CITY OF NORTHAMPTON, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
125 Locust Street
Northampton, MA 01060
413-587-1570
Samuel B. Brindis, P.E. Fax 413-587-1576
Director, City Engineer
Guilford B. Mooring, P.E.
Assistant Director of Public Works
BOARD OF PUBLIC WORKS
DRIVEWAY PERMIT
GENERAL INSTRUCTIONS AND REGULATIONS
1. A "Driveway Permit" is required in all cases where a new curb cut or an alteration to an
existing curb cut is proposed on a City public way.
2. Driveway permits issued by the Board of Public Works (BPW) shall be attached to and
become part of the 'Building Permit" issued by the Building Inspector.
3. Prior to the issuance of a 'Building Permit" the owner of any lot to be serviced by a new
driveway shall apply to the BPW for a 'Driveway Permit" by completing the pertinent
portions of the permit(see attached). Once the location of the driveway is approved by the
BPW, a building permit may be issued.
4. The Building Inspector shall not issue an "Occupancy Permit" unless the driveway to the lot
has been approved by the BPW.
5. By the issuance of a driveway permit for the stated location, neither the City of Northampton
nor the Department of Public Works imply that no drainage problems will result with the
driveway when constructed. Properties situated or driveways installed in low lying areas in
the path of the natural drainage will be subject to water problems. These problems may
include water sheeting across roadways adjacent to the driveway. The City and the DPW
assume no responsibility for any such drainage problems. The owner of the property is
responsible for constructing and maintaining the driveway with adequate provision for natural
water runoff situations.
z;OPamuel B Brindis, P.E.
Director of Public Works
C:V\4yFi1es\L3,n\Driveivay Permit General Instructions
D04-01
i
Conditions: Driveway Permit
In lieu of plan approved by City Engineer
I agree to the following added conditions:
1) I will contact the Department of Public Works and have
an inspector check and approve the graded gravel base
prior to paving to insure compliance with slope and
location;
2) I further agree that if in the inspections any of the
permit conditions are not met that I will at no expense
to the City remove and replace the driveway as directed
by the City Engineer.
By:
Pe tioner •
NOTE: The Public Works Department recommends that you provide a
plan showing the proposed driveway with grades and location
in the future to avoid possible expense which you will incur
by not getting approval of actual plans in advance.
D09-01
r
C I TY OF N 0 RTHAMP TON, MASS.
September 18, 2000
THE BOARD OF PUBLIC WORKS
The undersigned respectfully petiition your honorable body for
Permission to install driveway at 829 Burts Pit Road
Fifteen (15) foot maximum width at the street line. Gutter drainage not to be
disturbed. All drainage shall be directed off the driveway surface to
adjacent land and not on the existing roadway. Driveway surface to be
paved if the grade of the proposed driveway exceeds 37 or more.
By:
Choice Builders 413-268-9322
PO Box 716, Goshen, MA 01032
Proposed Location
Inspected by:
Gravel Base Grade
Inspected by:
Final Approval:
THE BOARD OF PUBLIC WORKS
Voted that petition be granted.
$25.00 Fee Paid Ck No 3810
George Andrikidis, Acting Director Public Works
(SUBJECT TO ATTACHED CONDITION 1 & 2)
NORTHAMPTON WATER DEPARTMENT
237 PROSPECT STREET
NORTHAMPTON, MA 01060
587-1098
Subject : Municipal Water Availability
Location: 829 Burts Pit Road Lot 14
Inquiry Made By• Edward Mazur 584-2134
Date of Inquiry: June 16, 1999
Municipal Water Main in Front of Location: YES % NO
Size/Material/Age of Water Main: 12" A.C. 1966
Approximate Street Pressure: 50 PSI
Size of Service Connection: 3/4"
The Water Department cannot guarantee adequate water pressure
Comments :
during peak demand times at elevations above 320 feet. /
A corresponding"water entrance fee" shall be paid prior to making any connection to the municipal
water system. Arrangements of such installation shall be made with the Northampton Water
Department with a minimum of 5 working days notification. All work shall conform to
Northampton Water Department specifications.
Charle orowski
Superintendent of Water
Enclosure: Letter to Frank Sienkiewicz from Sam Brindis, dated June 14, 1991.
cc: Samuel B. Brindis, Director, DPW
Guilford Mooring, Assistant Director, DPW
George Andrikidis, Assistant City Engineer
Anthony Patillo, Building Inspector
A:\WATER\Availabl.50S
�� - 30/
g 1��
NORTHAMPTON SEWER DEPARTMENT
125 LOCUST STREET
NORTHAMPTON, MA. 01060
587-1092
Subject: Municipal Sewer Availability
Location: 829 Burts Pit Road Lot #4
Inquiry Made By: Edward Mazur 584-2134
Date of Inquiry: June 16, 1999
Municipal Sewer Main in Front of Location: YES % NO
Size/Material/Age of Sewer Main: 1999
Depth of Sewer Main:
6'
Size of Service Connection: 611
Comments :
A corresponding "sewer entrance fee" shall be paid prior to making
any connection to the municipal sewer system. Arrangements of such
installation shall be made with the Northampton Sewer Department
with a minimum of 5 working days notification. All work shall
conf to Northampton Sewer Department specifications.
George rehm
Superintendent of Wastewater
Treatment & Collection
cc: Samuel B. Brindis, Director, DPW
Gilford Mooring, Assistant Director DPW
George Andrikidis, Assistant City Eng neer
Anthony Patillo, Building Inspector
C: \WP51\LETTER\SEWERFOR