Loading...
25C-046 (9) DEP?.RTMENT OF BUILDI7tiG INSPECTIONS ,INSPECTOR 212 Main Street o Municipal Building Northampton,MA 01060 LOCATION_ 2 7 !f ai±ip SQUARE FOOTAGE AMOUNT i L/ BASEMENT @ 20 Vic/ .� l2X I'FLOOR @.50 i Q • ' . /fix � � 39. 2ND FLR @:30 FLOORS, FINISH ATTIC,GARAGE @.20 DECK/PORCHES @ -20 TOTAL. 2006 IECC Energy Efficien'cy Certificate K K Ceiling/Roof 38.00 Wall 19.00 Floor/Foundation 19.00 Ductwork(unconditioned spaces): Window 0.32 0.30 Door 0.15 NA Forced Hot Air Furnace 90 AFUE Water Heater: Name: Date: Comments: F-i Ducts in unconditioned spaces or outside the building are insulated to at least R-8. ❑ Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. Duct Construction: Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. F-1 Building framing cavities are not used as supply ducts. F-1 Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. Temperature Controls: Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. Circulating Service Hot Water Systems: F-1 Circulating service hot water pipes are insulated to R-2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-2. Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. NOTES TO FIELD:(Building Department Use Only) .............................................................................................................. . Project Title: Brodwyn Workshop Report date: 05/29/09 Data filename: C:\Program Files\Check\REScheck\Energy Audits\Lamagdeleine Ron\Brodwyn workshop.rck Page 3 of 3 E the k Software Version 4.2.2 Inspection Checklist Ceilings: ❑ Ceiling 1: Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame, 16"o.c., R-19.0 cavity insulation Comments: Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.320 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Note:Up to 15 sq.ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Doors: ❑ Door 1: Solid, U-factor:0.150 Comments: Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space, R-19.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Heating and Cooling Equipment: ❑ Furnace 1: Forced Hot Air:90 AFUE or higher Make and Model Number: Air Leakage: ❑ Joints, penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM E283 labeled,or 3)installed inside an air-tight assembly with a 0.5"clearance from combustible materials and a 3"clearance from insulation. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U-factors,and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: Project Title: Brodwyn Workshop Report date: 05/29109 Data filename: C:\Program Files\Check\REScheck\Energy Audits\Lamagdeleine Ron\Brodwyn workshop.rck Page 2 of 3 9 REScheck Software Version 4.2.2 Compliance Certificate Project Title: Brodwyn Workshop Energy!Code: 2006 IECC Location: Northampton, Massachusetts Construction Type: Single Family Project Type: Alteration Heating Degree Days: 6404 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: 224 North St. Ron Lamagdeleine Northampton,MA �• Q Compliance:0.8%Better Than Code Maximum UA:119 Your UA: 118 s a a 0 K i1 jB K Ky P Ceiling 1: Flat Ceiling or Scissor Truss 482 38.0 0.0 14 Wall 1:Wood Frame, 16"o.c. 828 19.0 0.0 42 Window 1:Vinyl Frame:Double Pane with Low-E 112 0.320 36 Door 1:Solid 23 0.150 3 Floor 1,All-Wood Joist/Truss:Over Unconditioned Space 482 19.0 0.0 23 Furnace 1: Forced Hot Air 90 AFUE Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2006 IECC requirements in REScheck Version 4.2.2 and to comply with the mandatory requirements listed REScheck inspection Checklist. i J✓e x ��< < Name-Title Si natur Da ........ ......... ......... ......... ......... . .... Project Title: Brodwyn Workshop Report date: 05/29/09 Data filename: C:\Program Files\Check\REScheck\Energy Audits\Lamagdeleine Ron\Brodwyn workshop.rck Page 1 of 3 IECC Energy Efficiency Certificate R % Ceiling/Roof 38.00 Wall 19.00 Floor/Foundation 19.00 Ductwork(unconditioned spaces): Bf s} a x $ Window 0.32 Door 0.56 NA Water Heater: IMENOM Name: Date: Comments: * Lj Ducts in floor trusses above unconditioned spaces or above the outdoors are insulated to at least R-6. Duct Construction: ❑ Air handlers,filter boxes,and duct connections to flanges of air distribution system equipment or sheet metal fittings are sealed and mechanically fastened. F-1 All joints,seams,and connections are made substantially airtight with tapes,gasketing,mastics(adhesives)or other approved closure systems.Tapes and mastics are rated UL 181A or UL 181 B. ❑ Building framing cavities are not used as supply ducts. F-I Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. F-1 Additional requirements for tape sealing and metal duct crimping are included by an inspection for compliance with the International Mechanical Code. Temperature Controls: ❑ Thermostats exist for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor is provided. Certificate: F-I A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment. NOTE$TO FIELD:(Building Department Use Only) Project Title: Brodwyn Sun Room Report date: 05/29/09 Data filename: Untitled.rck Page 3 of 3 w REScheck Software Version 4.2.2 Inspection Checklist RARAOR Ceilings: ❑ Ceiling 1: Flat Ceiling or Scissor Truss, R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame, 16"o.c., R-19.0 cavity insulation Comments: Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.320 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Note:Up to 15 sq.ft.of glazed fenestration per dwelling is exempt from U-factor and SHGC requirements. Doors: ❑ Door 1:Solid, U-factor:0.560 Comments: This door is exempt from the U-factor requirement. Floors: ❑ Floor 1:All-Wood Joist/Truss:Over Unconditioned Space, R-19.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed. ❑ Recessed lights are either 1)Type IC rated with enclosures sealed/gasketed against leaks to the ceiling,or 2)Type IC rated and ASTM E283 labeled,or 3)installed inside an air-tight assembly with a 0.5"clearance from combustible materials and a 3"clearance from insulation. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it has been determined that moisture or its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: Materials Identification and Installation: ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications. ❑ Insulation is installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. Duct Insulation: ❑ Ducts in unconditioned spaces or outside the building are insulated to at least R-8. ............................................................................. ......... .......... ........ .............. Project Title: Brodwyn Sun Room Report date: 05/29/09 Data filename: Untitled.rck Page 2 of 3 R REScheck Software Version 4.202 Compliance Certificate Project Title: Brodwyn Sun Room Energy Code: 2006 IECC Location: Northampton, Massachusetts Construction Type: Single Family Project Type: Alteration Heating Degree Days: 6404 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: 224 North St Ron Lamagdeleine Northampton,MA a e Compliance:2.6%Better Than Code Maximum UA:84 Your UA:82 s Ceiling 1: Flat Ceiling or Scissor Truss 180 38.0 0.0 5 Wall 1:Wood Frame, 16"o.c. 398 19.0 0.0 15 Window 1:Vinyl Frame:Double Pane with Low-E 133 0.320 43 Door 1: Solid 20 0.560 11 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 168 19.0 0.0 8 Compliance Statement. T roposed building design described here is consistent with the building plans,specifications,and other calculations submitted wig t e permit application.The proposed building has been dea'gned to meet the 2006 IECC requirements in REScheck Version 4.2. a to comply with the mandatory requirements listed in th EScheck Inspection Checklist. /l Na e--Title Signatur Da q ................................................................................................. Project Title: Brodwyn Sun Room Report date: 05129/09 Data filename: Untitled.rck Page 1 of 3 HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, "Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a home owner." The building department for the City of Northampton wants person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations_ The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work(electrical, plumbing&gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections.Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts Department of Industrial Accidents Office bf Investigations 600 fEashington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/EIectricians/Plumbers Applicant Information Please Print Legibly / ._ J Name (Business/Organization/Individual): !L� ` — 4c 141-P 1 e i A.-,� _ Address: i 12- � O L-j n t 0 U/o Z.7 City/State/Zip: eJ 1 hln-i5 ► Phone#: ( 13 /6 Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 6. ❑New construction mployees (full and/or part-time).* have hired the sub-contractors 2.Tri am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodelinc, ship and have no employees These sub-contractors have g. ❑ Demolition working for me in an ca employees and have workers' Y capacity.n 9. ❑Building addition [No workers' comp.insurance comp. insurance.T required.] 5. ❑ We are a corporation and its 10.El Electrical repairs or additions officers have exercised their 11. Plumbing repairs or additions 1.❑ I am a homeowner doing all work ❑ myself. [No workers'comp. right , exemption per MGL c. 152, 12.❑Roof repairs insurance required.] t §1(4),and we have no employees. [No workers' 13.❑ Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. ,Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under th ins andpenalties ofperjury that the information provided above is true and correct. Sienature: Date: Z 2 Z��' oF Phone#: Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Appplicable ❑ Name of License Holder: ' k c �A►n A ��n��i N�- d o 67 Ll License Number Address Expiratio Date Signature 47 Telephone 9.Registered'Horne,liii o inent Contractor., i. .„aw..� Not Applicable ❑ 26 /0 /7 0 V Company Name V Registration Number 11z Louie Louiet 14 1�d 2 w m aki r+ 01027 6 12 41202 Address Expiration Dafe zs Telephone VI?117A/69 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L,c.`152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ 11. - 1lome Owner- Am,11.jon= The current exemption for"homeowners”was extended to include Owner-occupied DwellinEs of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for.you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the_.State$uilding_Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition Replacement Windows Alteration(s) Roofing ❑ Or Doors 1:1 Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [Q Siding[0] Other[p] Brief Description of Propose , / Ta i —Work: 00 , / K 19'eTs� -f.11 A Alteration of existing bedroom Yes o Adding new bedroom Yes ­--"'No Attached Narrative Renovating unfinished basement Yes �� No Plans Attached Roll -Sheet sa. If New house and or additi.onto--existing'.h6 sing; complete the following: a. Use of building:One Family �� Two Family Other b. Number of rooms in each family unit: Number of Bathrooms Z c. Is there a garage attached? 1✓0 d. Proposed Square footage of new construction. -4 7 4D Xl_ Dimensions /V e. Number of stories? f. Method of heating? G t4 S Fireplaces or Woodstoves f J Number of each g. Energy Conservation Compliance. i%ey Masscheck Energy Compliance form attached? we S 7 / h. Type of construction J/L'd, .fl..,e{ i. Is construction within 100 ft.of wetlands? Yes C/No. Is construction within 100 yr. floodplain Yes -- -'N'o j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? --"'Yes No. 1. Septic Tank City Sewer J Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE;COMPLETED WHEN /OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1 &�- J ,as Owner of the subject property A ,-`� � hereby authorize l� `" 0_�a Q d jag! to act on my behalf ' all matters relative to wa authorized by this building permit application. 2 '! Siqnattie bf Owner _ _ -- -- Dat C A,� P" e ��Ar as Owner/Authorized Agent hereby declare that e s atements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pain nd penalties of perjury. Print Name t �7//,? Signature 6f Owner/46nt Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage h0 Setbacks Front r m... ,® Side L:'..-Z1'V-'_- R _ � L R Rear � c Building Height _ a T Bldg. Square Footage Open Space Footage % _._. (Lot area minus bldg&pavedjfla�� parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Findinkever been issued for/on the site? NO 0 DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES IF YES: enter Book Page _µ `' and/or Document# . B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: D. Are there an proposed changes to or additions of signs intended y p p g g ended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,ex ation, or filling)over 1 acre or is it part of a nnmmnn plan that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. „.,_, €a r Deparinent tJSe�ttf City of Northampton ,6uilding Department CI,� ar� - � 3y3 212 Main Street sewerrS ali ar�IabI `M Room 100 ater�elvalt N09 Northeimpton, MA 01060 F, a etsk fSt uctt�ra Piat�s hone 413-P87-1240 Fax 413-587-1272 PIo �Plans � APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: }� a`1 !A” t* Map Lot Unit lV ury)& j AV� p�c�lo© Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: J a yr, X11- f3 N4'Gl AA;7t4a to A4 Name(Print) Curre a ling A r Telephone Signat r 2.2 Au orized Agent: I I Z �.Ig Yc ��11 1�D Lu�r rn�►��j 0i c7 7 Name(Print) G Current Mailing Address: —2 2 &G 9 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only com leted by ermit applicant 1. Building (a)Building`PermitFee 2. Electrical (b)Estimated Total Cost of 30 construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) `�pj Ewe �o Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/inspector of Buildings- Date r File#BP-2009-1008 APPLICANT/CONTACT PERSON RONALD LAMAGDELEINE ADDRESS/PHONE 112 LAUREL HILL RD WESTHAMPTON (413)527-8169 PROPERTY LOCATION 224 NORTH ST MAP 25C PARCEL 048 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid BuildinjZ Permit Filled out Fee Paid wole5l Z? Typeof Construction: CONSTRUCT 12 X 14 SUNROOM/WORKSHOP 12 X 14 ADDITIONS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 8067 3 sets of Plans/Plot Plan THE FO OWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFPXNIATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 06 tz� 6� Signature of Buil i g Official v Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 24`11+ BP-2009-1008 GIs#: COMMONWEALTH OF MASSACHUSETTS 048 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2009-1008 Project# JS-2009-001041 Est. Cost: $78800.00 Fee: $283.50 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: RONALD LAMAGDELEINE 8067 Lot Size(sq. ft.): 7579.44 Owner: BRODWYN JANE MEYERSON Zoning URB(100)/ Applicant: RONALD LAMAGDELEINE AT. 224 NORTH ST Applicant Address: Phone: Insurance: 112 LAUREL HILL RD (413) 527-8169 WESTHAMPTONMA01027 ISSUED ON:612512009 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 12 X 14 SUNROOMMORKSHOP 12 X 14 ADDITIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/25/2009 0:00:00 $283.50 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo