteris Renewables, Inc., dba Real Goods Solar and their
representatives to pull the required permits for a solar installation on the above stated
Property.
Signed,
Zee H Date
32 laugwonk Spur,A 12 Stonington CT 06378
F'.860-5:1.5-3370 F:413-683-2225 www.RealGoods olar.conl
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
600 Washington Street
QV Boston,MA 02111
www mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name(Business/Organization/Individual): Alteris Renewables, Inc. dba RGS Energy
Address: 32 Tauqwonk Spur, Unit A-12
City/State/Zip: Stonington. CT 06378 Phone#: (860)535-3370
Are you an employer?Check the appropriate box: Type of project(required):
1.0 I am a employer with 120 4. ❑ I am a general contractor and 1 6. ❑New construction
employees(full and/or part-time).* have hired the sub-contractors
2.F1 am a sole proprietor or partner- listed on the attached sheet. E]Remodeling
ship and have no employees These sub-contractors have 8. ❑Demolition
working for me in any capacity. workers' comp. insurance. 9. ❑Building addition
[No workers'comp. insurance 5. ❑ We are a corporation and its
required.] officers have exercised their 10.❑Electrical repairs or additions
3.❑ I am a homeowner doing all work right of exemption per MGL 11.❑Plumbing repairs or additions
myself. [No workers' comp. c. 152,§1(4),and we have no 12.❑Roof repairs
insurance required.] t employees. [No workers' 13.❑x Other solar panels
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: Zurich American Insurance Co.
Policy#or Self-ins. Lic.#: WC5852405 Expiration Date: 01/01/2015
Job Site Address: 3 High Meadow Road City/State/Zip: Florence, MA 01062
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certif nder he pains d penalties of perjury that the information provided above is true and correct.
Si nature: Date:
Phone#: (860)535-3370
Official use only. Do not write in this area,to be completed by city or town officiaL
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: John Tierney 070531
License Number
44 Sabrina Brook Lane,Westfield, MA 01085 12/30/15
Address Expiration Date
� 413-568-2720
Si ature Telephone
9.Registered Home Improvement Contractor: Not Applicable ❑
Alteris Renewables dba RGS Energy 162709
Company Name Registration Number
32 Taugwonk Spur,A-12,Stonington, CT 06378 4/6/15
AddreS Expiration Date
Telephone 860-535-3370
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... lid No...... ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable l
New House ❑ Addition El Replacement Windows Alteration(s) ❑ Roofing ❑
Or Doors El
Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [p Siding[0] Other[al] solar
Brief Description of Proposed
Work: Installation of a 6kW roof mounted solar array using 24 Canadian Solar CS6P-250P modules,a Fronius IG Plus A 6.0-240 inverter&all associated electrical work.
Alteration of existing bedroom Yes X No Adding new bedroom Yes X No
Attached Narrative Renovating unfinished basement Yes x No
Plans Attached Roll -Sheet
6a.If New house and or addition to existing housina, complete the foliowina:
a. Use of building :One Family X Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft.of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? X Yes No.
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
Paul Vesel as Owner of the subject
property
hereby authorize Alteris Renewables dba RGS Energy
to act on my behalf,in all matters relative to work authorized by this building permit application.
see signed authorization form attached 2A, -V&
Signature of Owner Date
Alteris Renewables dba RGS Energy as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Kim Hendel
Print Nam
J k1w
Signature of Owner/Agent Date
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size
Frontage A 4
Setbacks Front
Side L: i R:i—ll
L::
Rear
Building Height
Bldg,Square Footage %
L--------- ........
Open Space Footage %
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
(volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO 0 DON'T KNOW YES 0
IF YES, date issued:1
L--- - 1 11---11-111---
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DON7 KNOW YES 0
IF YES: enter Book I
Page; Document#!
B. Does the site contain a brook, body of water or wetlands? NO DON7 KNOW YES
\L/ 0
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained Date Issued:
0
C. Do any signs exist on the property? YES 0 NO e
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing,grading,excavation,or filling)over I acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO &
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
r,l Department use only
�ll ity of Northampton Status of Permit:
uilding Department Curb Cut/Driveway Permit
JUL d 2014 212 Main Street Sewer/5epticAvailability
LRoom 100 Water/Well Avaiiability
Electric, Piumb;n &—G------�. N rthampton, MA 01060 Two Sets of Structural plans
9 as Inspect o
Northampton, MA pie 41 -587-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
Map Lot Unit
3 High Meadow Road
Zone Overlay District
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Paul Vesel 3 High Meadow Road,Florence,MA 01062
Name(Print) Current Mailing Address:
413-695-0045
see signed authorization form attached
Telephone
Signature
2.2 Authorized Agent:
Alteris Renewables dba h�S �� 32 Taugwonk Spur,A-12,Stonington, CT 06378
Name(Print) Current Mailing Address:
860-535-3370
Signature ff Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by ermit applicant
1. Building 5,000 (a)Building Permit Fee
2. Electrical 18,000 (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical(HVAC)
5.Fire Protection
6. Total=(1 +2+3+4+5) 23,000 1 Check Number
This Section For Official Use Only
Building Permit Number te
r.
Issued:
Signature:
Building Commissioner/inspector of Buildings Date
File#BP-2015-0112
APPLICANT/CONTACT PERSON REAL GOODS SOLAR INC
ADDRESS/PHONE 32 TAUGWONK SPUR RD UNIT Al2 STONINGTON (860)535-3370 Q
PROPERTY LOCATION 3 HIGH MEADOW RD
MAP 30A PARCEL 085 001 ZONE WSP(100)/URA(82)/SR(18)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out
Fee Paid lire
Typeof Construction: INSTALL 6 KW ROOF MOUNTED SOLAR ARRAY
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 070531
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO$MATION PRESENTED:
f/Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Pen-nit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
em Delay
Signature of Building Of icial Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
3 HIGH MEADOW RD BP-2015-0112
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 30A-085 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR PANELS BUILDING PERMIT
Permit# BP-2015-0112
Project# JS-2015-000203
Est. Cost: $23000.00
Fee: $138.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: REAL GOODS SOLAR INC 070531
Lot Size(sq. ft.): 73180.80 Owner: VESEL CHARLOTTE&PAUL W
Zoning: WSP(100)/URA(82)/SR(18)/ Applicant: REAL GOODS SOLAR INC
AT. 3 HIGH MEADOW RD
Applicant Address: Phone: Insurance:
32 TAUGWONK SPUR RD UNIT Al2 (860) 535-3370 O
Workers Compensation
STONINGTONCT06378 ISSUED ON.712912014 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL 6 KW ROOF MOUNTED SOLAR ARRAY
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 7/29/2014 0:00:00 $138.00
212 Main Street,Phone(413)587-1240, Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner