Loading...
36-301 (3) / 4 LAJ �r reor � � .. max�murn -- structure line oV princip111 (co etVy d.j.A / V6 �N X 02 W CAD TrI R O O . Y Z�( t OD 416 La s c�nG 40 Q a � cp o 36, 9 • " / 4 � g / 150. -w ✓" S 60('23r 47 W (1Z -- rv' r CITY OF NORTHAMPTON, MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS 125 Locust Street Northampton, MA 01060 413-587-1570 Samuel B. Brindis, P.E. Fax 413-587-1576 Director, City Engineer Guilford B. Mooring, P.E. Assistant Director of Public Works BOARD OF PUBLIC WORKS DRIVEWAY PERMIT GENERAL INSTRUCTIONS AND REGULATIONS 1. A "Driveway Permit" is required in all cases where a new curb cut or an alteration to an existing curb cut is proposed on a City public way. 2. Driveway permits issued by the Board of Public Works (BPW) shall be attached to and become part of the 'Building Permit" issued by the Building Inspector. 3. Prior to the issuance of a 'Building Permit" the owner of any lot to be serviced by a new driveway shall apply to the BPW for a 'Driveway Permit" by completing the pertinent portions of the permit(see attached). Once the location of the driveway is approved by the BPW, a building permit may be issued. 4. The Building Inspector shall not issue an "Occupancy Permit" unless the driveway to the lot has been approved by the BPW. 5. By the issuance of a driveway permit for the stated location, neither the City of Northampton nor the Department of Public Works imply that no drainage problems will result with the driveway when constructed. Properties situated or driveways installed in low lying areas in the path of the natural drainage will be subject to water problems. These problems may include water sheeting across roadways adjacent to the driveway. The City and the DPW assume no responsibility for any such drainage problems. The owner of the property is responsible for constructing and maintaining the driveway with adequate provision for natural water runoff situations. z;OPamuel B Brindis, P.E. Director of Public Works C:V\4yFi1es\L3,n\Driveivay Permit General Instructions D04-01 i Conditions: Driveway Permit In lieu of plan approved by City Engineer I agree to the following added conditions: 1) I will contact the Department of Public Works and have an inspector check and approve the graded gravel base prior to paving to insure compliance with slope and location; 2) I further agree that if in the inspections any of the permit conditions are not met that I will at no expense to the City remove and replace the driveway as directed by the City Engineer. By: Pe tioner • NOTE: The Public Works Department recommends that you provide a plan showing the proposed driveway with grades and location in the future to avoid possible expense which you will incur by not getting approval of actual plans in advance. D09-01 r C I TY OF N 0 RTHAMP TON, MASS. September 18, 2000 THE BOARD OF PUBLIC WORKS The undersigned respectfully petiition your honorable body for Permission to install driveway at 829 Burts Pit Road Fifteen (15) foot maximum width at the street line. Gutter drainage not to be disturbed. All drainage shall be directed off the driveway surface to adjacent land and not on the existing roadway. Driveway surface to be paved if the grade of the proposed driveway exceeds 37 or more. By: Choice Builders 413-268-9322 PO Box 716, Goshen, MA 01032 Proposed Location Inspected by: Gravel Base Grade Inspected by: Final Approval: THE BOARD OF PUBLIC WORKS Voted that petition be granted. $25.00 Fee Paid Ck No 3810 George Andrikidis, Acting Director Public Works (SUBJECT TO ATTACHED CONDITION 1 & 2) NORTHAMPTON WATER DEPARTMENT 237 PROSPECT STREET NORTHAMPTON, MA 01060 587-1098 Subject : Municipal Water Availability Location: 829 Burts Pit Road Lot 14 Inquiry Made By• Edward Mazur 584-2134 Date of Inquiry: June 16, 1999 Municipal Water Main in Front of Location: YES % NO Size/Material/Age of Water Main: 12" A.C. 1966 Approximate Street Pressure: 50 PSI Size of Service Connection: 3/4" The Water Department cannot guarantee adequate water pressure Comments : during peak demand times at elevations above 320 feet. / A corresponding"water entrance fee" shall be paid prior to making any connection to the municipal water system. Arrangements of such installation shall be made with the Northampton Water Department with a minimum of 5 working days notification. All work shall conform to Northampton Water Department specifications. Charle orowski Superintendent of Water Enclosure: Letter to Frank Sienkiewicz from Sam Brindis, dated June 14, 1991. cc: Samuel B. Brindis, Director, DPW Guilford Mooring, Assistant Director, DPW George Andrikidis, Assistant City Engineer Anthony Patillo, Building Inspector A:\WATER\Availabl.50S �� - 30/ g 1�� NORTHAMPTON SEWER DEPARTMENT 125 LOCUST STREET NORTHAMPTON, MA. 01060 587-1092 Subject: Municipal Sewer Availability Location: 829 Burts Pit Road Lot #4 Inquiry Made By: Edward Mazur 584-2134 Date of Inquiry: June 16, 1999 Municipal Sewer Main in Front of Location: YES % NO Size/Material/Age of Sewer Main: 1999 Depth of Sewer Main: 6' Size of Service Connection: 611 Comments : A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Sewer Department with a minimum of 5 working days notification. All work shall conf to Northampton Sewer Department specifications. George rehm Superintendent of Wastewater Treatment & Collection cc: Samuel B. Brindis, Director, DPW Gilford Mooring, Assistant Director DPW George Andrikidis, Assistant City Eng neer Anthony Patillo, Building Inspector C: \WP51\LETTER\SEWERFOR