Loading...
10B-079 (3) EXIST. SHEATHING Iv LDesign ctural Support (2) 2xl2's CUT EXIST. FRAMING Services AS REQ'D, i R . SIMPSON LCE4 Conwayh'MA 01341 413-522-7771 SHEATHING AA lOd CMN. @ 4' k .; O.C., BOTH WAYS w - (3) 2x4's INTO DBL, 2x12. lo lo SIMPSON LTT19 lOd CMN. @ 8' (2) 2x12's ,` TENSION TIE Q O.C., STAGGERED, • INTO BOTH w STUDS, y oo lo J'O x 6' HEX HEAD J'O x 7 J' LAG EYE ° (2) 2x4's DE IGN BY: MR 6-29-14 LAG SCREW BOLT (AVAILABLE FROM FASTENAL> A PROJECT NO.: 14-052 3 lo x lo lo lo ra REV• DATE QESC• @Y_ li 0 6/30/14 FOR CONSTRUCTION MR ol lo oo i I PROJECT: a BLOCKING AT POINTS U GALVANIZED STEEL JAW AND JAW RENOVATIONS TURNBUCKLE, 5/8' 0 THREAD, 6' 54 WATER ST. lo u MAXIMUM ADJUSTMENT, 3500 LB ol lo - - - WORK LOAD LIMIT AVAIABLE FROM LEEDS, MA -"-..i..._...1� FASTENAL, VERIFY THAT BOLT ° I. ---_� WILL FIT IN JAW, PREPARED FOR: o SCAPES BUILDERS o 0 6 x 25 IPS, IWRC w V lo INYL COATED GALV. za EXCAVATION, LLC AIRCRAFT CABLE W/ lo THIMBLES & DOUBLE 110 N. HILLSIDE RD. CLIPS, BOTH ENDS. S. DEERFIELD, MA 01373 'HARVEST' 48 IN L DRAWING TITLE: i EARTH ANCHOR WITH 6 _ __. _ IN 0 AUGER i i �� 1 (AVAILABLE AT ` ! If SECTIONS TRACTOR SUPPLY) EMBED 36' MIN, INTO _.____ ...__............... .......t... _- SOIL -v/Cfl.. ' C::4 r 2 SECTION SECTION v SK3 J'= 1'-0' SK3 SK3 41= 1'-0' r, 2 Structural Support K3 EXTEND 2x12's TO K3 (2) 2x12's K3 OPP. o & o EXIST. CORNER FRAMING D2SIgr1 SerVICeS � SIMPSON LCE4 (1) SIDE, BOTH ENDS, 236 S. Shirkshire Rd.nway Coo 3-5,22 7 071 1341 Li Q � 0 2x4 BLOCKING so '� f ' a AL . 3 y x 3 D IGN BY: MR 6-29-14 PROJECT NO.: 14-052 J CL (3) 2x4's A'r (3) 2x4's REV. DATE DESC. liY 0 0 6/30/14 FOR CONSTRUCTION MR w (2) 2x4's PROJECT: Q ° RENOVATIONS I o 54 WATER ST. W LEEDS, MA SIMPSON LTT19 i o SIMPSON LTT19 PREPARED FOR: TENSION TIE TENSION TIE SCAPES BUILDERS 3 8c I EXCAVATION, LLC 110 N. HILLSIDE RD.M S. DEERFIELD, MA 01373 DRAWING TITLE: µ FRAMING - DETAIL ......_ .. _ FRAMING DETAIL SK2 SK2 4'= I-0, DESIGN CRITERIA: Structural Support DECK LIVE LOAD, 40 PSF FLOOR LIVE LOAD, 40 PSF Design Services GROUND SNOW LOAD, 40 PSF WIND SPEED, 90 MPH, EXP, B 236 S. Shirkshire Rd. Conway, MA 01341 GENERAL NOTES, 413-522-7771 1. CONTRACTOR SHALL APPLY FOR ALL PERMITS, AND SHALL PAY ALL PERMIT RELATED FEES, OF 2.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS. 3. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND x BRACING DURING CONSTRUCTION. j L ABBREVIATIONS, DESI BY: MR 6-29-14 DP. = DEEP K PROJECT NO.: 14-052 EA. = EACH EXIST. = EXISTING ` FTG. = FOOTING BEY._ DATE DESC. BY- O.C. = ON CENTER — — — —' — — — 0 6/30/14 FOR CONSTRUCTION MR OPP. = OPPOSITE P.T. = PRESSURE TREATED 1 REQ'D = REQUIRED PROJECT: SIM, = SIMILAR = TYPICAL W/ = WITH I I ` RENOVATIONS W/ ! 54 WATER ST. s LEEDS, MA PREPARED FOR: SCAPES BUILDERS ..._.... ....... — I EXCAVATION, LLC 110 N. HILLSIDE RD. ——— — S. DEERFIELD, MA 01373 DRAWING TITLE: NOTES EAST ELEVATION & SKl EAST ELEVATION SK1 ,k �-�I V,)c - A7 v C4, '". A �A,Z.Dvie-VC) �-A ",0? _ 71-1:::�v Q-:)qzl-11(�(--� �ll�4u/iY� /p / c/ cj r r-( Window Existing Window Unit F�4- Ll<- ;V- \VN A) l 1 51% 29' 4 7/16" eck Water Street Porch Expanded Deck New Pre-cast River Footer �4' 1 2 ' SCAPES BUILDERS &EXCAVATION.LLC. Morehouse Kitchen Renovation • Demolition of existing kitchen cabinets and vinyl flooring • New kitchen to stay within the original footprint • Change bathroom door location • 1 new triple mulled double hung window unit over sink(as noted on plans) • 1 new exterior door (as noted on plans) • Expanded deck at new exterior door location(will require 1 footing,precast) • Upgraded insulation (dense pack cellulose) in exterior walls to be demo'd at new window and door locations. • New hardwood flooring, kitchen cabinets, GWB • Wiring and plumbing per code • New gas fireplace to replace the existing vented unit. I 10 North Hillside Road P.O. Box 469 South Deerfield; MA 01373 P. 413.665.0185 F. 413.665.0186 www.scapesbui]ders.com The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lezibly Name(Business/Organization/Individual): Cs ��2 v t �c�evS -CK Cc, -V nN WLC Address: k \0 1\�. t I �S ,CA 2 City/State/Zip: M k C-, r��'�Phone t Are you an employer?Check the appropriate box: Type of project(required): 1. I am a employer with ` �> 4. ❑ I am a general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. t 7. JKJ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp.insurance. 9. ❑ Building addition [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.❑ Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4), and we have no 12.❑ Roof repairs insurance required.] t employees. [No workers' 13.❑ Other comp. insurance required.] 'Any applicant that checks box#] must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site Information. Insurance Company Name: 1 a Policy#or Self-ins. Licc..#:`�,►' M+— `6O(::) '3G(S 4 1-C)\1-k Expiration Date: 2- Job Site Address: q A­e-v City/State/Zip: U z a Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under thepains andpenalties ofperjury that the information provided above is true and correct Si nature: ,-- Date: l [ V 46 Phone#: 1 C Ofjlcial use only. Do not write in this area,to be completed by city or town ofjiclal City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: '1 SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: LL Not Applicable ❑ Name of License Holder: �' U 1�Q C S ~ 1 CD C, �<, U2 License Number 22d av s S �' ��_ t<<d , AAA S/i3 Z'ZO110 Address Expiration Da e j- SigWture Telephone 9.Realletered Home Improvement Contractor: Not Applicable ❑ Spa Q % . \�a�s c k ca L-L C Z C) !03 2 Company Name Registration Number tku N\ - 0(k� � ��� �Q VQ / -�-/1 -,�— Address Expiration Date Telephone UOC \ SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 1& No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 10835.1, Definition of Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs M Decks [[a Siding Qom, Other[� Brief Description of Proposed Work: V\t c1%V_ S a•4 tot Alteration of existing bedroom Yes v""'No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes N Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building :One Family ✓ Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT as Owner of the subject property hereby authorize C�CGv to act y behalf, in a afters relative to work authorized by this building permit application. L Signature of Owner Date G �e S v l S as Owner/Authorized Agent hereby declare that the statements and i formation on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties ooff perjury. � Print Name Signatur of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by e Building Department Lot Size Frontage Setbacks Front Side L: �R: z4 L: R: Rear 1 2 2 Building Height 2 T Bldg.Square Footage % Open Space Footage % (Lot area minus bldg&paved k Z j 'S parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? DON'T KNOW ® YES O NO O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DON'T KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DON'T KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO IV IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability. Northampton, MA 01060 Two Sets of Structural Plans- phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office j ek Map Lot Unit Xk ck Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT '1 //►► 2.1 Owner of Record: ^^ S4 l s'� ed i AA (bS3 Name( rin Current Mailing Address: (r`� 3 Telephone L [ Signature 2.2 Authorized Agent: s l &A G- y e- Z-Slc-c, MA Name(Print) Current Mailing Address: Signat6W Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 4A + � -� (a) Building Permit Fee 2, Electrical A- (b) Estimated Total Cost of Construction from 6 3. Plumbing ' Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) Check Number This Section For Official Use Only Building ermit Number: Date g Issued: Signature: Building Commissioner/Inspector of Buildings Date Le- File GC �a de-^Cs®#BP-2014-1359 APPLICANT/CONTACT PERSON SCAPES BUILDERS&LANDSCAPING LLC ADDRESS/PHONE P O BOX 469 DEERFIELD (413)665-0185 Q PROPERTY LOCATION 54 WATER ST MAP IOB PARCEL 079 001 ZONE URB(121)/WP(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction• REMODEL KITCHEN New Construction Non Structural interior renovations Addition to Existinp- Accessory Structure Building Plans Included• Owner/Statement or License 105802 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. File#BP-2014-1359 APPLICANT/CONTACT PERSON SCAPES BUILDERS&LANDSCAPING LLC ADDRESS/PHONE P O BOX 469 DEERFIELD (413)665-0185 Q PROPERTY LOCATION 54 WATER ST MAP IOB PARCEL 079 001 ZONE URBO21)/WP(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Tyneof Construction: REMODEL KITCHEN BATH,&EXPAND DECK New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 105802 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFOR,MAXION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 2- 7111G Si re ing fficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 54 WATER ST BP-2014-1359 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 1013-079 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit# BP-2014-1359 Project# JS-2014-002289 Est.Cost: $50450.00 Fee: $302.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: SCAPES BUILDERS & LANDSCAPING LLC 105802 Lot Size(sq. ft.): 11586.96 Owner: MOREHOUSE ANNE&MARY HURLBURT Zoning: URB(121)/WP(100)/ Applicant: SCAPES BUILDERS & LANDSCAPING LLC AT: 54 WATER ST Applicant Address: Phone: Insurance: P O BOX 469 (413) 665-0185 () WC DEERFIELDMA01373 ISSUED ON.71312014 0:00:00 TO PERFORM THE FOLLOWING WORK:REMODEL KITCHEN, BATH, & EXPAND DECK POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType• Date Paid: Amount: Building 7/3/2014 0:00:00 $302.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner