Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
17A-297
a. Smokes in each bedroom,within 10'of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 38. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7 39. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30 measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated,gasketed, and secured in place. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday,8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller(D-northamptonma.gov Thank you for your cooperation on a matters. huck Miller City of Northampton Assistant Commissioner and Zoning Enforcement 22. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule.780 CMR R312.1. 23. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole. Notches are different. 24. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%Z"strap across the area and 6" beyond each side with 8- 10nd nails.780 CMR R602.6.1 25. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3' clearance from windows.780 CMR M1502.3 26. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780 CMR M1502.4.3 27. Dryer duct maximum equivalent length is 25' less 5' per 901 elbow or per manufacturer's specs.780 CMR M1502.4.4.1, no screwed connections. 28. Markup air is required for any exhaust hood of 400 CFM or more. 780 CMR M1503.4 29. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 30. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and bottom (floor) plates,soffits, and every 10'within enclosed cavities. 780 CMR R302. 31. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316. 32. Dwelling/Garage fire separation.An attached garage (within 3' of main structure) is required to have%2" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 33. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity,which you must create. 34. Vapor retarders. Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier. An air barrier is intended to stop air flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation,which is dirt filter out of the air moving through the insulation.780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 35. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 36. Deck ledgers and post must be appropriately attached, bolts or lags.780 CMR R502.2.2.1 Note:Thrul-oks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 37. Smoke and CO detectors as required. 780 CMR R314 and R315. 8. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust only systems),or treating the space with supply and return.See 780 CMR R408 10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut.780 CMR R802.3. 13. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and number of jack studs required. 14. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. 1-joist and or Floor Truss c. Roof truss 15. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used.780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 16. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 17. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used,6'8"for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended 18. Hazardous glazing locations,within 24 of a door, or within 60" of a stair,or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations.780 CMR R308.4 19. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule.Order restrictors. 780 CMR R612.2 20. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape.780 CMR R310 b. Windows within 44 of floor, DH 3.3 sqft min window size, Casement 20"x41"exception 5 sqft at 1"floor. Minimum clear opening 20"x24" or 24"x20".780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel,opening measured from the face of the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7 V from the top of the threshold and only in-swinging doors.780 CMR R311.3 21. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8%",maximum overall variance for the run is 3/8",4 sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade,6" in the triangle. Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post.780 CMR R311.7. City of Northampton 9 Massachusetts DEPARTMENT OF BUILDING INSPECTIONS � 212 Main Street • Municipal Building Northampton, MA 01060 ss .'V INSPECTOR Kohl Construction March 31,2014 31 Campus Lane Hadley, MA. Subject Location: 140 Hillcrest Road Map Block: 17A-297 Mr. Lloyd, Your building permit application and plans dated 10-29-2014 have been approved as drawn, noted, and per this memo.All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. Complete electronic set of revised drawings. 2. Ridge boards are required to be full depth of the cut per R802.3. 3. All point loads must have a continuous load path to appropriate bearing. 4. The footing below BM 1-3 appears to be undersized for the cumulative loads.The assumed bearing capacity of the soils without testing is 2000 lbs per SQFT. 5. Must meet stretch code, duct blast results, and a signed Thermal Bypass Checklist. 6. Smoke/COs to current code throughout per R314 and R315 with amendments. 7. Collar ties in the upper 1/3 rd of the rafters or ridge ties per R802.3.1. 8. Positive connection from the rafters to the plates/joist they rest upon. 9. Truss engineering must be provided. 10. Truss, 1-Joist, and LVLs must be installed per manufacturers written requirements including blocking and nailing patterns. Note:August 16th 2013 begins the newest energy code 20121ECC with MA amendments with a concurrency period until July 1,2014 and an expectation of a new Stretch Code. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http•//publicecodes.cyberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required.780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be Y2" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. COMPANY PROJECT Gould/Matson 140 Hillcrest Drive Wood Wor ks Northampton Kohl Construction Mar. 31, 2014 15:06 FLSHBIVI 2-3.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: 3 t a r n 3 ta r d: F',1 1, Area f D e, 0 w Ar e a D Dead Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 8'-12" ..... ................ .......... 01 F-1.6" vey Sn r s < C a c v 1121' S c t S 2 6 4 1 01.,5 3 L en t n 6 C —b- 425 S'L;2 "Minimum bearing length governed by the required width of the supporting member. LVL n-ply, 2.01E, 286OFb, 1-3/4""x11-7/8", 2-ply(3-1/2"x11-718") Supports: All-Lumber-soft Sill plate, S-P-F No.1/No.2 Total length: 6-3.2", Lateral support: top=full, bottom=full; Repetitive factor: applied where permitted (refe 'fIT T 5 41) 0 57 GNqL PROJECT COMPANY Gould/Matson Woodworks 140 Hillcrest Drive vorfwAst k-a wor'w Northampton Kohl Construction Mar, 31, 2014 15:03 BM 14,wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: ad e nb i�agn e 2ni;ry lo oern Staw End szarlz End '77 Dee--as d Full Area N L-7716.507 ps 1 S1 live Full Area ye,'�' J.21 L i wr F"11 Arsa yes, 8.4 18AW PH jself-weigLt Dtaq Full UDL 12.0 10f *:�ributary WinizK (ft) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 24*-6" ............. ............ 01 3" 24'-4,8" Dew j 4IC31 1234 Factored: Ulift 53 Topta,l 22111 Rod 59621 1623 hearing: Capacity Ream 35901 HS51 7447 2,9, supperls 2252 5962 1625 C.63 S"Pporn 1.0 Load comb 48 Len-jtn 1. 3 2.f: 2.4 r; C.99 min req'd 1 . 37** 2.01— 2.46" j.99*1 7�t 1.00 1 . 13 1.15 1.00 Cb min 1 .:3 Cb support 11 1. 11' Fco suc. 425, 625 625 4211 **Minimum bearing length governed by the required width of the supporting member. LVL n-ply, 2.OE, 2854Fb, 1-314"x14 718", 2-ply (3-112"x14-718") Supports: 1,4-Lumber-soft Sill plate,S-P-F No.1/No.2; 2,3-Timber-soft Beam, D.Fir-L No.2; Total length:24'-6,0"; Lateral support: top=full, bottom=at supports: Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion An a 1 v s i s Va 1,u e 2as.--j n e An:a lys i 1 g; poPERT T. shear 98 20 tv/Fv' 9.34 ''' LEV 583 Fb' = 2853 &1 Fb 0.2G Rending (f) ,, 40570 Sending(-) fb = 868 Fb' = 2722 fb/Fb' 0.32 Live Uefi'n 0.04 - <L/999 2 5 = L/480 CIVIL 0.12 ti_1 l l March 28, 2014 t 3rucsura€�Givi(��rr; r�g �� rleetQwiIcbI4;ret Richard Lloyd Kohl Construction 31 Campus Plaza Road Hadley MA 01035 RE: 140 Hillcrest Drive, Northampton, MA. Engineered Wood Components; Project#13118 Mr. Lloyd: Enclosed are the design calculations for the structural members of the single family residence at 140 Hillcrest Drive in Northampton, MA. They are labeled as BM 1-1, BM 1-2, BM 1-3, BM 1-4, BM 2-1, FLSHBM 2-1, FLSHBM 2-2, FLSHBM 2-3, FLSHBM 2-4, and RDGBM R-1 in plans by Kohl Construction entitled, Gould/Matson Residence, 1407 Hillcrest Drive, Northampton dated 10/2912013. Please call if you have any questions regarding this project. Sincerely, u-I-R T. `-T 40570 2 CIVIL Robert Leet, P.E. -� Encl. Vim ' F-1 I WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN FLSHBM 2-1.wwb WoodWorks@ Sizer 10.1 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : A-alvsis Val'_-e Des i a Va I e A al y 5--'S/D e S i gn S� ea- 93 B n d ric f b 3261 2" _ /999 0.22 IJ 4 8 ve Deflln 0.03 <-I - 240 Total Def' 'n Additional Data FAC T 10 R S Ct 285 1.0C 2 m -7 -0 2 CRITICAL LOAD COMBINATIONS.- 6, b s D_S, 0, V Bena in�� 4 D- 5�:' ...=dead S=snow TAwina 'Mr E-earz" 101 U a All LCI 3 are e e �n CALCULATIONS: F b- e" de..`71 ec e 1 5 D a Design Notes: 1, WoodWorks analysis and design are in accordance with the ICC International Building Code(IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3, SCL-BEAMS(Structural Composite Lumber): the attached SCL selection is for preliminary design only, For final member design contact your local SCL manufacturer. 4. Size factors vary from one manufacturer to another for SCL materials. They can be changed in the database editor. 5. BUILT-UP SCL-BEAMS: contact manufacturer for connection details when loads are not applied equally to all plys. ROOEW'T LEFT TRUCIWRA 3,3942 IST via COMPANY PROJECT Gould/Matson WoodWorks 140 Hillcrest Drive SGrrWA#If0*W00.9XWW'N Northampton Kohl Construction Mar. 28, 2014 09:40 BM 2-1 wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load Tyy-,, Distribution PaW Wcacian W Magnitude Unit tern slalz End Start End S1 Snow ToLni 9.2-5 3280 bs Li Live Point 3797 ....biz e Full Area 4040 (�KVI Psf Self-Weisht Dead Full WDI Tri��utary -,,jidzh (ft) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : ------------------ ---------- ..... ... -n a ct c red 0! 18'4.6" Dead 195 1 live 24381 Snow Factorec* 3279 Toza- 3246 Bearing: Capacity Beam 5346 supparms 3246 3279 Anal/Des Beam 0.611 0.61 Support 1.00 1.0 T e"Lc)ad com]b 43 43 1.37 .36 Min rsq'd 1.36— Cb n c t, m- I.viii 1,07 1 Cb suppor, 1 .07 4W Fcp sup 425 "Minimum bearing length governed by the required width the supporting member. LVL n-ply, 2.OE, 285OFb, 1-314"x14' _3-,plyffi-1/4*"Ix14tt) Supports:All-Lumber-soft Sit] plate,S 7-17 o.1/No-2 Total length: 18'-6.0"; Lateral support:top=full, bottom=at supports; Repetitive factor: applied where permitted{refer es ROBERT T, Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012: LEFT i Criterion Ana_ sus Value !Design "'a:1, a is/Design STRUCTURAL Shear f = 65 1 W _ K8 tvlFv, = 0.20 38942 Bending(-) fb - 1903 FbI = 3337 fblFb' = 0.57 - Live Defl'n 0.54 = L/406 LI;&I = L/30, 0.89 AL 0.5,6 = L/382 3. 92 = L/2411) Total Defi'n 0. 63 COMPANY PROJECT 43� GouldlMatson Wood Works 140 Hillcrest Drive Northampton Kohl Construction Mar. 28, 2014 09:25 FLSH BM 2-1 wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load 7ype DistrLburian Pat- Locamion Efc] Magnitude 7nit to End Start End ---- di Dead IFull Area IN, 10.0070.0c) - P I I— Snow Full Area No 4QACUVQ0! * Psf d2 Dead Full Area N o' 0.0 C PSf ,self-wLight Dead full UDL —too 1210 Ulf ''Tritutary Witt'.-, ift) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-6" .......... ............ ............... 01 WS" 105.1" UnfactarQ Dead. 120 190 Snow 226 3690 Facoured: 7ot3l 346 5647) 2224 Pearing: Capacity - 9982 3544 3ea:' 1312 2224 Supports 8233 5643 Anal/Des 0.6' Beam 0.26 supporn 0.42 1.00, 1.00 Load comb 42 42 #2 Length 0.50, 3.43 1.3i min req'd 0.50- 3.43— 1.35— Cb 1 0 1.W. i. Cb min 1 .MCI Cb support Fcp sup ,, 4251 . ....... 421, 4 05 *Minimum bearing length setting used: 1/2"for end supports **Minimum bearing length governed by the required width of the supporting member. LVL n-ply, 10E, 2850Fb, 1-314"x11-718", -ply(3-112"x11-718"} Supports:All-Lumber-soft Sill plate, S- Total length: IT-6,0"; Lateral support: top=full. bottom=full; ROBERT STRUCTURAL 38942 is COMPANY PROJECT WoOdWorks' Gould/Matson 140 Hike Drive Northampton Kohl Construction Mar. 28, 2014 09�27 FLSHBM 2-2,wwb Design Check Calculation Sheet WoodWorks Sizer 10,1 Loads: c.a Type Distribution t Paz- W=:ic'n ft] M aq n:.tu,d UnK terni Start End Start End di 0 e ad" ivil Area No _0. .0 ,10.";"',) - sl Snow Fu:l Area N 43.00 10.'Cui f j 2 De ad Full Area 1�2.00 J. ten. psf Self-wemq= Dead Full UDL No 12� *Tribi,i�:ary Wid-, h Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 15-6.. .....-- 4 ----------- . . ................ ................... ..................... ................................... U 15'-4.9" 3nf acaorwa: 6 14 4 We'd 7ea 57 9 _01 - Snow 1092 now 11TFactored: lam T_-7-a 1 1 10 Bearinq: Capacity Ream, 2664 2966 Supports 167i 5299 1861 Anal/Des Ream 0.63 0.57 0.634 Support 0 11", i , i.01 Load comb 02, 1 #2 42 Length i.0i I 3.S8 1.13 Min req'd V 1.00 Cb Cb Min h 00, Cb support 1 W, 425 1 14 **Minimum bearing length governed by the required width of the supporting member. LVL n-ply, 2.OE, 285OFb, 1-34111141 ', 2-ply (3�-�1/2"x�11-718�") Supports: All -Lumber-soft Sill platqe�, - - o.1/ 0. Total length: 16-6.0"; Lateral support: top=full, bottom=full; Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Q', ROSERTT, LEFT criterion Analysis value Desian Valu'- AnaIvsis/-,es,-_Ajn STHUCTURAL Bending(+) Eb/Fb' = 0.13 4- 38942 Q = 413 wl' = 3281 4- -)STI fb = 665 Fb' = 3221 0.2C 90, Bending(-) Live Defiln 0.02 = <L/999 0.20 = 0480 0.0p Total Cefl'n 0.03 - <1/999, 1 0.40 ,=, L/2401-1- 0.07 COMPANY PROJECT GouldlMatson Wo dWor s 140 Hillcrest Drive Northampton Kohl Construction Mar, 28, 2014 09:30 BM 1-2,wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load. Type LUsiributionlPat- Vcation =1 Magnitude I unit I7:ern a r t E n a Start End Live Area No 40.00 (5.00 - c's'' di Dead Full Area No :0.00 (5.00) , psf Self-Weiqht D e a C Full 2.'0 cif i 'Tributary Width UW Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths On) : --------------- 01 T-6" 164, Dead 172, 60 19 Live 549 1939 612 Factored: 7C 7:a' 7 19 2340 801 3earing: capacity Ream 1312 3737 1312 Supports - 250C - Anal/Des aeam 5 Support Load comb 42 P2 #2 L en,g 0 0 1 0.50* Min req'd 0.5Y C.50* 0 1 .36 1.00 W Min 1.00 1.36 1 .00 Cb support ! - Fcp SUE — - 6251 *Minimum bearing length setting used: 1/2"for end supports **Minimum bearing length governed by the required width of the supporting member. LVL n-ply, 2.OE, 2850Fb, 1-3/4""x11-7/8 C2-ply�(3-1�/2'-*xl�1-7/8"�� 1 r_ 0. Supports: 1,3-Non-wood; 2-Timber-soft Bea jr- o. Total length: 16-6.5"; Lateral support:top=full, bottom= at supports; Repetitive factor: applied where permitted {refer OAOOO T. Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : ROBERT LEFT Criterion ... AnaL sis Valut Desian Value Analysis/2eliln STRUCTURAL Shear fv = 37 FVf = 215 0.13 389402 wendinqC,) fb = 179 W - 2853 fb/Fb' = C.0c Bending!-) th = 288 Fb' = 2764 fb/FbI , 0.10 live Defl'n C.01 = U/999 0.27 - L/360 0.03 Total Defl'n = <L/999 x.40 = 1/242 0.03 COMPANY PROJECT Gould/Matson WWoiks 140 Hillcrest Drive Northampton Kohl Construction Mar. 26, 2014 15:58 BM I-I.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Loaa Type Diszriburian PaW LoCation ffz] Magnizude U07: _ems"" I S:Z a r t End to End Livk Full Area 4 0.0 G ,1r.0 0 psf d- Dead Ell: Area p5f Self-weight D a ad Foil UW 9. 3 C-'.f *Trib--uzary Width (ft) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : ... ........... --7,7777:-, .......... 01 10, Dead Z47 547 live WO 2 0 0 Factored: T c ta 1 2547 2547 Bearing: Capacity Beam 25' 2547 Anal/Des load comb Q 02 Min req'd 0.91 1 Oil C-1 1 Cb r:,&i n i:00 LVL n-ply, 2.01E, 285OFb, 1-314"x9-114"' 2-ply (3-1/2'"'x9-14V") Supports: All-Non-woo Total length: 10'-1.0"; Lateral support:top=full, bottom= at supports; Repetitive factor: applied where permitted(refer to online help); Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012: Criterion Analysis Value Design Value Analysis/Design Snear f 11 99 Fv' = 285 fv/Fo* OAK" OSERT T. Sending(+) Q - 1531 F'; ' = 2'�53 thlFb, 0.52 LET Live DeflIn 0.19 - WHE 0.33 = 1/3 0.W Toyj DQI'n 0.27 = L/436 0.50 = L/240 0.55 STRUG7UPAAL 38! Q 4- COMPANY PROJECT Gould/Matson WoodWorks 140 Hillcrest Drive 90"WA"fop*000 0#001 Northampton Kohl Construction Mar. 28,2014 09,1148 FLSHBM 2-4.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: I c,C o f�I a Q n i e -S 0 ;s S I f-� Are-n y e- 1 P S f ea d a r y Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 16-7.8" ............ ................. ="".............. 01 6* 2914 �e 0 C99 2' 3er 7 4 5 I "D 3ea- -3 P P o r jj w 4t 4 31, 4-2 g :26i 42,1 "Minimum bearing length governed by the required width of the supporting member. LVLn-ply, 2.OE, 285OFb, 1-3/4"xil-7/8", -ply {3-1/2"x11-7I8") , �Iy (3Z,::!-::5 Supports: All-Lumber-soft Sill plate, S- Total length: 16-7-8"; Lateral support: top=full, bottom=full; Repetitive factor" applied where permitted (refer to online el Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : r--- R BERT T_ 11 I -11�e V a Analysis 'Va,�e D� zi 44 :V Ir S LEET shear STRUCTURAL RAL 38942 Fb' f t, b f 0.1211 <L 9 9 DI e f Sri 3 /768, 3 53 L 2, ,n, ..3.1 COMPANY PROJECT WoGo0 uld/Matson odWorks 140 Hillcrest Drive pv"WAM fps Wwa"Vzx Northampton Kohl Construction Mar. 28, 2014 09:49 RDGBM R-l.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Lc a d, 7ype 73—istributicn Fat- Lccanicn [W Magnirude Unit gyn Starm End Start End Dead 0all Area N c' 12 AM K&5 0) PH Full y es S 0 6.5W psf Self-weight Dead Vull UDL ND 9.3 Wif *Tributary Width �tz) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 2V 01 10'-5" 20_10" Dea-c: 2 7 GO sic Snow 2444 752t- 2444 Tota"L 3254 1020 32541 Bearing: Capacity Beanl ✓1 J'7 62 K 5197 Supports 3254 11220, 3254 Anal/Des 5eam 0.63 0.6-4 Sap r_ 1.00 1.0_"; Loa,'d comb 3 02 04 6.21 1.9a Lengun 1 .98 Min req'd 11.98-- Cb 1. , l 1.00 C'_' Cb support Fcp sup 1 425 42t 1 415 "Minimum bearing length governed by the required width of the supporting member. — ----------- LVL n-ply, 2.OE, 285OFb, 1-314"x9-1/4'Cr2-ply�(3-112�"x9-114") Supports: All-Lumber-soft EWI plate, o.;l/No.2 Total length: 21'; Lateral support: top=full, bottom=at supports, Repetitive factor: applied where permitted(refer to online help); Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : r Criterion Analysis Value DesLqn Qlue lAnalysis/Design Shear fv = 200 F-j' = 328 WOO - 0.61 COEAT T, Sending(-'; fb = 1622 Fb' = 3395 O/W - 0.48 Bending(-) fb _. 256C F'b' 3258 = G.7 19 LEET I RUCTU[gyp L Live DeflIn 0.18 = L/676 0.26 = L/40 0.71 filn 0.26 = L/484 0, 52 = 1/240 0.50 38942 Total De --------- ICOMPANY PROJECT Gould/Matson 140 Hillcrest Drive WoodWorks' Northampton Kohl Construction Mar. 28, 2014 09:36 BM 1-3.wwb Design Check Calculation Sheet WoodWorks S izer 10.1 -------Magnitude unit Low-, Type Distribution Fat- Location [Q] ter. n di ID a a d Fall Area N2;0 00,16.50) , psf L i v e Full Area Y p s f S e 1 f-WeAn Dead Full -Tribatary Wiisd Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) ................ 01 011.6" 16*4 8" "ifs ored T Dew 2 67 2312 8 97 Live 1729 71919 2995 Factored: Upli&l 69i 70tal 2 0 5 6 3793j lBearing: Capacity Beam 336" 1714-1 624 ? r`3 2,05 6 9511 3793 Anal/Des Beam 0.61 0.55� 0.6i su-port 3 V 1. Lold COMA 42 #4 1.59 Length 3.9`,i min reqla, 0.86— 305— 1.59— 1.00 1.09 cb min 4251 1 i 0,111 Cb 25 425, jQ2 WE J S_,ppc,.-- 1 7 **Minimum bearing length governed by the required width of the supporting member. --------------- ILVL n-ply, 2.OE, 285OFb, 1-3/4"x9-1/4" 3-ply (6-114"x9-1/4" Supports: All- Lumber-soft Sill plate, S- - o. o. Total length: 16-6.0"; Lateral support: top=full, bottom=at supports; Repetitive factor: applied where permitted (r 80 ERT T Analysis vs. Allowable Stress (psi) and Deflection (in) using NOS 2012 : LEFT Criterion Analvsis Value es an Value n_ a_ysis/Desi STRUCTURAL Shear fv = 142 FvV - 205 `ti/r = 0.50 30942 Benaingk) Q = 1322 Fb' - 3071 1 fb/Fb' = 0.43 fb = 1436 Fm - :1035 -1 Bending( I N/Fb` = G.4 Total ✓ jl'n , 0.23 = L/553 , 0.5 2 , `t4 l.'43 N_.I, t I March 28, 2014 Stuxt,, al& mr, i F09 88',WenclO,APIA Q'379 telifax'"78-544-8CCO rleet wdCUue net Richard Lloyd Kohl Construction 31 Campus Plaza Road Hadley MA 01035 RE: 140 Hillcrest Drive, Northampton, MA, Engineered Wood Components; Project#13118 Mr. Lloyd: Enclosed are the design calculations for the structural members of the single family residence at 140 Hillcrest Drive in Northampton, MA. They are labeled as BM 1-1, BM 1-2, BM 1-3, BM 2-1, FLSHBM 2-1, FLSHBM 2-2, FLSHBM 2-4, and RDGBM R-1 in plans by Kohl Construction entitled, Gould /Matson Residence, 140 Hillcrest Drive, Northampton dated 10129/2011 Please call if you have any questions regarding this project. A Sincerely, OF ' ROBERT T. LEET Robert Leet, P.E. STRUCTURAL 38942 Encl. , °i` Nay- Fieouidd 1 R' SYN ��3 11/7/13 Cityof Northampton Mail-140 Hillcrest Drke 140 Hillcrest Drive Louis Hasbrouck <Iasbrouck @northamptonma.gov> Thu, Nov 7, 2013 at 1:56 PM To: Richard Lloyd <riloyd @kohl construction.com> Cc: Carolyn Misch <cmisch @northamptonma.gov>, Charles Miller<cmiller @northamptonma.gov>, Kyle Scott <kscott @northamptonma.gov> Richard, I've reviewed the permit application for a single family home at 140 Hillcrest Drive. I can't approve the application because it would create a zoning violation. As presented, it would require a variance in accordance with Northampton zoning 350-9.3 (B) (3). The variance would likely not be allowed. The short version is that the lot at 140 Hillcrest was in common ownership with the lot at 44 Kimball St. Under the (widely accepted and supported by case law) merger doctrine, the lots were merged when they came into common ownership (apparently in 1977)They merged because the lot at 44 Kimball Street (contiguous and in common ownership at that point) lacks sufficient frontage to be a conforming lot. Division of those two lots would result in a non-conforming lot at 44 Kimball St. I've included a link to a court case that explains the law. Feel free to call me if you have more questions; there may be some other options. http://masscases.com/cases/app/51/51massappct236.htmi Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax https://mail.g oog le.corrVmail/ca/u/O/?ui=2&i k=ec5fl9a57e&uev.-pt&search=sent&th=14233ecaOf42f4c9 111 N I' m ✓ OO (O " O a X W a (C) o c O L f 0 W rn o :D W Z y N V O .c 1 > F- c O V ULL 0 CO? REVISIONS # Revision/Issue Init Date N 2 �i HILLCREST DRIVE ASPHALT APRON E0 co ----------- --- —� STONE DRIP {.: I EDGE f STONE DRIP EDGE 'Ilk 31.9'.. %"-Y2"STONE DRIVEWAY r15' CONCRETE I PAVERS x-15' L------ ------- 0 r-- JOBNAME DATE Kohl Construction GOULD/MATSON RESIDENCE 10.29.2013 SP-1 SCALE 31 Campus Plaza Road,Hadley,MA 01035 TITLE N — ph(413)256-0321 fx(413)256-0130 SITE PLAN -140 HILLCREST DRIVE 1 - 30 OF COPYRIGHT©KOHL CONSTRUCTION,INC 10/31/2013 08:43 413-256-0130 KOHL CONSTRUCTION PAGE 02 Kohl Construction w w www.KohlCon-,truction.com 31 Campus Plaza Road,Hadley,MA 01035 ph(413)256-0321 fx(413)256-0130 Northampton Building Permit Fee Schedule Building Location: Gould Matson 140 Hillcrest Drive, Northampton, MA, 01062 Basement @ .20 per Sq Ft x 1807 = $ 361.40 1St Floor @ .50 per Sq Ft x 1807 - $ 903.50 2nd Floor @ .30 per Sq Ft x 583 - $ 174.90 Floors @ .20 per Sq Ft x x - xxx Finish Attic @ .20 per Sq Ft x X = xxx Garage @ .20 per Sq Ft x 575 = $ 115.00 Deck/Porches @ .20 per Sq Ft x 235 - $ 47.00 Total Permit Fee: $1,601.80 The Commonwealth of Massachusetts Department of Industrial Accidents lb Office of Investigations 600 Washington Street Boston,MA 02111 www mass gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): Kohl Construction, Inc. Address: 31 Campus Plaza Road, Suite 3 City/State/Zip: Hadley, MA 01035 Phone#: 256-0321 Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 10 4. ❑ 1 am a general contractor and 1 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp.insurance. 9. ❑ Building addition [No workers' comp.insurance 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions required.] officers have exercised their 3.El am a homeowner doing all work right of exemption per MGL 11.❑ Plumbing repairs or additions myself. [No workers' comp. c. 152,§1(4),and we have no 12.❑Roof repairs insurance required.]t employees. [No workers' 13.❑Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: AIM Mutual Insurance Company Policy#or Self-ins.Lic.#: WMZ 800287201 2010 Expiration Date: 02/10/14 Job Site Address: 140 Hillcrest Drive, Northampton, MA City/State/Zip: 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains andpenalties of perjury that the information provided above is true and correct Si nature: Date: Phone#: 256-0321 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Bk: 11611 Pg: 314 ` R F Zoning Board of Appeals-Decision City of Northampton Hearing No.:ZBA-2014-0010 Date: March 7, 2014 IMOTION MADE BY: SECONDED BY: OTE COUNT: DECISIOM j. Sara Northrup Elizabeth Silver 3-0 I Approved MINUSES OF MEETING: Robert Riddle is a Non-voting(associate member who only votes in the absence of a member).Elizabeth Silver is also an associate e member and the Board determined that she would act in the absence of the one full member who was not present Minutes available in the Office of Planning b Development 1,Carolyn Misch,as agent to the Zoning Board of Appeals,certify that this is a true and accurate decision made by the Zoning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on the filing date noted above. I certify that a copy of this decision has been mailed to the Owner and Applicant (�djo�Am J i NOTICE OF APPEAL An appeal from the decision of the Zoning Board may be made by any person aggrieved and pursuant to MGL Chapt 40A,Section 17 as f amended,within(20)days[30 days for a residential Finding]after the date of the filing of this decision with the City Clerk The date of filing Is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk E of Northampton. j t MAR - 7 2014 i a March 28, 2014 I, Wendy Mazza, City Clerk of the City of Northampton, hereby certify that the above Decision for an appeal on the Building Commissioner's determination from the Northampton Zoning Board of Appeals was filed in the Office of the City Clerk on March 7, 2014, that twenty days have elapsed since suc filing and that no appeal has been filed in this matter. Attest: t Wendy Ma a, City Clerk City of Northampton s' 33 3 t {{i k i i GeoTMS®2014 Des Louriers Municipal Solutions,Inc. ���� / .ATTEST: HAMPSIIIRE, 'fit ` , REGISTER MARYOLBERDIUVI Bk: 11611 Pg: 313 Zoning Board of Appeals-Decision City of Northampton Hearing No.: ZBA-2014-0010 Date: March 7,2014 APPLICATION TYPE SUBMISSION DATE: B k: 1161113g:313 Page: 1 Ot 2 Appeal 1220/2013 Recorded: 03/31/2014 03:44 PM I Applicant's Name: Owner's Name: NAME NAME Green Miles Lipton,LLP GOULD ROBERT ADDRESS: ADDRESS: 77 Pleasant St 17 FLORENCE RD ' 4 x TOWN: STATE LP CODE TOWN: STATE: LP CODE NORTHAMPTON MA 01061 FLORENCE MA 01062 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: 4 (413)587-3796 0 EMAIL ADDRESS: EMAIL ADDRESS: i E R Site Information: Surveyor's Name: STREET NO.: SITE ZONING: COMPANY NAME: 140 HILLCREST DR URA(1001/ TOWN: ACTION TAKEN: ADDRESS: FLOREN CE MA 01062 Overturn Building Commissioner's Decision MAP: BLOCK LOT: MAP DATE SECTION OF BYLAW: 17A 297 001 Chpt 350-4.10:Variances d Appeals TOWN: STATE ZIP CODE Book age: 1 1 239 PHONE NO.: FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK Appeal of Building Commissioner's determination that two lots had merged,thereby denying construction of a single family house with garage HARDSHIP: CONDITION OF APPROVAL FINDINGS: The Zoning Board of Appeals overturned the Building Commissioner's determination that two lots(one with an existing single family home abutting a second parcel that was not previously developed)had merged In making the determination that lots had merged,the Building Commissioner denied approval for construction of a new single family house on the abutting parcel. t The Board determined that because of the unique aspects of the two parcels in question,a merger had not taken place when the two parcels were jointly up until the current separate ownerships that were created in December of 2012 Specifically,the Board discussed that the parcel with the existing single family house that was undersized for frontage,lot width and lot layout had access from Kimball Street through a narrow portion of the parcel that contained the driveway to that house. The abutting and subject parcel fronted Hillcrest Road and had never been used by the Kimball Street parcel for access or any other purpose and even if a strip were maintained by the )GmbaN St parcel to comply with zoning,it would never be necessary for or used for access to the Kimball St parcel. COULD NOT DEROGATE BECAUSE FILING DEADLINE: MAIUNG DATE HEARING CONTINUED DATE DECISION DRAFT BY: APPEAL DATE: 1128M14 2/222014 311312014 REFERRALS IN DATE HEARING DEADLINE DATE: HEARING CLOSE DATE FINAL SIGNING BY: APPEAL DEADLINE 21152014 3252014 227/2014 311311014 327/2014 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 21132014 2272014 22711014 3/712014 SECOND ADVERTISING DATE EARING TIME OTING DEADLINE DECISION DEADLINE: 220/2014 5:45 PM 3/3011014 3/30/2014 MEMBERS PRESENT: VOTE E1lzabeth Silver votes to Grant Malcolm B.E.Smith votes to Grant Sara Northrup votes to Grant Bob Riddle votes to no action needed GeoTMS®2014 Des Laumiers Municipal Solutions,Inc. mom I SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: y� Not Applicable ❑ Name of License Holder: TZ LC..WAr 2 V� ` , ` S `� q4 License N imber $� !FdLAR--rA- AyE . '�4,D 2TJ-k4Mf i cw (VA rs Addre alp 6.y Expiration Date 5 • Z3 Signature Telephone 9,Reaisterei!Home Improveiment.C`ontractbrK Not Applicable ❑ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ '' 09h a . Tom �i`er. em fi©i The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildinE permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House � Addition ❑ Replacement Windows Alteration(s) El Replacement ❑ Or Doors O Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [Q Siding[O] Other[M Brief Description of _ Proposed 01F V4 NWork: CO+ W ALE P4XtA'J ('J4 E aMb Wl T GC nC►',�G�i 9 11 1 Alteration of existing bedroom Yes X No Adding new bedroom Yes K No Attached Narrative Renovating unfinished basement Yes e: No Plans Attached Roll -Sheet sa IfNe�:1�' use and o dditio to zistiri``F�OUS h comp lets tfi follrwin`:.: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: L CD Number of Bathrooms c. Is there a garage attached? 'lD70-_CA .b1le C> 411Qk � AAAA 066 d. Proposed Square footage of new construction. Dimensions 56'k Lt0, Z`� sC e. Number of stories? f. Method of heating? ELoCC FORAY-- 9< -0 I IL, Fi ces Woodstoves � Number of each g. Energy Conservation Compliance. ` ES Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes NV No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade ! _J'�/ k. Will building conform to the Building and Zoning regulations? 1 65,' Yes No., I. Septic Tank City Sewer 1// Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, E,1 ice!0,4 as Owner of the subject property �1 hereby authorize .C.�2 !/• wa� to action my behalf in all afters relative to work authorized by this building permit application. ?.b t Signature of Owner Date C)• �"� \ as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. RA cib o mc> D, Print Nam lC) 3• Z tot Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front L _.., _= Side L: a__.� �. __., R: Rear Building Height % Bldg.Square Footage Open Space Footage (Lot area minus bldg&paved _, parking) #of Parking Spaces Fill: •,. _ . �c7 l�'rG (volume&Location) F- _ _v. A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW Q YES Q IF YES, date issued:] IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW 0 YES 0 IF YES: enter Book Page and/or Document#, B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued C. Do any signs exist on the property? YES Q NO IF YES, describe size, type and location: AIL D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. �C �,r t _.,�; City of Northampton Status o erfn�' �� !1 ,a &A Building Department O& 212 Main Street Room 100 Northampton, MA 01060 T c phone 413-587-1240 Fax 413-587-1272 . APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office, q+ q.© R l LA r'lWeST D(Ll CPC, Map I ±7 Lot" 7 Unit Nc7i2.'t1fioW,Q"Cap,j 01062 �— Zone Overlay District Elm St.District CB District SECTION 2 PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: L4*140A K"i S 1,4 Az a 3E Q;-% wL.D �.� F�.a lt.c�.ft �,�D , NQT2.7H,atA�►P'C�' Name(Print) Currer Mail �AdessL��LA� Teleph�onn'e Signature 2.2 Authorized Agent: TztCA4A2sD -b 31 CAI'APLAS PL4t7A RU-AD liADUEY VA a Name(Prin Current Mailing Address:it_LJLjL (cf t , Z56 03Zl x'i" lla V Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 2v , U C> a (a)Building Permit Fee 2. Electrical dt t (b)Estimated Total Cost of t Construction from 6 3. Plumbing d L t Building Permit Fee Y � 4. Mechanical(HVAC) (. 2 b b J ..- 5. Fire Protection 1 6. al=A1 +2+3 4+5) ` 5 O� �� Check Number This Section For Official Use Only Date Buildi g Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date SDA GK! T) File#BP-2014-0566 �Z,I I l _ C APPLICANT/CONTACT PERSON KOHL CONSTRUCTION ADDRESS/PHONE 31 Campus Plaza Rd HADLEY (413)256-032 1 3�0 4_p.3 0) (3) PROPERTY LOCATION 140 HILLCREST DR / MAP 17A PARCEL 297 001 ZONE URA(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildinp,Permit Filled out Fee Paid J Typeof Construction: CONSTRUCT 2 STORY SFH W/DET GARAGE&PORCH New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 96576 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO ATION P SENTED: / 11 /7/1 Approved VAditional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ P" Intermediate Project: Site Plan AND/OR Special Permit With Site Plan G f Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management e ela -02 Signature of B ding Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 140 HILLCREST DR BP-2014-0566 GIS#: COMMONWEALTH OF MASSACHUSETTS Map-.Block: 17A-297 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:New Single Family House BUILDING PERMIT Permit# BP-2014-0566 Project# JS-2014-000945 Est. Cost: $154000.00 Fee: $1601.80 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: KOHL CONSTRUCTION 96576 Lot Size(sg. ft.): 20342.52 Owner: GOULD ROBERT Zoning:URA(100)/ Applicant: KOHL CONSTRUCTION AT. 140 HILLCREST DR Applicant Address: Phone: Insurance: 31 Campus Plaza Rd (413)256-0321 Workers Compensation HADLEYMA01035 ISSUED ON:41312014 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 STORY SFH W/DET GARAGE & PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancv Signature: FeeType• Date Paid: Amount: Building 4/3/2014 0:00:00 $1601.80 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner